Two family converted from one family
146-33 56 ROAD
QUEENS · BIN 4116749
💬 Discuss this project
1935Year Built
1Stories
B3Building Class
R4Zoning
2,236 sfGross Floor Area
2Units
Two family converted from one family · 2,493 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 210p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
146-33 56TH ROAD1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2023$1000K—Private party → 146-33 56TH ROAD LLC$447/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT301/30/2025
ALPHA HOME DESIGN LLC201/27/2025
SQUARE ARCH, LLC110/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERGY SOLAR203/21/2026
FANG ARCHITECT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor603/21/2026
AMERGY SOLAR INCGeneral Contractor303/21/2026
KJK ELECTRIC INCElectrical103/22/2026
AMM GEN'L CONTRACTING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513201/30/2025
TRIANGLE INSPECTION & TES7495201/27/2025
YAN GAO6619201/27/2025
SQ. ARCH, LLC4802110/08/2024
Building Lifecycle
All (49)Filed (6)Permit Issued (4)Signed Off (3)Inspection (6)Special Inspection (30)
06/02/2025
Signed off — Alteration CO
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00991098-S3
05/28/2025
Signed off — Alteration CO
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00991098-S2
05/27/2025
Signed off — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01118296-I1
04/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2025
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
04/03/2025
Special inspection requirement — Interior lighting power
DEZHANG FANG
04/03/2025
Special inspection requirement — Fenestration areas
DEZHANG FANG
04/03/2025
Special inspection requirement — Maintenance information
DEZHANG FANG
04/03/2025
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
04/03/2025
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
04/03/2025
Special inspection requirement — Protection of exposed foundation insulation
DEZHANG FANG
04/03/2025
Special inspection requirement — Metering
DEZHANG FANG
04/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
04/03/2025
Special inspection requirement — Structural Steel - High Strength Bolting
DEZHANG FANG
04/03/2025
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
04/03/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
DEZHANG FANG
04/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
04/03/2025
Special inspection requirement — Masonry
DEZHANG FANG
04/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
04/03/2025
Special inspection requirement — Structural Steel - Details
DEZHANG FANG
04/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
04/03/2025
Special inspection requirement — Final
DEZHANG FANG
04/03/2025
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
04/03/2025
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
04/03/2025
Special inspection requirement — Footing and Foundation
DEZHANG FANG
01/30/2025
Filed — Alteration CO
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00991098-P2
01/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
YAN GAO
01/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
YAN GAO
01/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
YAN GAO
01/29/2025
Special inspection requirement — Maintenance information
YAN GAO
01/29/2025
Special inspection requirement — Energy Code Compliance Inspections
YAN GAO
01/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAN GAO
01/29/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
YAN GAO
01/29/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
01/28/2025
Special inspection requirement — Fenestration areas
DEZHANG FANG
01/27/2025
Filed — Alteration CO
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00991098-P1
10/09/2024
Permit issued — Solar
Q01118296-I1-SL
10/08/2024
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01118296-I1
08/27/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/27/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
08/27/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/24/2024
Permit issued — Structural
Q00991098-I1-GC-CX
05/23/2024
Permit issued — Plumbing
Q00991098-S3-PL
05/23/2024
Permit issued — Construction Fence
Q00991098-S2-FN
05/14/2024
Filed — Alteration CO
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00991098-S3
04/10/2024
Filed — Alteration CO
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00991098-S2
02/05/2024
Filed — Alteration CO
INSTALL TEMPORARY CONSTRUCTION FENCE.
Q00991098-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offAMERGY SOLAR INC10/09/2024
DOB NOWStructuralPermit IssuedLXC CONSTRUCTION INC05/24/2024
DOB NOWPlumbingSigned-offAMM GEN'L CONTRACTING INC05/23/2024
DOB NOWConstruction FenceSigned-offLXC CONSTRUCTION INC05/23/2024
1 project · most recent 01/30/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/30/2025Signed-offAMM GEN'L CONTRACTING INCGas, Storm, Water/Sanitary
2 projects · most recent 02/26/2025
General Wiring
FiledStatusContractorScope
02/26/2025CompleteKJK ELECTRIC INCGeneral Wiring
10/07/2024CompleteI.P. ELECTRIC INC—
1 project · most recent 01/30/2025
Fence
FiledStatusContractorScope
01/30/2025Permit IssuedLXC CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/27/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/27/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
04/03/2025Fenestration air leakageDEZHANG FANGenergy_progress
04/03/2025Interior lighting powerDEZHANG FANGenergy_progress
04/03/2025Fenestration areasDEZHANG FANGenergy_progress
04/03/2025Maintenance informationDEZHANG FANGenergy_progress
04/03/2025Air barrier - visual inspectionDEZHANG FANGenergy_progress
04/03/2025Insulation placement and R valuesDEZHANG FANGenergy_progress
04/03/2025Protection of exposed foundation insulationDEZHANG FANGenergy_progress
04/03/2025MeteringDEZHANG FANGenergy_progress
04/03/2025Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
04/03/2025Structural Steel - High Strength BoltingDEZHANG FANGspecial
04/03/2025Concrete - Cast-In-PlaceDEZHANG FANGspecial
04/03/2025Excavations - Sheeting, Shoring, and BracingDEZHANG FANGspecial
04/03/2025Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
04/03/2025MasonryDEZHANG FANGspecial
04/03/2025Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
04/03/2025Structural Steel - DetailsDEZHANG FANGspecial
04/03/2025Fire-Resistance Rated ConstructionDEZHANG FANGprogress
04/03/2025FinalDEZHANG FANGprogress
04/03/2025Energy Code Compliance InspectionsDEZHANG FANGprogress
04/03/2025Structural Wood FrameDEZHANG FANGprogress
04/03/2025Footing and FoundationDEZHANG FANGprogress
01/29/2025HVAC-R and service water heating equipmentYAN GAOenergy_progress
01/29/2025HVAC-R and service water heating system controlsYAN GAOenergy_progress
01/29/2025HVAC-R and service water piping design and insulationYAN GAOenergy_progress
01/29/2025Maintenance informationYAN GAOenergy_progress
Latest 25 of 58.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/22/2026Q00991098-P2Request digital key ↗
08/22/2026Q00991098-P1Request digital key ↗
08/22/2026Q00991098-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00991098-I1Open ↗
08/13/2026Q00991098-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00991098-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026Q00991098-I1Open ↗
08/29/2026Q00991098-I1Open ↗
08/29/2026Q00991098-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/22/2026Q00991098-S3Open ↗
08/22/2026Q00991098-P2Open ↗
08/22/2026Q00991098-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q00991098-I1Open ↗
08/29/2026Q00991098-P2Open ↗
08/23/2026Q00991098-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00991098-P2Open ↗
08/13/2026Q00991098-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/22/2026Q00991098-P2Open ↗
08/22/2026Q00991098-P1Open ↗
08/22/2026Q00991098-S3Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00991098-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01118296-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q00991098-I1Open ↗
08/13/2026Q00991098-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00991098-P2Open ↗
08/13/2026Q00991098-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00991098-P2Open ↗
08/13/2026Q00991098-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026Q00991098-P2Open ↗
08/22/2026Q00991098-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00991098-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00991098-I1Open ↗