← Back
BuildNYC
Two family frame
147-11 21ST AVENUE
QUEENS · BIN 4624548
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3AZoning
2,234 sfGross Floor Area
2Units
Two family frame · 3,333 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Attic7p · 1 filing · 20 docs
Floor 223p · 1 filing · 20 docs
Floor 163p · 1 filing · 20 docs
Cellar24p · 1 filing · 20 docs
Site & exterior7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Whitestone Builders2407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2024$1.9M—Whitestone Builders → Private party— not available
10/28/2022$1.6M—Private party → Whitestone Builders— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BFS Architect805/14/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mastoras BuildersGeneral Contractor903/21/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BFS Architect7477705/14/2024
Triangle Inspection & Tes7495405/14/2024
Building Lifecycle
01/30/2025
Permit expired, never signed off — Earth Work
The city's record still shows this permit as issued, with no sign-off on its filing
Q00836313-I1-GC-CX
07/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/31/2024
Signed off — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q00836313-I1
Q00836313-S3
05/31/2024
Signed off — New Building
FILED HEREWITH FOR PLUMBING WORK IN CONJUNCTION WITH GC Q00836313-I1
Q00836313-S4
65 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMastoras Builders04/09/2024
DOB NOWEarth WorkPermit IssuedMastoras Builders01/30/2024
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing09/27/2023
DOB NOWMechanical SystemsPermit IssuedMastoras Builders07/20/2023
1 project · most recent 05/14/2024
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScope
05/14/2024Signed-offMastoras BuildersAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
1 project · most recent 05/14/2024
Sprinkler System
FiledStatusContractorScope
05/14/2024——Sprinkler System
1 project · most recent 05/14/2024
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
05/14/2024Signed-offInfiniti Esc PlumbingGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 08/24/2023
General Wiring
FiledStatusContractorScope
08/24/2023CompletePower Surge ElectricGeneral Wiring
1 project · most recent 05/14/2024
FiledStatusContractorScope
05/14/2024Signed-offMastoras Builders—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/17/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/05/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/05/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/05/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
05/30/2024Heating SystemsBelal Salimspecial
05/30/2024Subgrade InspectionsBelal Salimspecial
05/30/2024Fire-Resistant Penetrations and JointsBelal Salimspecial
05/30/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/30/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBelal Salimspecial
05/30/2024Mechanical SystemsBelal Salimspecial
05/30/2024MasonryBelal Salimspecial
05/30/2024Concrete - Cast-In-PlaceBelal Salimspecial
05/30/2024Footing and FoundationBelal Salimprogress
05/30/2024Fire-Resistance Rated ConstructionBelal Salimprogress
05/30/2024Energy Code Compliance InspectionsBelal Salimprogress
05/30/2024FinalBelal Salimprogress
05/30/2024Permanent certificateBelal Salimenergy_progress
05/30/2024Fenestration areasBelal Salimenergy_progress
05/30/2024Interior lighting powerBelal Salimenergy_progress
05/30/2024Duct leakage testing, insulation and designBelal Salimenergy_progress
05/30/2024Ventilation and air distribution systemBelal Salimenergy_progress
05/30/2024HVAC-R and service water heating equipmentBelal Salimenergy_progress
05/30/2024MeteringBelal Salimenergy_progress
05/30/2024Fenestration air leakageBelal Salimenergy_progress
05/30/2024Maintenance informationBelal Salimenergy_progress
05/30/2024Air barrier - visual inspectionBelal Salimenergy_progress
05/30/2024HVAC-R and service water heating system controlsBelal Salimenergy_progress
05/30/2024Insulation placement and R valuesBelal Salimenergy_progress
05/30/2024HVAC-R and service water piping design and insulationBelal Salimenergy_progress
Latest 25 of 120.
77 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account