← Back
One family attached or semi-detached
146-38 60 AVENUE
QUEENS · Queensboro Hill · BIN 4140549
💬 Discuss this project
1940Year Built
2Stories
A5Building Class
R4Zoning
1,737 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,376 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC205/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JZ CONSTRUCTION GROUP INCGeneral Contractor303/21/2026
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Signed Off (1)Violation (3)Inspection (1)Objection (2)
10/15/2024
Signed off — Alteration
File to address ECB violation #39108827X. Propose new railing and restore back to legal open porch condition as per plan approved plan #709 approved @ 05/1945. No change in use, egress, or occupancy.
Q01025788-I1
09/24/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/14/2024
Filed — Alteration
File to address ECB violation #39108827X. Propose new railing and restore back to legal open porch condition as per plan approved plan #709 approved @ 05/1945. No change in use, egress, or occupancy.
Q01025788-P1
05/13/2024
Permit issued — General Construction
Q01025788-I1-GC
04/12/2024
Objection resolved — Addressed
04/02/2024
Objection raised — Other
03/27/2024
Filed — Alteration
File to address ECB violation #39108827X. Propose new railing and restore back to legal open porch condition as per plan approved plan #709 approved @ 05/1945. No change in use, egress, or occupancy.
Q01025788-I1
03/07/2024
Violation issued (ECB, closed)
Construction
05/09/1999
Violation issued (ECB, closed)
Quality of Life
05/09/1999
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJZ CONSTRUCTION GROUP INC05/13/2024
BISPLISSUEDPINNACLE PLBG & HTG CORP06/24/1999
BISOTISSUEDSHINY CONST INC06/24/1999
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/24/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q01025788-P1Request digital key ↗
08/23/2026Q01025788-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q01025788-P1Open ↗
08/23/2026Q01025788-I1Open ↗