ECB09/28/2026Failure to maintain in code-compliant manner. At time of inspection, i observed the cellar level ceiling left open. Exposed wood joists and sub floor to first floor level. No fireproofing in ceiling between flo$2K due
ECB09/11/2026Failure to maintain building in code compliant manner. At time of inspection observed at 1ST fl. Floor severely uneven along with sagging. Bathroom/main floor severe cracks & deterioration., repair and/or repla$1K due
DOB09/11/2026Structure rendered non-compliant. At time of inspection observed cracks at bathroom and main floor of a commercial space.
DOB11/14/2025Violation issued-failure to file 2024 external low pressure inspection
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Contractors (License-Anchored)
Firm
Trade
Roles
Most Recent
B H & B Construction
General Contractor
1
07/08/2013
Building Lifecycle
09/28/2026
Failure to maintain in code-compliant manner. At time of inspection, i observed the cellar level ceiling left open. Exposed wood joists and sub…
ECB violation · open
09/11/2026
Work without a permit. At time of inspection observed plumbing work has been performed consisting of new gas lines at cellar to gas meters also gas…
ECB violation · closed
09/11/2026
Failure to maintain building in code compliant manner. At time of inspection observed at 1ST fl. Floor severely uneven along with sagging.…
ECB violation · open
09/11/2026
Structure rendered non-compliant. At time of inspection observed cracks at bathroom and main floor of a commercial space.
DOB violation · open
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
Permit / Filing Register
Source
Work Type
Status
Applicant
Issued
BIS
—
B H & B Construction
—
Nothing on file for this building.
Nothing on file for this building.
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account