← Back
BuildNYC
Two family brick
147-03 JEWEL AVENUE
QUEENS · BIN 4143886
💬 Discuss this project
1945Year Built
1.67Stories
B1Building Class
R4AZoning
3,393 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family brick · 3,800 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic4p · 1 filing · 20 docs
Floor 26p · 2 filings · 20 docs
Floor 15p · 2 filings · 20 docs
Cellar8p · 2 filings · 20 docs
Site & exteriorTemporary construction fence installation6p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/01/2021$1000K—Private party → Private party$295/sf building
06/21/2018$980K—Private party → Private party$289/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tabriz Group Enterprises208/15/2023
Tabriz Design Group302/01/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amar ConstructionGeneral Contractor403/21/2026
Amar ConstructionScaffold207/08/2026
Plumbing-It MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tabriz Group Enterprises3275408/15/2023
Triangle Inspection & Tes7495202/01/2023
Building Lifecycle
11/27/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT APP # Q00651914. INSTALLATION OF GAS FIXTURES WITH PIPING, AND SANITARY FIXTURES WITH WASTE AND WATER PIPING
Q00696778-I1
10/02/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTTION WITH ALT 1 APP # Q00651914
Q00663887-I1
09/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2023
Objection resolved — Addressed
08/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR Plumbing and Heating11/18/2022
DOB NOWEarth WorkPermit IssuedAmar Construction06/22/2022
DOB NOWConstruction FenceSigned-offAmar Construction06/22/2022
DOB NOWFoundationPermit IssuedAmar Construction05/31/2022
DOB NOWConstruction FenceSigned-offAmar Construction04/14/2022
2 projects · most recent 12/05/2023
General Wiring
FiledStatusContractorScope
12/05/2023CompleteSNB Electrical ContngGeneral Wiring
01/21/2022CompleteAll Ways Electric Corp.w—
1 project · most recent 08/15/2023
FiledStatusContractorScope
08/15/2023Permit IssuedAmar Construction—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
08/29/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
08/29/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
08/29/2023Excavations - Sheeting, Shoring, and BracingBAKHTIAR SHAMLOOspecial
08/29/2023MasonryBAKHTIAR SHAMLOOspecial
08/29/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
08/29/2023Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
08/29/2023FinalHARI SONIprogress
08/29/2023Footing and FoundationBAKHTIAR SHAMLOOprogress
08/29/2023Maintenance informationBAKHTIAR SHAMLOOenergy_progress
08/29/2023HVAC-R and service water piping design and insulationBAKHTIAR SHAMLOOenergy_progress
08/29/2023Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
08/29/2023Permanent certificateBAKHTIAR SHAMLOOenergy_progress
08/29/2023Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
08/29/2023Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
08/29/2023HVAC-R and service water heating equipmentBAKHTIAR SHAMLOOenergy_progress
08/29/2023Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
08/29/2023MeteringBAKHTIAR SHAMLOOenergy_progress
08/29/2023HVAC-R and service water heating system controlsBAKHTIAR SHAMLOOenergy_progress
08/29/2023Fenestration areasBAKHTIAR SHAMLOOenergy_progress
08/29/2023Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
08/29/2023Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
02/02/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
02/02/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
02/01/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
02/01/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
44 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account