Highbridge Rising
1465 NELSON AVENUE · BIN 2008749
💬 Discuss this project
1927Year Built
5Stories
C1Building Class
R7-1Zoning
37,570 sfGross Floor Area
35Units
LL97 CoveredRent Stabilized28 Open Violations 26 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · 9,561 sf lot · 3.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction91p · 2 filings · 20 docs
Floor 5Under Construction71p · 2 filings · 20 docs
Floor 4Under Construction71p · 2 filings · 20 docs
Floor 3Under Construction71p · 2 filings · 20 docs
Floor 2Under Construction71p · 2 filings · 20 docs
Floor 1Under Construction77p · 2 filings · 20 docs
Cellar1p · 1 filing · 3 docs
Sub-BasementUnder Construction71p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGHBRIDGE COMMUNITY DEV. CORP4309/13/2026
VOO DOO CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL A. CASTRUCCI, ARCHITECT304/21/2026
GACE DPC412/18/2025
FLORINELA MURESAN912/17/2025
JOEL PHAGOO P.E. PLLC107/23/2025
ALTAGRACIA ESTHER MARTINEZ, R.A.206/07/2022
LUKE LICALZI, P.E., P.C.101/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON LIBASCI RA203/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
WILLIAM VITACCO ASSOCIATES1403/21/2026
A1 EXPEDITING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOTIAS CONSTRUCTION INCGeneral Contractor404/09/2026
AKM CONSTRUCTION NY CORPGeneral Contractor309/07/2026
J-J PLUMBING CORPPlumbing307/08/2026
1937 CONTRACTING CO. INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONCRETE SOLUTIONS LAB CO53441504/21/2026
GEORGE J. XERAKIAS, PE1658106/07/2022
MWB ENGINEERING7942112/27/2021
Building Lifecycle
All (130)Filed (20)Permit Issued (12)Signed Off (1)Violation (60)Inspection (5)Objection (2)Special Inspection (30)
08/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/23/2026
Permit issued — Sidewalk Shed
X01254264-I1-SH
05/21/2026
Permit issued — Boiler Equipment
X01207900-S6-BE
05/19/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/17/2026
Violation issued (HPD, closed)
B
05/17/2026
Violation issued (HPD, closed)
C
05/17/2026
Violation issued (HPD, closed)
A
05/17/2026
Violation issued (HPD, open)
A
05/17/2026
Violation issued (HPD, closed)
B
05/08/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/23/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
04/23/2026
Special inspection requirement — Interior lighting power
MINA HANNA
04/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
04/23/2026
Special inspection requirement — Final
MINA HANNA
04/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
04/23/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
04/23/2026
Special inspection requirement — Fenestration areas
MINA HANNA
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
04/23/2026
Special inspection requirement — Lighting controls
MINA HANNA
04/23/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
04/23/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
04/21/2026
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P9
04/20/2026
Special inspection requirement — Interior lighting power
04/20/2026
Special inspection requirement — Exterior lighting power
04/20/2026
Special inspection requirement — Lighting in dwelling units
04/20/2026
Special inspection requirement — Lighting controls
04/08/2026
Permit issued — Sidewalk Shed
X01254264-I1-SH
03/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/19/2026
Permit issued — Plumbing
X01207900-S2-PL
12/29/2025
Special inspection requirement — Fenestration air leakage
MINA HANNA
12/29/2025
Special inspection requirement — Final
MINA HANNA
12/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
12/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
12/29/2025
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
12/29/2025
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
12/29/2025
Special inspection requirement — Fenestration areas
MINA HANNA
12/24/2025
Permit issued — Boiler Equipment
X01207900-S4-BE
12/23/2025
Permit issued — General Construction
X01207900-I1-GC
12/23/2025
Permit issued — Mechanical Systems
X01207900-S3-MS
12/23/2025
Permit issued — General Construction
X01207900-S5-GC
12/23/2025
Permit issued — Structural
X01207900-S1-ST
12/19/2025
Special inspection requirement — Final
MINA HANNA
12/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
12/19/2025
Special inspection requirement — Final
MINA HANNA
12/19/2025
Special inspection requirement — Masonry
MINA HANNA
12/18/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P7
12/18/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P3
12/17/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P8
12/17/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P6
12/17/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P4
12/17/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P5
12/16/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-P2
09/19/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-S6
09/18/2025
Filed — Alteration
Repair of existing fire escape at the exterior, such as selective replacement of fire escape components or their connections
X01207900-S4
08/07/2025
Violation issued (HPD, closed)
A
07/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP07/23/2026
