← Back
Two family converted from one family
146-32 BEECH AVENUE
QUEENS · BIN 4121303
💬 Discuss this project
1901Year Built
2.5Stories
B3Building Class
R3XZoning
2,108 sfGross Floor Area
2Units
Two family converted from one family · 5,000 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALPHA HOME DESIGN LLC202/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LC EXPEDITING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
ST SAFETY CONS. INCGeneral Contractor107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YAN GAO6619202/11/2022
Building Lifecycle
All (18)Filed (2)Permit Issued (2)Signed Off (2)Inspection (6)Special Inspection (6)
05/10/2022
Signed off — Alteration
ERECT 3-PC BATHROOM AT CELLAR(CRFN:2022000058097). INSTALL (4) A.C SPLIT UNIT AND PROPOSE INTERIOR RENOVATION OF 2-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00677338-S1
04/27/2022
Signed off — Alteration
ERECT 3-PC BATHROOM AT CELLAR(CRFN:2022000058097). INSTALL (4) A.C SPLIT UNIT AND PROPOSE INTERIOR RENOVATION OF 2-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00677338-I1
04/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/11/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/18/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/15/2022
Permit issued — General Construction
Q00677338-I1-GC-CX
02/14/2022
Permit issued — Plumbing
Q00677338-S1-PL
02/11/2022
Filed — Alteration
ERECT 3-PC BATHROOM AT CELLAR(CRFN:2022000058097). INSTALL (4) A.C SPLIT UNIT AND PROPOSE INTERIOR RENOVATION OF 2-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00677338-S1
02/11/2022
Filed — Alteration
ERECT 3-PC BATHROOM AT CELLAR(CRFN:2022000058097). INSTALL (4) A.C SPLIT UNIT AND PROPOSE INTERIOR RENOVATION OF 2-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
Q00677338-I1
02/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
02/10/2022
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
02/10/2022
Special inspection requirement — Fire-Resistance Rated Construction
YAN GAO
02/10/2022
Special inspection requirement — Duct leakage testing, insulation and design
YAN GAO
02/09/2022
Special inspection requirement — Mechanical Systems
YAN GAO
02/09/2022
Special inspection requirement — Final
YAN GAO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offST SAFETY CONS. INC02/15/2022
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC02/14/2022
1 project · most recent 02/18/2022
General Wiring
FiledStatusContractorScope
02/18/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/11/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/11/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
02/10/2022Fire-Resistant Penetrations and JointsYAN GAOspecial
02/10/2022Energy Code Compliance InspectionsYAN GAOprogress
02/10/2022Fire-Resistance Rated ConstructionYAN GAOprogress
02/10/2022Duct leakage testing, insulation and designYAN GAOenergy_progress
02/09/2022Mechanical SystemsYAN GAOspecial
02/09/2022FinalYAN GAOprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00677338-S1Request digital key ↗
08/26/2026Q00677338-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/26/2026Q00677338-I1Open ↗
08/13/2026Q00677338-S1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/23/2026Q00677338-I1Open ↗
08/23/2026Q00677338-I1Open ↗
08/23/2026Q00677338-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026Q00677338-S1Open ↗
08/26/2026Q00677338-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q00677338-I1Open ↗
08/23/2026Q00677338-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00677338-S1Open ↗
08/26/2026Q00677338-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/26/2026Q00677338-I1Open ↗