← Back
BuildNYC
Two family converted from one family
147-10 HUXLEY STREET
QUEENS · Rosedale · BIN 4291951
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3XZoning
3,085 sfGross Floor Area
2Units
Two family converted from one family · 5,980 sf lot · 0.52 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofProposed PV solar system installationUnder Construction10p · 2 filings · 20 docs
AtticHorizontal & Vertical Enlargement. Conversion to Two-family 26p · 1 filing · 20 docs
Floor 2Proposed PV solar system installationUnder Construction27p · 2 filings · 20 docs
Floor 1Unit 1A26p · 1 filing · 20 docs
CellarHorizontal & Vertical Enlargement. Conversion to Two-family 32p · 1 filing · 20 docs
Site & exteriorHorizontal & Vertical Enlargement. Conversion to Two-family 28p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkside Realty Group1907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/10/2023$1.4M—17237 125 AVE LLC → Private party$444/sf building
07/18/2022$650K—THE ELLEN SICKER TRUST → 17237 125 AVE LLC$211/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Trinity Solar101/09/2026
CL Engineering505/05/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metro Design1003/21/2026
Aca Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Hayden Brown ConstructionGeneral Contractor203/21/2026
Hayden Brown ConstructionScaffold203/21/2026
Power Surge ElectricElectrical103/22/2026
Precision Home DevelopmentScaffold107/08/2026
Trinity Solarspecialty_contractor104/09/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bitopi Consultants7036101/09/2026
CL Engineering6781405/05/2023
Triangle Inspection & Tes7495205/05/2023
Building Lifecycle
01/14/2026
Permit issued — Solar
Q01342699-I1-SL
01/09/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01342699-I1
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
01/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTrinity Solar01/14/2026
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing02/10/2023
DOB NOWConstruction FenceSigned-offHayden Brown Cons12/27/2022
DOB NOWGeneral ConstructionPermit IssuedHayden Brown Cons12/16/2022
DOB NOWConstruction FenceSigned-offPrecision Home Development09/15/2022
1 project · most recent 05/05/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
05/05/2023Permit IssuedHayden Brown ConsAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 05/05/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/05/2023Signed-offInfiniti Esc PlumbingGas, Storm, Water/Sanitary
2 projects · most recent 04/11/2026
General Wiring
FiledStatusContractorScope
04/11/2026CompleteRedline Electric—
05/26/2023CompletePower Surge ElectricGeneral Wiring
1 project · most recent 05/05/2023
Steel Wood
FiledStatusContractorScope
05/05/2023Signed-offInfiniti Esc PlumbingSteel, Wood
1 project · most recent 01/09/2026
FiledStatusContractorScope
01/09/2026Permit IssuedTrinity Solar—
1 project · most recent 05/05/2023
Earthwork
FiledStatusContractorScope
05/05/2023Signed-offInfiniti Esc PlumbingEarthwork
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/17/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/17/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
01/06/2026Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
01/06/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
01/06/2026Energy Code Compliance InspectionsAyracon Almarazprogress
01/06/2026FinalAyracon Almarazprogress
01/06/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
06/20/2023Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
06/20/2023Mechanical SystemsCHRISTIAN LOZADAspecial
06/20/2023Heating SystemsCHRISTIAN LOZADAspecial
06/20/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
06/20/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/20/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/20/2023Footing and FoundationCHRISTIAN LOZADAprogress
06/20/2023Structural Wood FrameCHRISTIAN LOZADAprogress
06/20/2023Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
06/20/2023Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
06/20/2023HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/20/2023MeteringCHRISTIAN LOZADAenergy_progress
06/20/2023Fenestration areasCHRISTIAN LOZADAenergy_progress
06/20/2023HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/20/2023Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
06/20/2023Permanent certificateCHRISTIAN LOZADAenergy_progress
06/20/2023Maintenance informationCHRISTIAN LOZADAenergy_progress
06/20/2023Fenestration air leakageCHRISTIAN LOZADAenergy_progress
06/20/2023HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/20/2023Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
Latest 25 of 85.
57 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account