← Back
Three families
146-20 146 PLACE
QUEENS · BIN 4104562
💬 Discuss this project
1920Year Built
2.75Stories
C0Building Class
R2AZoning
3,681 sfGross Floor Area
3Units
0 Open Violations
Three families · 6,617 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEDICATED CONSTRUCTION NY INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/13/2021$1.6M—— → —$421/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC409/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AJ EXPEDITING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KJK ELECTRIC INCElectrical103/22/2026
CK COOLING & HEATING INCGeneral Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506409/26/2022
Building Lifecycle
All (28)Filed (4)Permit Issued (2)Signed Off (2)Violation (1)Inspection (7)Special Inspection (12)
10/06/2022
Signed off — Alteration
INTERIOR RENOVATION AT EXISITNG 3 STORY RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00723826-I1
10/04/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/26/2022
Filed — Alteration
INTERIOR RENOVATION AT EXISITNG 3 STORY RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00723826-P2
09/26/2022
Signed off — Alteration
Q00723060-I1
09/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
09/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
09/20/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/29/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/20/2022
Filed — Alteration
INTERIOR RENOVATION AT EXISITNG 3 STORY RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00723826-P1
06/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/16/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2022
Permit issued — Plumbing
Q00723826-I1-PL
05/06/2022
Permit issued — General Construction
Q00723060-I1-GC
04/22/2022
Filed — Alteration
INTERIOR RENOVATION AT EXISITNG 3 STORY RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00723826-I1
04/22/2022
Filed — Alteration
Q00723060-I1
04/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
04/22/2022
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
04/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
04/22/2022
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
04/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
04/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
03/02/2022
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG05/10/2022
DOB NOWGeneral ConstructionSigned-offCK COOLING HEATING05/06/2022
2 projects · most recent 03/18/2022
General Wiring
FiledStatusContractorScope
03/18/2022CompleteKJK ELECTRIC INCGeneral Wiring
03/17/2022CancelledKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/04/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/20/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/29/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/29/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/25/2022Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
09/25/2022Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
09/25/2022HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
09/25/2022Maintenance informationXIAOHONG ZHAOenergy_progress
09/25/2022HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/25/2022HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
04/22/2022Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
04/22/2022Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
04/22/2022HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
04/22/2022Maintenance informationXIAOHONG ZHAOenergy_progress
04/22/2022HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
04/22/2022HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00723060-I1Request digital key ↗
08/26/2026Q00723826-P1Request digital key ↗
08/26/2026Q00723826-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q00723826-I1Open ↗
08/13/2026Q00723060-I1Open ↗
08/13/2026Q00723826-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00723826-P2Open ↗
09/02/2026Q00723826-P2Open ↗
09/01/2026Q00723060-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00723826-P2Open ↗
09/01/2026Q00723060-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00723060-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00723826-I1Open ↗
08/13/2026Q00723060-I1Open ↗