146 NORTH 8TH STREET
BROOKLYN · BIN 3061918
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R6BZoning
2,205 sfGross Floor Area
3Units
Rent Stabilized12 Active Violations 11 unresolved · 1 paperwork only ▸
Three families · Owner of record: 146 N 8th St · 1,667 sf lot · 1.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction22p · 1 filing · 20 docs
BulkheadUnder Construction2p · 1 filing · 20 docs
PenthouseUnder Construction16p · 1 filing · 20 docs
Floor 3Under Construction22p · 2 filings · 20 docs
Floor 2Under Construction24p · 2 filings · 20 docs
Floor 1Sidewalk shedUnder Construction28p · 4 filings · 20 docs
CellarFoundation and cellar demolition and constructionUnder Construction37p · 3 filings · 20 docs
Site & exteriorFoundation and cellar demolition and constructionUnder Construction1p · 4 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RPG Partners907/08/2026
146 N 8th St203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/08/2023$1.6M—RPG PARTNERS LLC → 146 N 8TH ST LLC$726/sf building
04/24/2018$2.2M—AJG 146 LLC → Private party$998/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Project Factory NYC1003/21/2026
SNR Expediting Design203/21/2026
NYC Building Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LT Pro ConstructionGeneral Contractor909/23/2026
LT Pro ConstructionScaffold407/08/2026
Titan Services USAScaffold210/14/2026
Deep FormationScaffold107/08/2026
Khalida ShoukatScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Just Consulting Engineering5865908/27/2026
Building Lifecycle
All (190)Filed (18)Permit Issued (15)Signed Off (1)Violation (47)Inspection (1)Objection (78)Special Inspection (30)
10/13/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01471255-I1
10/13/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01471258-I1
10/13/2026
Permit issued — Supported Scaffold
B01471255-I1-SF
10/13/2026
Permit issued — Sidewalk Shed
B01471258-I1-SH
10/01/2026
Violation issued (ECB, open)
Construction
10/01/2026
Violation issued (ECB, open)
Construction
09/28/2026
Objection resolved — Resolved
09/23/2026
Objection resolved — Addressed
09/23/2026
Objection resolved — Resolved
09/22/2026
Permit issued — General Construction
B00921750-I1-GC
09/22/2026
Objection resolved — Addressed
09/22/2026
Objection resolved — Addressed
09/21/2026
Objection resolved — Addressed
09/08/2026
Objection raised — Cost
09/08/2026
Objection raised — Admin
09/08/2026
Objection raised — Scope
09/08/2026
Objection raised — Other
09/08/2026
Objection raised — Zoning
09/08/2026
Objection raised — Other
08/27/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Filing foundation work type in conjunction with alt job# B00921750I1
B00921750-P2
08/26/2026
Special inspection requirement — Electrical motors and elevators
XIAOJUN WANG
08/26/2026
Special inspection requirement — Maintenance information
XIAOJUN WANG
08/26/2026
Special inspection requirement — Lighting controls
XIAOJUN WANG
08/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
08/26/2026
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
08/26/2026
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
08/26/2026
Special inspection requirement — Metering
XIAOJUN WANG
08/26/2026
Special inspection requirement — Interior lighting power
XIAOJUN WANG
08/26/2026
Special inspection requirement — Lighting in dwelling units
XIAOJUN WANG
08/26/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
08/26/2026
Special inspection requirement — Exterior lighting power
XIAOJUN WANG
08/26/2026
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
08/26/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
07/15/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/08/2026
Signed off — Alteration
FILE EXISTING LAYOUT. NEW PAINT, FLOORING, AND PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214885-I1
05/05/2026
Violation issued (HPD, open)
A
04/29/2026
Permit issued — Construction Fence
B00990874-I1-FN
04/29/2026
Permit issued — Foundation
B00921750-S9-FO
04/29/2026
Permit issued — Support of Excavation
B00921750-S8-SE
04/29/2026
Permit issued — General Construction
B00921750-I1-GC
11/20/2025
Violation issued (HPD, closed)
I
07/03/2025
Special inspection requirement — Final
FAZAL BANGASH
07/02/2025
Filed — Alteration
FILE EXISTING LAYOUT. NEW PAINT, FLOORING, AND PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214885-P2
07/02/2025
Special inspection requirement — Final
FAZAL BANGASH
06/13/2025
Filed — Alteration
FILE EXISTING LAYOUT. NEW PAINT, FLOORING, AND PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214885-P1
06/10/2025
Violation issued (HPD, open)
