← Back
Two family brick
147-22 SANFORD AVENUE
QUEENS · East Flushing · BIN 4121325
💬 Discuss this project
1955Year Built
2Stories
B1Building Class
R4-1Zoning
2,600 sfGross Floor Area
2Units
Two family brick · Owner of record: HCHJ149, LLC · 5,683 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Filed — no permit issued113p · 4 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/25/2023$1.7M—Private party → HCHJ149, LLC$665/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONCEPT DESIGN GROUP406/18/2026
Z & T ENGINEERING, P.C.305/08/2026
JKM ARCHITECTURE PC104/28/2025
SOYU ARCHITECTURE, INC.106/15/2024
MDG DESIGN GROUP407/21/2023
LUCID BUILDING ENGINEERING P.C.202/08/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP503/21/2026
C PLUS DESIGN GROUP203/21/2026
LEEKODESIGN103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LUCID BUILDING ENGINEERIN8196202/08/2023
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/09/2026Fire-Resistant Penetrations and Joints—special
06/09/2026HVAC-R and service water heating equipment—energy_progress
06/09/2026Maintenance information—energy_progress
05/05/2026Construction Operations Influencing Adjacent Structures—special
05/05/2026Structural Steel - Details—special
05/05/2026Structural Steel - High Strength Bolting—special
05/05/2026Structural Steel - Welding—special
05/05/2026Excavations - Sheeting, Shoring, and Bracing—special
03/27/2026Footing and Foundation—progress
03/27/2026Final—progress
03/21/2026Sprinkler Systems—special
06/06/2024Structural Stability – Alterations of existing Buildings—special
07/19/2023Final—progress
07/19/2023HVAC-R and service water piping design and insulation—energy_progress
07/19/2023HVAC-R and service water heating equipment—energy_progress
07/19/2023HVAC-R and service water heating system controls—energy_progress
07/19/2023Structural Steel - Welding—special
07/19/2023Final—progress
07/19/2023Structural Stability – Alterations of existing buildings—special
07/19/2023Structural Steel - Details—special
07/19/2023Mechanical Systems—special
07/17/2023Fire-Resistant Penetrations and Joints—special
Latest 25 of 31.
Nothing on file for this building.