← Back
Two family converted from one family
146-06 GEORGIA ROAD
QUEENS · BIN 4117551
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3XZoning
—Gross Floor Area
2Units
Two family converted from one family · 0.51 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 19 docs
Cellar1p · 1 filing · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.309/14/2026
MEI ARCHITECT PLLC103/27/2026
Building Lifecycle
All (28)Filed (4)Special Inspection (24)
09/14/2026
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01373322-S4
05/29/2026
Filed — Alteration
Q01335299-I1
04/10/2026
Filed — Full Demolition
FULL DEMOLITION OF EXISTING 2-STORY DETACHED RESIDENCE.
Q01331481-I1
03/27/2026
Filed — New Building
INSTALLATION OF PLUMBING AND SPRINKLER WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Q01373322-I1
03/25/2026
Special inspection requirement — Permanent certificate
03/25/2026
Special inspection requirement — Heating Systems
03/25/2026
Special inspection requirement — Protection of exposed foundation insulation
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
03/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/25/2026
Special inspection requirement — Fenestration air leakage
03/25/2026
Special inspection requirement — Air barrier — testing
03/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/25/2026
Special inspection requirement — Maintenance information
03/25/2026
Special inspection requirement — Air barrier - visual inspection
03/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/25/2026
Special inspection requirement — Fenestration areas
03/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/25/2026
Special inspection requirement — Insulation placement and R values
03/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/25/2026
Special inspection requirement — Metering
03/25/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/25/2026
Special inspection requirement — Interior lighting power
03/25/2026
Special inspection requirement — Ventilation and air distribution system
03/17/2026
Special inspection requirement — Mechanical Systems
03/17/2026
Special inspection requirement — Final
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDBARMOR REHAB INC04/10/2013
BISPLISSUEDBARMOR REHAB INC04/10/2013
BIS—ISSUEDKINGS STAR CONSTRUCTION C01/18/2013
BISOTISSUEDKINGS STAR CONSTRUCTION C10/22/2012
1 project · most recent 09/14/2026
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
09/14/2026——Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 09/14/2026
Steel Masonry Wood
FiledStatusContractorScope
09/14/2026——Steel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
03/25/2026Permanent certificate—energy_progress
03/25/2026Heating Systems—special
03/25/2026Protection of exposed foundation insulation—energy_progress
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Subsurface Investigations (Borings/Test Pits)—special
03/25/2026Energy Code Compliance Inspections—progress
03/25/2026Fire-Resistance Rated Construction—progress
03/25/2026Fenestration air leakage—energy_progress
03/25/2026Air barrier — testing —energy_progress
03/25/2026HVAC-R and service water heating system controls—energy_progress
03/25/2026Fenestration and door U-factor and product ratings—energy_progress
03/25/2026Maintenance information—energy_progress
03/25/2026Air barrier - visual inspection—energy_progress
03/25/2026HVAC-R and service water piping design and insulation—energy_progress
03/25/2026Fenestration areas—energy_progress
03/25/2026Duct leakage testing, insulation and design—energy_progress
03/25/2026Insulation placement and R values—energy_progress
03/25/2026HVAC-R and service water heating equipment—energy_progress
03/25/2026Metering—energy_progress
03/25/2026Electric vehicle service equipment requirements—energy_progress
03/25/2026Interior lighting power—energy_progress
03/25/2026Ventilation and air distribution system—energy_progress
03/17/2026Mechanical Systems—special
03/17/2026Final—progress
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026Q01373322-I1Request digital key ↗
08/17/2026Q01331481-I1Request digital key ↗
08/16/2026Q01335299-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION4
02/06/2014420784887Open ↗
08/17/2013420784887Open ↗
01/16/2013420784887Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
04/17/2013420634317Open ↗
04/17/2013420784887Open ↗
01/24/2013420784887Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
07/31/2013420784887Open ↗
06/13/2013420784887Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q01373322-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026Q01373322-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026Q01373322-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/22/2026Q01373322-S4Open ↗
09/22/2026Q01373322-S2Open ↗
09/22/2026Q01373322-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/27/2014420784887Open ↗
01/14/2014420634317Open ↗
01/24/2013420784887Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/26/2026Q01373322-S3Open ↗
09/23/2026Q01373322-S3Open ↗
09/23/2026Q01373322-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/10/2012420784887Open ↗
10/17/2012420634317Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/10/2012420784887Open ↗
10/17/2012420634317Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/26/2026Q01373322-S3Open ↗
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE10
02/13/2014420784887Open ↗
02/04/2014420784887Open ↗
12/04/2013420784887Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING3
01/16/2013420784887Open ↗
11/10/2012420784887Open ↗
10/17/2012420634317Open ↗
▸BISDETECTOR:SMOKE-CERTIFICATE OF INSTALLATION1
08/17/2013420784887Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
11/10/2012420784887Open ↗
▸DOB NOWStreet Tree Checklist1
08/17/2026Q01373322-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/10/2012420784887Open ↗
10/17/2012420634317Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/06/2014420784887Open ↗
01/08/2014420634317Open ↗
01/24/2013420784887Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/06/2014420784887Open ↗
01/14/2014420634317Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
09/22/2026Q01373322-S1Open ↗
08/17/2026Q01373322-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE3
12/13/2012420784887Open ↗
11/10/2012420784887Open ↗
02/27/2014420784887Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/10/2012420784887Open ↗
10/17/2012420634317Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
02/27/2014420784887Open ↗
01/08/2014420634317Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/20/2013420784887Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
02/27/2014420784887Open ↗
01/14/2014420634317Open ↗
11/10/2012420784887Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
11/10/2012420784887Open ↗
10/17/2012420634317Open ↗
▸BISADDITIONAL INFORMATION1
02/06/2014420784887Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01373322-I1Open ↗
08/17/2026Q01331481-I1Open ↗
▸BISPLOT DIAGRAM1
02/06/2014420784887Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026Q01373322-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026Q01373322-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01331481-I1Open ↗