A
06/06/2025
Special inspection requirement — Final
FAZAL BANGASH
05/06/2025
Permit issued — General Construction
B01214885-I1-GC
04/28/2025
Filed — Alteration
FILE EXISTING LAYOUT. NEW PAINT, FLOORING, AND PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01214885-I1
04/15/2025
Violation issued (ECB, closed)
Construction
12/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2024
Special inspection requirement — Fenestration areas
XIAOJUN WANG
11/22/2024
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
11/22/2024
Special inspection requirement — Exterior lighting power
XIAOJUN WANG
11/22/2024
Special inspection requirement — Metering
XIAOJUN WANG
11/22/2024
Special inspection requirement — Interior lighting power
XIAOJUN WANG
11/22/2024
Special inspection requirement — Lighting controls
XIAOJUN WANG
11/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
11/22/2024
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
11/22/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOJUN WANG
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedTitan Services USA10/13/2026
DOB NOWSidewalk ShedPermit IssuedTitan Services USA10/13/2026
DOB NOWGeneral ConstructionPermit IssuedLT Pro Construction09/22/2026
DOB NOWConstruction FencePermit IssuedLT Pro Construction04/29/2026
DOB NOWFoundationPermit IssuedLT Pro Construction04/29/2026
DOB NOWSupport of ExcavationPermit IssuedLT Pro Construction04/29/2026
DOB NOWGeneral ConstructionPermit IssuedLT Pro Construction04/29/2026
DOB NOWGeneral ConstructionSigned-offLT Pro Construction05/06/2025
DOB NOWGeneral ConstructionPermit IssuedLT Pro Construction10/29/2024
DOB NOWFoundationPermit IssuedLT Pro Construction10/18/2024
DOB NOWSupport of ExcavationPermit IssuedLT Pro Construction10/18/2024
DOB NOWGeneral ConstructionPermit IssuedLT Pro Construction05/09/2024
DOB NOWSidewalk ShedPermit IssuedDeep Formation05/07/2024
DOB NOWConstruction FencePermit IssuedLT Pro Construction05/02/2024
DOB NOWSidewalk ShedPermit IssuedKhalida Shoukat08/02/2019
BISOTISSUEDShafqat A Choudhary02/07/2020
BISOTISSUEDShafqat A Choudhary11/13/2019
BISOTISSUEDAli & Son Improvement06/05/2018
1 project · most recent 08/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2026Permit IssuedLT Pro ConstructionAir Conditioning Systems
Cooling
Daikin 4MXS36NMVJU 36,000 BTU · Condensing Unit ×3
1 project · most recent 08/27/2026
Sprinkler System
FiledStatusContractorScope
08/27/2026——Sprinkler System
1 project · most recent 08/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/27/2026——Gas, Water/Sanitary
1 project · most recent 08/02/2019
FiledStatusContractorScope
08/02/2019Permit IssuedClairmont Electrical Contracting—
1 project · most recent 08/27/2026
Steel Concrete
FiledStatusContractorScope
08/27/2026Permit IssuedLT Pro ConstructionSteel, Concrete
2 projects · most recent 10/13/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
10/13/2026Permit IssuedTitan Services USASidewalk Shed
10/13/2026Permit IssuedTitan Services USAScaffold
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
08/26/2026Air barrier - visual inspectionXIAOJUN WANGenergy_progress
08/26/2026Interior lighting powerXIAOJUN WANGenergy_progress
08/26/2026Fenestration air leakageXIAOJUN WANGenergy_progress
08/26/2026Protection of exposed foundation insulationXIAOJUN WANGenergy_progress
08/26/2026Maintenance informationXIAOJUN WANGenergy_progress
08/26/2026Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
08/26/2026Insulation placement and R valuesXIAOJUN WANGenergy_progress
08/26/2026Lighting in dwelling unitsXIAOJUN WANGenergy_progress
08/26/2026MeteringXIAOJUN WANGenergy_progress
08/26/2026Fenestration areasXIAOJUN WANGenergy_progress
08/26/2026Lighting controlsXIAOJUN WANGenergy_progress
08/26/2026Electrical motors and elevatorsXIAOJUN WANGenergy_progress
08/26/2026Exterior lighting powerXIAOJUN WANGenergy_progress
07/03/2025FinalFAZAL BANGASHprogress
07/02/2025FinalFAZAL BANGASHprogress
06/06/2025FinalFAZAL BANGASHprogress
11/22/2024Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
11/22/2024Structural Stability – Alterations of existing buildingsXIAOJUN WANGspecial
11/22/2024Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
11/22/2024Energy Code Compliance InspectionsXIAOJUN WANGprogress
11/22/2024Fire-Resistance Rated ConstructionXIAOJUN WANGprogress
11/22/2024Electrical motors and elevatorsXIAOJUN WANGenergy_progress
11/22/2024Lighting in dwelling unitsXIAOJUN WANGenergy_progress
11/22/2024Fenestration areasXIAOJUN WANGenergy_progress
11/22/2024Air barrier - visual inspectionXIAOJUN WANGenergy_progress
Latest 25 of 83.