DOB NOWBoiler EquipmentPermit IssuedJ-J PLUMBING CORP05/21/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY04/08/2026
DOB NOWPlumbingPermit IssuedJ-J PLUMBING CORP02/19/2026
DOB NOWBoiler EquipmentPermit IssuedJ-J PLUMBING CORP12/24/2025
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC12/23/2025
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC12/23/2025
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC12/23/2025
DOB NOWStructuralPermit IssuedNOTIAS CONSTRUCTION INC12/23/2025
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY07/23/2025
DOB NOWSupported ScaffoldPermit Issued1937 CONTRACTING CO. INC06/27/2022
DOB NOWSidewalk ShedSigned-off1937 CONTRACTING CO. INC06/09/2022
2 projects · most recent 04/21/2026
Air Conditioning Systems Heating Systems Ventilation Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
04/21/2026Permit IssuedNOTIAS CONSTRUCTION INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana PBE123G35CC 11,800 BTU · Ptac ×2
Heating
Ventilation
12/27/2021——Air Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-4C36NA2-U1 35,400 BTU · Condensing Unit ×2
MXZ-2C20NAHZ2-U1 18,000 BTU · Condensing Unit ×1
MXZ-8C48NA2 48,000 BTU · Condensing Unit ×1
Heating
Mitsubishi Electric MXZ-4C36NA2-U1 36,000 BTU · Heat Pump Outdoor ×2
MXZ-2C20NAHZ2-U1 22,000 BTU · Heat Pump Outdoor ×1
MXZ-8C48NA2 54,000 BTU · Heat Pump Outdoor ×1
Ventilation
Renewaire EV-300 300 CFM · Erv ×1
1 project · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026——10 heads
1 project · most recent 04/21/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
04/21/2026Permit IssuedJ-J PLUMBING CORPGas, Plumbing-Sprinkler, Storm, Water/Sanitary
4 projects · most recent 05/29/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/29/2026Permit IssuedG. POULAKIS ELEC'L CONTR'Boiler Controls
05/12/2026Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
03/04/2026CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
07/11/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
2 projects · most recent 04/21/2026
Steel
FiledStatusContractorScope
04/21/2026Permit IssuedJ-J PLUMBING CORPSteel
01/24/2022——1 scope_items
2 projects · most recent 07/23/2025
Sidewalk Shed Scaffold
FiledStatusContractorScope
07/23/2025Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
06/07/2022Permit Issued1937 CONTRACTING CO. INCScaffold
1 project · most recent 04/21/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/21/2026Permit IssuedJ-J PLUMBING CORPTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/19/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/08/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
04/23/2026Lighting controlsMINA HANNAenergy_progress
04/23/2026Fenestration areasMINA HANNAenergy_progress
04/23/2026Exterior lighting powerMINA HANNAenergy_progress
04/23/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/23/2026Tenant Protection Plan ComplianceMINA HANNAspecial
04/23/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
04/23/2026Energy Code Compliance InspectionsMINA HANNAprogress
04/23/2026FinalMINA HANNAprogress
04/23/2026Fenestration air leakageMINA HANNAenergy_progress
04/23/2026Air barrier - visual inspectionMINA HANNAenergy_progress
04/23/2026Lighting in dwelling unitsMINA HANNAenergy_progress
04/23/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
04/23/2026Interior lighting powerMINA HANNAenergy_progress
04/20/2026Exterior lighting power—energy_progress
04/20/2026Lighting controls—energy_progress
04/20/2026Lighting in dwelling units—energy_progress
04/20/2026Interior lighting power—energy_progress
03/25/2026Tenant Protection Plan Compliance—special
12/29/2025Air barrier - visual inspectionMINA HANNAenergy_progress
12/29/2025Fenestration air leakageMINA HANNAenergy_progress
12/29/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/29/2025Fenestration areasMINA HANNAenergy_progress
12/29/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/29/2025FinalMINA HANNAprogress
12/29/2025Energy Code Compliance InspectionsMINA HANNAprogress
Latest 25 of 103.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/24/2026X00576063-I1Request digital key ↗
08/24/2026X00749721-I1Request digital key ↗
08/24/2026X00749793-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature21
09/23/2026X01207900-S4Open ↗
09/23/2026X01207900-S3Open ↗
09/23/2026X01207900-S3Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/24/2026X00576063-I1Open ↗
08/24/2026X00500787-I1Open ↗
08/24/2026X00749721-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026X01207900-S4Open ↗
09/23/2026X01207900-S4Open ↗
09/23/2026X01207900-S3Open ↗
Showing 3 of 18 on file for this type
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/24/2026X00576063-I1Open ↗
08/17/2026X01207900-S1Open ↗
08/17/2026X01207900-I1Open ↗
Showing 3 of 17 on file for this type
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter16
08/13/2026X01207900-P6Open ↗
08/13/2026X01207900-S6Open ↗
08/13/2026X01207900-S5Open ↗
Showing 3 of 16 on file for this type
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X01207900-P2Open ↗
08/13/2026X01207900-I1Open ↗
08/13/2026X01207900-P9Open ↗
▸DOB NOWDHCR Document1
08/13/2026X00500787-I1Open ↗