← Back
BuildNYC
Two family frame
146-23 JASMINE AVENUE
QUEENS · BIN 4117781
💬 Discuss this project
1925Year Built
2.5Stories
B2Building Class
R3-1Zoning
2,160 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 2,600 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHouse cellar, first, and second floor renovation1p · 2 filings · 16 docs
Floor 2House cellar, first, and second floor renovation5p · 2 filings · 16 docs
Floor 1House cellar, first, and second floor renovation6p · 2 filings · 16 docs
CellarHouse cellar, first, and second floor renovation8p · 2 filings · 16 docs
Site & exteriorHouse cellar, first, and second floor renovation5p · 2 filings · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri410/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor104/09/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
King's USA GroupGeneral Contractor109/18/2012
The Plumbing & Heating SpeciaPlumbing109/26/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394210/24/2025
Building Lifecycle
11/06/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01246136-I1
11/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/24/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01246136-P1
10/24/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER,BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01246139-P1
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating07/14/2025
DOB NOWGeneral ConstructionSigned-offKale Construction07/01/2025
BISPLISSUEDThe Plumbing & Heating Specia09/26/2012
BISOTISSUEDKing's USA Group09/18/2012
1 project · most recent 10/24/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/24/2025Signed-offJohn Fitzgerald Plumbing & HeatingGas, Storm, Water/Sanitary
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/24/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/24/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/24/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/24/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/24/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/24/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account