← Back
Elevator apt, fireproof without stores
Victory One
1460 5 AVENUE · BIN 1053192
💬 Discuss this project
1998Year Built
8Stories
D3Building Class
R7-2Zoning
79,352 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized42 Open Violations 41 unresolved · 1 paperwork only ▸FISP: UNSAFE
Elevator apt, fireproof without stores · Owner of record: VICTORY ONE HOUSING DEVELOPMENT FUND COR PORATION · 20,184 sf lot · 3.93 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction26p · 2 filings · 20 docs
Floor 8Under Construction31p · 1 filing · 20 docs
Floor 7Under Construction31p · 1 filing · 20 docs
Floor 6Under Construction31p · 1 filing · 20 docs
Floor 5Under Construction31p · 1 filing · 20 docs
Floor 4Under Construction31p · 1 filing · 20 docs
Floor 3Under Construction31p · 1 filing · 20 docs
Floor 2Under Construction31p · 1 filing · 20 docs
Floor 1Under Construction32p · 1 filing · 20 docs
CellarUnder Construction35p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FALCON GROUP2509/13/2026
ROCK GROUP NY CORP703/22/2026
VICTORY ONE HOUSING DEVELOPMENT FUND COR PORATION1103/22/2026
VICTORY ONE HOUSING103/22/2026
B H B CONSTRUCTION303/21/2026
PRESTIGE MANAGEMENT1203/21/2026
HCCI103/21/2026
256 WEST 153RD STREET603/21/2026
VICTORY ONE HDFC503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION205/05/2026
DAMORE STUDIO211/26/2025
INGLESE ARCHITECTURE AND ENGINEERIN208/13/2025
GACE DPC108/13/2025
ASIF JAMIL, RA102/12/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING1003/21/2026
RIGGING CONSULTANTS203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor603/21/2026
D.P. GROUP GENERAL CONTRAGeneral Contractor304/09/2026
DYNAMIC AIR CONDITIONINGGeneral Contractor104/09/2026
MC SUPERSTRUCTURE INCGeneral Contractor104/09/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN INTEGRATIONS LLC7993103/20/2026
AMERICAN CONSTRUCTION TES9731511/26/2025
PCS ENGINEERING3745102/21/2025
Building Lifecycle
All (117)Filed (10)Permit Issued (10)Facade (FISP) (12)Violation (60)Objection (4)Special Inspection (21)
09/07/2026
Violation issued (HPD, open)
C
07/01/2026
Violation issued (HPD, open)
B
07/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
B
05/05/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01346953-P1
04/03/2026
Violation issued (HPD, closed)
C
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, closed)
A
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
04/03/2026
Violation issued (HPD, open)
B
04/02/2026
Permit issued — Structural
M01224437-S1-ST
03/30/2026
Permit issued — General Construction
M01224437-I1-GC
03/30/2026
Cycle 10 facade report submitted
03/30/2026
Cycle 10 facade report signed — UNSAFE
03/24/2026
Permit issued — Suspended Scaffold
M01344265-I1-SC
03/20/2026
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M01344265-I1
03/20/2026
Cycle 10 facade inspection completed
03/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
03/20/2026
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
03/20/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
02/04/2026
Permit issued — Mechanical Systems
M01224437-S3-MS
01/26/2026
Permit issued — Sidewalk Shed
M01346953-I1-SH
01/23/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01346953-I1
01/22/2026
Permit issued — Plumbing
M01224437-S2-PL
01/15/2026
Permit issued — General Construction
M01224437-I1-GC
01/15/2026
Violation issued (HPD, open)
C
12/18/2025
Violation issued (HPD, closed)
C
11/26/2025
Filed — Alteration
UPGRADE OF EXISTING VENTILATION AND COMMON AREA COOLING SYSTEMS. NO CHANGE TO EXISTING USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION.
