DOB09/05/2025EMERGENCY WORK: EXP4 WALL OBSVD TO BE LEANING TOWARDS ADJ PROPERTY.THE COMPROMISED WALL IS A POTENTIAL HAZARD TO PUBLIC & PROPERTY. REMEDY: FAIL2COMPLY W COMISIONER'S ORDR #090425CE30201JT REQ WRK BY 10AM,9/5, START WORK BY 9AM, 9/8. F/T PE AND CS SUPERVISION, SIGNED/SEALED DOCS BY 1PM
DOB09/05/2025UNPERMITTED PTL DEMO&ALT OF 2ST+C WOOD FRAMED BLDG.ROOFING&CHIMNEY REMOVED. EXP#4 WALL LEANING. POTENTIALLY STRUCTURALLY COMPROMISED & POTENTIAL HAZARD. REMEDY: FAILURE TO COMPLY W.COMMISSIONER'S ORDER # 082925CE30201NB MANDATED DAILY INSPCTN RPTS TIL SITE STABILIZED PROVIDE SIGNED/SEALED DAILY REPORTS
DOB09/04/2025EMERGENCY WORK: EXP#4 WALL OBSVD TO BE LEANING TOWARDS ADJ PROPERTY THE COMPROMISED WALL IS A POTENTIAL HAZARD TO PUBLIC AND PROPERTY REMEDY: RETAIN RDP,CS,& DEMO ENDORSED GC TO STAB & SECURE SITE.START WORK NO LATER THAN 10AM.SUBMIT DAILY RPRT TIL WRK IS COMPLETE
DOB08/29/2025REQUEST A ENGINEERS REPORT DUE TO EXPOSURE 4(RIGHT) BETWEEN 1ST AND 2ND FLOOR WALL LEANING AND BACK CORNER APPROX. 3 SEPARATION FROM BUILDING, AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGED CONDITIONS.
DOB08/29/2025UNPERMITTED P.DEMO AND ALT OF 2ST+C WOOD FRAMED BLDG.ROOFING CHIMNEY REMOVED,EXP4 WALL LEANING.POTENTIALLY STUCT'LY COMPROMISED POTENTIAL HAZ.RETAIN PE AND GC TO EVAL,STABILIZE BLDG,PROTECT PUBLIC SUBMIT REPORT AND SKETCHES BY 9/2/25 START BY 9/5/25
ECB06/17/2025WORK WITHOUT A PERMIT. AT TIME OF INSPECTION OBSERVED ROOF WORK BEING DONE AND MISSING ROOF ELEMENTS LEAVING ROOF EXPOSED TO ALL ELEMENTS. NO PERMITS WERE ISSUED FOR SCOPE OF WORK IN BIS OR IN DOB NOW. STOP ALL$12K due
ECB06/17/2025FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO ONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND PERMITTED WORKSITE. AT TIME OF INSPECTION OBSERVED A 2-STORY 1-FAMILY PROPERTY WITH ACTIVE ELECTRICAL PERMI$10K due
DOB06/17/2025STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED OPEN ROOF DUE TO UNPERMITTED CONSTRUCTION ACTIVITIES. PROPERTY IS NOW EXPOSED TO ALL ELEMENTS AND IS AFFECTING THE STABILITY OF PROPERTY.
ECB06/17/2025FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AN UNPERMITTED CONSTRUCTION SITE FOR ROOF WORK. OBSERVED DEBRIS HANGING AT EXPOSURE#4 OF PROPERTY AND MISSING ROOF SECTION$12K due
ECB08/29/2025FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION EXPOSURE 4(RIGHT) EXTERIOR FACADE 2ND FLOOR WALL IS LEANING, ALSO BACK CORNER BETWEEN 1ST AND 2ND FLOOR APPROX..3' OPENING SEPARATINGNothing owed — awaiting certificate of correction
ECB08/29/2025WORK WITHOUT A PERMIT. AT TIME OF INSPECTION AT INTERIOR, CELLAR, 1ST AND 2ND FLOORS FULL GUT DEMOLITION , NEW FAME WORK, SISTER JOISTS AND LOAD BEARS WALLS., OBTAIN ALL PERMITSNothing owed — awaiting certificate of correction
ECB08/29/2025WORK WITHOUT A PERMIT. AT TIME OF INSPECTION AT CELLAR,1ST AND 2ND FLOORS OBSERVED ASSOCIATED PLUMBING WORK THROUGHOUT. NO PERMIT ON FILE., OBTAIN ALL PERMITSNothing owed — awaiting certificate of correction