Two family converted from one family
147-27 249 STREET
QUEENS · Rosedale · BIN 4289679
💬 Discuss this project
1945Year Built
1.67Stories
B3Building Class
R3XZoning
1,503 sfGross Floor Area
2Units
Two family converted from one family · 5,000 sf lot · 0.3 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR208/19/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281208/19/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/26/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 19 Panels, 7.79 kW
Q01091106-I1
08/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/20/2025
Special inspection requirement — Final
Mina Makar
08/20/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
08/19/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 19 Panels, 7.79 kW
Q01091106-P1
08/14/2024
Permit issued — Solar
Q01091106-I1-SL
08/08/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 19 Panels, 7.79 kW
Q01091106-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR08/14/2024
1 project · most recent 08/05/2024
FiledStatusContractorScope
08/05/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/20/2025Fire-Resistant Penetrations and JointsMina Makarspecial
08/20/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
08/20/2025Energy Code Compliance InspectionsMina Makarprogress
08/20/2025FinalMina Makarprogress
08/20/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01091106-I1Request digital key ↗
08/21/2026Q01091106-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01091106-I1Open ↗
08/13/2026Q01091106-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q01091106-I1Open ↗
08/28/2026Q01091106-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q01091106-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01091106-I1Open ↗
08/13/2026Q01091106-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01091106-I1Open ↗