M01224437-S4
11/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDWIN HOPKINS
11/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
EDWIN HOPKINS
10/10/2025
Violation issued (HPD, closed)
C
10/10/2025
Violation issued (HPD, closed)
B
10/10/2025
Violation issued (HPD, closed)
B
10/10/2025
Violation issued (HPD, closed)
B
10/10/2025
Violation issued (HPD, open)
C
10/08/2025
Violation issued (HPD, closed)
A
10/08/2025
Violation issued (HPD, open)
B
10/02/2025
Violation issued (HPD, closed)
B
10/02/2025
Violation issued (HPD, closed)
A
10/02/2025
Violation issued (HPD, open)
B
10/02/2025
Violation issued (HPD, open)
C
10/02/2025
Violation issued (HPD, closed)
B
10/02/2025
Violation issued (HPD, closed)
B
10/02/2025
Violation issued (HPD, closed)
B
09/04/2025
Special inspection requirement — Final
EDWIN HOPKINS
09/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
09/03/2025
Objection resolved — Addressed
08/27/2025
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, closed)
A
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
B
08/27/2025
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, closed)
C
08/27/2025
Violation issued (HPD, open)
B
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedD.P. GROUP GENERAL CONTRA04/02/2026
DOB NOWGeneral ConstructionPermit IssuedD.P. GROUP GENERAL CONTRA03/30/2026
DOB NOWSuspended ScaffoldPermit IssuedKLG CONTRACTING INC03/24/2026
DOB NOWMechanical SystemsPermit IssuedA&R HOME IMPROV & CONSTR02/04/2026
DOB NOWSidewalk ShedPermit IssuedMC SUPERSTRUCTURE INC01/26/2026
DOB NOWPlumbingPermit IssuedHYDROKINETIC PLBG & HTG I01/22/2026
DOB NOWGeneral ConstructionPermit IssuedD.P. GROUP GENERAL CONTRA01/15/2026
DOB NOWSuspended ScaffoldPermit IssuedCOLGATE RESTORATION CORP02/27/2025
DOB NOWConstruction FencePermit IssuedROCK GROUP NY CORP10/10/2019
DOB NOWConstruction FencePermit IssuedROCK GROUP NY CORP02/12/2019
BISEQISSUEDEMPIRE NY INSTALLATIONS INC03/11/2020
BISOTISSUEDMILLENIUM RESTORATION CORP06/12/2019
BISOTISSUEDFIFTH AVENUE BUILDERS LLC02/04/2019
BISOTISSUEDFIFTH AVENUE BUILDERS LLC02/04/2019
BISOTISSUEDFIFTH AVENUE BUILDERS LLC02/04/2019
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM01/29/2019
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM01/12/2018
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM01/11/2017
BISEQISSUEDB H & B CONSTRUCTION INC03/07/2013
BISPLISSUEDWASOFF PLBG & UTILITY CO02/21/2013
BISBLISSUEDWASOFF PLBG & UTILITY CO02/21/2013
BISEQISSUEDROCK SCAFFOLDING CORP02/19/2013
BISEQISSUEDTALICO CONSTRUCTION CORP01/29/2010
BISOTISSUEDFUTURA BUILDERS GROUP INC.07/06/2007
BISSDISSUEDADIRONDACK MECHANICAL CONTRACTOR03/24/1999
BISSPISSUEDADIRONDACK MECHANICAL CONTRACTOR03/24/1999
BISPLISSUEDADIRONDACK MECHANIAL CONTRACTORS12/14/1998
BIS—ISSUEDR & J BRICK MASONRY INC.06/18/1998
BISEQISSUEDR AND J BRICK MASONRY05/27/1998
BISPLISSUEDFRF PLG HTG11/26/1997
BISEQISSUEDBLAKEL CONSTRUCTION CO.09/29/1997
BISEQISSUEDBLAKEL CONSTRUCTION CO.09/29/1997
BIS—ISSUEDBLAKEL CONSTRUCTION CO.09/29/1997
BIS—ISSUEDGATEWAY DEMO.CORP.06/09/1993
BISEQISSUEDGATEWAY DEMO.CORP.06/09/1993
BISEQISSUEDGATEWAY DEMO CORP06/09/1993
BIS—ISSUEDGATEWAY DEMO CORP06/09/1993
BIS—ISSUEDDJR WRECKING CORP09/19/1991
BISEQISSUEDDJR WRECKING CORP09/19/1991
BISEQISSUEDDJR WRECKING CORP09/19/1991
1 project · most recent 11/26/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025Permit IssuedD.P. GROUP GENERAL CONTRAHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Carrier 38AXQN08A0A5-0A0A0 90,000 BTU · Split System ×2
37MBRAQ36AA3 36,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck G-100-VG 1,500 CFM · Exhaust Fan ×6
G-095-VG 400 CFM · Exhaust Fan ×4
G-120-VG 1,600 CFM · Exhaust Fan ×3
G-140-VG 1,720 CFM · Exhaust Fan ×1
RVE-40-41D 3,650 CFM · Doas ×1
1 project · most recent 11/26/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/26/2025Permit IssuedHYDROKINETIC PLBG & HTG IGas, Storm, Water/Sanitary
3 projects · most recent 04/22/2026
General Wiring
FiledStatusContractorScope
04/22/2026Permit IssuedTEMPEST ELEC'L CONTRG, INGeneral Wiring
01/28/2026Permit IssuedNASH ELECTRIC SERVICES IN—
03/01/2019CompleteSOLAR ELEC. SYSTEMS, INC.—
1 project · most recent 11/26/2025
Steel Masonry
FiledStatusContractorScope
11/26/2025Permit IssuedD.P. GROUP GENERAL CONTRASteel, Masonry
2 projects · most recent 05/05/2026
Sidewalk Shed Fence
FiledStatusContractorScope
05/05/2026Permit IssuedMC SUPERSTRUCTURE INCSidewalk Shed
02/12/2019Permit IssuedROCK GROUP NY CORPFence
2 projects · most recent 03/20/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/20/2026Permit IssuedKLG CONTRACTING INCSuspended Scaffold (SC)
02/21/2025Permit IssuedCOLGATE RESTORATION CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
03/20/2026Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
03/20/2026Post-installed AnchorsDANNY TRUJILLOspecial
03/20/2026Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
11/14/2025Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
11/14/2025Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
09/04/2025FinalEDWIN HOPKINSprogress
09/04/2025Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
07/02/2025Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
05/28/2025Maintenance informationEDWIN HOPKINSenergy_progress
05/28/2025Lighting in dwelling unitsEDWIN HOPKINSenergy_progress
05/14/2025MasonryEDWIN HOPKINSspecial
05/14/2025Structural Stability – Alterations of existing buildingsEDWIN HOPKINSspecial
