← Back
BuildNYC
Two stories - detached, small or mid-size
147-07 JEWEL AVENUE
QUEENS · BIN 4143915
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R4AZoning
2,400 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,800 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
Floor 2Unit P202Under Construction1p · 1 filing · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
Site & exteriorUnder Construction30p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2022$990K—Private party → Private party$412/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yagudayev Architecture Studio607/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yagudayev Architecture Studio P403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRS Construction ExpediGeneral Contractor103/21/2026
DHC Power ManagementScaffold110/09/2026
American National PLG & HeatingPlumbing111/05/2007
GuerrerosGeneral Contractor211/08/2007
RS Construction & Exp ServiceGeneral Contractor109/15/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S Concrete & Soil Testi1008101/08/2026
Building Lifecycle
10/08/2026
Permit issued — Construction Fence
Q01336491-S1-FN
07/05/2026
Filed — Alteration
Filing for interior and exterior partial demolition, general construction work and horizontal enlargement as per plans. No change in use egress or occupancy
Q01336491-S5
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
GLEN LANGER
07/01/2026
Special inspection requirement — Maintenance information
GLEN LANGER
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
GLEN LANGER
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedDHC Power Management10/08/2026
BISOTISSUEDJRS Construction & Expediting02/03/2014
BIS—ISSUEDRS Construction & Exp Service09/15/2008
BISOTISSUEDGuerreros11/08/2007
BISPLISSUEDAmerican National PLG & Heating11/05/2007
BISOTISSUEDGuerreros11/01/2007
1 project · most recent 07/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/05/2026——Gas, Water/Sanitary
3 projects · most recent 10/18/2026
General Wiring
FiledStatusContractorScope
10/18/2026Permit IssuedJem Electrical ContractingGeneral Wiring
06/25/2025Permit IssuedAll Ways Electric Corp.w—
10/12/2022CompleteAccurate ElectricalGeneral Wiring
1 project · most recent 07/05/2026
Fence
FiledStatusContractorScope
07/05/2026Permit IssuedDHC Power ManagementFence
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
07/01/2026HVAC-R and service water heating system controlsGLEN LANGERenergy_progress
07/01/2026Maintenance informationGLEN LANGERenergy_progress
07/01/2026HVAC-R and service water piping design and insulationGLEN LANGERenergy_progress
07/01/2026Duct leakage testing, insulation and designGLEN LANGERenergy_progress
07/01/2026HVAC-R and service water heating equipmentGLEN LANGERenergy_progress
06/24/2026FinalGLEN LANGERprogress
06/24/2026Mechanical SystemsGLEN LANGERspecial
02/18/2026Structural Stability – Alterations of existing buildings—special
02/18/2026Structural Stability – Alterations of existing buildings—special
02/18/2026Subsurface Investigations (Borings/Test Pits)—special
02/18/2026Subsurface Conditions – Fill Placement & In-Place Density—special
02/18/2026Concrete - Cast-In-Place—special
02/18/2026Subgrade Inspections—special
02/18/2026Structural Steel - Welding—special
02/18/2026Structural Steel - High Strength Bolting—special
02/18/2026Structural Steel - Details—special
02/18/2026Structural Cold-Formed Steel—special
02/18/2026Post-installed Anchors—special
02/18/2026Designated Seismic System—special
01/29/2026Footing and Foundation—progress
01/29/2026Final—progress
01/29/2026Final—progress
01/08/2026Maintenance informationGLEN LANGERenergy_progress
01/08/2026HVAC-R and service water heating system controlsGLEN LANGERenergy_progress
01/08/2026HVAC-R and service water heating equipmentGLEN LANGERenergy_progress
Latest 25 of 41.
102 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account