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch15
10/20/2026B01471258-I1Request digital key ↗
10/20/2026B01471255-I1Request digital key ↗
09/01/2026B00489446-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00203935-I1Request digital key ↗
09/02/2026B00337318-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
05/14/2024322008126Open ↗
05/08/2024321922498Open ↗
11/12/2019322008126Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION3
11/14/2019321666693Open ↗
06/28/2019321666693Open ↗
06/06/2018321666693Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
10/05/2026B00921750-P2Open ↗
08/23/2026B00921750-I1Open ↗
08/13/2026B00921750-P1Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/08/2019321922498Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/08/2019321922498Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
10/05/2026B00921750-P2Open ↗
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature18
10/20/2026B01471258-I1Open ↗
10/20/2026B01471255-I1Open ↗
10/05/2026B00921750-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
10/05/2026B00921750-P2Open ↗
08/27/2026B01214885-P1Open ↗
08/27/2026B01214885-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/22/2026B00921750-I1Open ↗
08/22/2026B00921750-Z3Open ↗
08/22/2026B00921750-Z1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/12/2019322008126Open ↗
05/22/2019321922498Open ↗
05/22/2019321922498Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/12/2019322008126Open ↗
05/29/2018321666693Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/12/2019322008126Open ↗
05/29/2018321666693Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/13/2019321922498Open ↗
02/05/2019321922498Open ↗
05/29/2018321666693Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
10/05/2026B00921750-P2Open ↗
08/23/2026B00921750-I1Open ↗
08/13/2026B00921750-P1Open ↗
▸Safety & Tenant Protection30
▸DOB NOWHPD-1: Anti-Harassment Area Checklist13
10/05/2026B00921750-P2Open ↗
08/23/2026B00921750-I1Open ↗
08/21/2026B01214885-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWCertificate of No Harassment7
10/05/2026B00921750-P2Open ↗
08/23/2026B00921750-I1Open ↗
08/23/2026B00921750-S7Open ↗
Showing 3 of 7 on file for this type
▸BISANTI-HARASSMENT CHECKLIST2
02/05/2019321922498Open ↗
05/29/2018321666693Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00203935-I1Open ↗
08/13/2026B00337318-I1Open ↗
▸DOB NOWStreet Tree Checklist2
10/05/2026B00921750-Z5Open ↗
10/05/2026B00921750-P2Open ↗
▸BISSTREET TREE CHECKLIST1
02/05/2019321922498Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00921750-I1Open ↗
▸DOB NOWBPP: Street Trees Site Plan A451
10/05/2026B00921750-Z5Open ↗
▸DOB NOWStreet Trees: Receipt Of Street Trees Site Plan P241
10/05/2026B00921750-Z5Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
10/05/2026B00921750-P2Open ↗
09/01/2026B00489446-I1Open ↗
08/23/2026B00921750-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/05/2019321922498Open ↗
05/29/2018321666693Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/05/2019321922498Open ↗
05/29/2018321666693Open ↗
▸Inspections & Test Reports1
▸BISSOIL REPORT1
05/22/2019321922498Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSUPERSEDING LETTER2
11/14/2019321666693Open ↗
06/28/2019321666693Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/05/2019321922498Open ↗
▸BISACPE Objection Review Request1
05/29/2018321666693Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/12/2019322008126Open ↗
02/05/2019321922498Open ↗
05/29/2018321666693Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
11/12/2019322008126Open ↗
07/01/2019321922498Open ↗
02/05/2019321922498Open ↗
Showing 3 of 4 on file for this type
▸Other Documents14
▸DOB NOWSite Survey: Initial4
10/05/2026B00921750-Z5Open ↗
10/05/2026B00921750-P2Open ↗
08/23/2026B00921750-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
10/05/2026B00921750-P2Open ↗
08/23/2026B00921750-I1Open ↗
08/13/2026B00921750-P1Open ↗
▸DOB NOWProperty Ownership Certification3
10/05/2026B00921750-P2Open ↗
08/23/2026B00921750-I1Open ↗
08/13/2026B00921750-P1Open ↗
▸BISPLOT DIAGRAM1
02/05/2019321922498Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00921750-S8Open ↗
▸DOB NOWWaiver Document1
10/05/2026B00921750-P2Open ↗
▸DOB NOWExisting Sidewalk Photographs1
10/05/2026B00921750-Z5Open ↗