05/14/2025Structural Steel - DetailsEDWIN HOPKINSspecial
05/14/2025Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
05/14/2025Structural Steel - WeldingEDWIN HOPKINSspecial
05/14/2025FinalEDWIN HOPKINSprogress
05/12/2025Fire-Resistant Penetrations and JointsEDWIN HOPKINSspecial
05/12/2025FinalEDWIN HOPKINSprogress
05/12/2025Energy Code Compliance InspectionsEDWIN HOPKINSprogress
05/12/2025Tenant Protection Plan ComplianceEDWIN HOPKINSspecial
05/12/2025Fire-Resistance Rated ConstructionEDWIN HOPKINSprogress
▾Documents — 193 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/06/2026M01344265-I1Request digital key ↗
08/22/2026M01224437-S3Request digital key ↗
08/22/2026M01224437-S4Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00128750-I1Request digital key ↗
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION16
03/13/2020140593445Open ↗
12/11/2019123253692Open ↗
12/11/2019123253692Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
06/11/2019123688474Open ↗
06/11/2019123688474Open ↗
06/03/2019123688474Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications51
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
03/02/2020123688474Open ↗
03/02/2020123688474Open ↗
02/20/2020123688474Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026M01224437-S4Open ↗
08/22/2026M01224437-S3Open ↗
08/22/2026M01224437-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M01344265-I1Open ↗
09/01/2026M01344265-I1Open ↗
09/01/2026M01344265-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M01224437-S4Open ↗
08/25/2026M01224437-S1Open ↗
08/22/2026M01224437-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/03/2019123688474Open ↗
02/19/2013121532350Open ↗
01/28/2010120254660Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/03/2019123688474Open ↗
01/10/2017140593445Open ↗
02/21/2013140057088Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/10/2017140593445Open ↗
02/21/2013140057088Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/19/2013121532350Open ↗
01/28/2010120254660Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/10/2017140593445Open ↗
02/21/2013140057088Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING3
04/08/2013140057088Open ↗
04/03/2013140057088Open ↗
02/21/2013140057088Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
07/18/2013140057088Open ↗
06/27/2013140057088Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
04/08/2013140057088Open ↗
02/21/2013140057088Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
06/11/2019123688474Open ↗
06/11/2019123688474Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026M01224437-S3Open ↗
08/22/2026M01224437-S2Open ↗
08/22/2026M01224437-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/03/2019123688474Open ↗
02/21/2013140057088Open ↗
10/24/2012121412042Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
11/23/2009120208051Open ↗
11/23/2009120208051Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/28/2010120254660Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
10/24/2012121412042Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
03/02/2020123688474Open ↗
03/02/2020123688474Open ↗
02/20/2020123688474Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
03/04/2020123688474Open ↗
03/02/2020123688474Open ↗
08/13/2013140057088Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/21/2013140057088Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/21/2013140057088Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/19/2013121412042Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
01/10/2017140593445Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY5
04/30/2021140593445Open ↗
07/13/2020123253692Open ↗
07/13/2020123253692Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
07/16/2020123253692Open ↗
07/16/2020123253692Open ↗
02/01/2019123253692Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
02/01/2019123253692Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
04/30/2021140593445Open ↗
07/16/2020123253692Open ↗
07/13/2020123253692Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
02/19/2013121532350Open ↗
10/24/2012121412042Open ↗
01/28/2010120254660Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
01/31/2019140593445Open ↗
01/31/2019140593445Open ↗
01/17/2018140593445Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
03/13/2020140593445Open ↗
03/13/2020140593445Open ↗
▸BISSUPERSEDING LETTER1
03/13/2020140593445Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
03/02/2020123688474Open ↗
02/20/2020123688474Open ↗
06/03/2019123688474Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/13/2020123253692Open ↗
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET8
06/03/2019123688474Open ↗
01/09/2019123253692Open ↗
01/09/2019123253692Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION4
01/13/2020123253692Open ↗
06/11/2019123688474Open ↗
06/11/2019123688474Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
03/02/2020123688474Open ↗
02/20/2020123688474Open ↗
06/11/2019123688474Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
01/10/2017140593445Open ↗
02/21/2013140057088Open ↗
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
03/13/2020140593445Open ↗
03/13/2020140593445Open ↗
03/13/2020140593445Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01344265-I1Open ↗
08/13/2026M01178970-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01344265-I1Open ↗
08/13/2026M01178970-I1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
01/10/2017140593445Open ↗