Two family converted from one family
147-03 130 AVENUE
QUEENS · BIN 4262803
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3AZoning
2,240 sfGross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.56 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2025$1.2M—DHANRAJ GENERAL CONSTRUCTION LLC → Private party$531/sf building
03/14/2024$590K—Private party → DHANRAJ GENERAL CONSTRUCTION LLC$263/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR102/11/2025
TABRIZ DESIGN GROUP409/05/2024
TABRIZ GROUP ENTERPRISES208/08/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor403/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281102/11/2025
TABRIZ GROUP ENTERPRISES3275509/05/2024
TRIANGLE INSPECTION & TES7495105/21/2024
Building Lifecycle
All (52)Filed (7)Permit Issued (4)Signed Off (3)Inspection (8)Special Inspection (30)
09/18/2025
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 14 modules, 5.74 KW
Q01179281-I1
02/12/2025
Permit issued — Solar
Q01179281-I1-SL
02/11/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 14 modules, 5.74 KW
Q01179281-I1
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
02/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
02/11/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
02/11/2025
Special inspection requirement — Final
Mina Makar
10/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/26/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION TYPE 1 FOR INSTALLATION OF NEW SANITARY AND GAS FIXTURES WITH ASSOCIATED PIPING, VENTS, AND VALVES.
Q01027342-I1
09/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
09/06/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
09/06/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
09/05/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION TYPE 1 FOR INSTALLATION OF NEW SANITARY AND GAS FIXTURES WITH ASSOCIATED PIPING, VENTS, AND VALVES.
Q01027342-P2
09/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
09/04/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
09/04/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
08/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/08/2024
Filed — Alteration CO
TO SUPERSEDE EXISTING APPLICATION # 402099769 - (TO ERECT TWO STORY REAR EXTENSION INCLUDING PLUMBING AND CONVERT TO A TWO FAMILY DWELLING); PARTIAL DEMOLITION TO REAR TWO STORY EXTENSION ERECTED UNDER APP#402099769; INTERIOR AND EXTERIOR MODIFICATION.
Q01022953-P1
08/06/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION TYPE 1 FOR INSTALLATION OF NEW SANITARY AND GAS FIXTURES WITH ASSOCIATED PIPING, VENTS, AND VALVES.
Q01027342-P1
08/06/2024
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/06/2024
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Final
HARI SONI
08/06/2024
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Footing and Foundation
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
08/06/2024
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
08/05/2024
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE TO SECURE CONSTRUCTION SITE.
Q01036733-I1
06/03/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/03/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/03/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/24/2024
Permit issued — Plumbing
Q01027342-I1-PL
05/21/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALTERATION TYPE 1 FOR INSTALLATION OF NEW SANITARY AND GAS FIXTURES WITH ASSOCIATED PIPING, VENTS, AND VALVES.
Q01027342-I1
05/02/2024
Permit issued — General Construction
Q01022953-I1-GC-CX
04/29/2024
Permit issued — Construction Fence
Q01036733-I1-FN
04/25/2024
Filed — Alteration
TEMPORARY CONSTRUCTION FENCE TO SECURE CONSTRUCTION SITE.
Q01036733-I1
03/29/2024
Filed — Alteration CO
TO SUPERSEDE EXISTING APPLICATION # 402099769 - (TO ERECT TWO STORY REAR EXTENSION INCLUDING PLUMBING AND CONVERT TO A TWO FAMILY DWELLING); PARTIAL DEMOLITION TO REAR TWO STORY EXTENSION ERECTED UNDER APP#402099769; INTERIOR AND EXTERIOR MODIFICATION.
Q01022953-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR02/12/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR05/24/2024
DOB NOWGeneral ConstructionPermit IssuedKAIETEUR CONSTRUCTION INC05/02/2024
DOB NOWConstruction FenceSigned-offKAIETEUR CONSTRUCTION INC04/29/2024
BIS—ISSUED147TH STREET HOMES, INC.09/14/2005
BISPLISSUED24 SEVEN PLUMBING INC08/05/2005
BIS—ISSUED147TH STREET HOMES, INC.06/29/2005
2 projects · most recent 02/11/2025
General Wiring
FiledStatusContractorScope
02/11/2025CompleteISLAND ELECTRIC CORP—
05/29/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 08/08/2024
FiledStatusContractorScope
08/08/2024Permit IssuedKAIETEUR CONSTRUCTION INC1 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/03/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
02/11/2025Energy Code Compliance InspectionsMina Makarprogress
02/11/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
02/11/2025Fire-Resistant Penetrations and JointsMina Makarspecial
02/11/2025Air barrier - visual inspectionMina Makarenergy_progress
02/11/2025FinalMina Makarprogress
09/06/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
09/06/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
09/06/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
09/04/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
09/04/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
09/04/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
08/06/2024Permanent certificateBAKHTIAR SHAMLOOenergy_progress
08/06/2024MeteringBAKHTIAR SHAMLOOenergy_progress
08/06/2024Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
08/06/2024Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
08/06/2024Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
08/06/2024Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/06/2024MasonryBAKHTIAR SHAMLOOspecial
08/06/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/06/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/06/2024Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
08/06/2024FinalHARI SONIprogress
08/06/2024Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
08/06/2024Footing and FoundationBAKHTIAR SHAMLOOprogress
08/06/2024Fenestration areasBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 32.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026Q01036733-I1Request digital key ↗
08/21/2026Q01027342-I1Request digital key ↗
08/21/2026Q01027342-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
04/18/2025402099769Open ↗
11/06/2024402099769Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01022953-P1Open ↗
08/13/2026Q01022953-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01022953-I1Open ↗
08/13/2026Q01022953-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01022953-I1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026Q01036733-I1Open ↗
08/21/2026Q01027342-I1Open ↗
08/21/2026Q01027342-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026Q01022953-P1Open ↗
09/23/2026Q01022953-P1Open ↗
08/24/2026Q01027342-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026Q01022953-P1Open ↗
09/23/2026Q01022953-P1Open ↗
08/28/2026Q01022953-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01022953-P1Open ↗
08/13/2026Q01022953-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01027342-P2Open ↗
08/21/2026Q01027342-I1Open ↗
08/21/2026Q01027342-P1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q01022953-I1Open ↗
08/13/2026Q01022953-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01022953-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01179281-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/13/2026Q01022953-P1Open ↗
08/13/2026Q01022953-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01022953-I1Open ↗
08/13/2026Q01022953-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01022953-I1Open ↗
08/13/2026Q01022953-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026Q01022953-I1Open ↗
08/13/2026Q01022953-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/24/2024402099769Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01022953-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01022953-I1Open ↗