P.S. 21 Edward Hart
147-36 26TH AVENUE · BIN 4108665
💬 Discuss this project
1962Year Built
3Stories
W1Building Class
R3-1Zoning
91,100 sfGross Floor Area
1Units
LL97 Covered4 Active Violations 0 unresolved · 4 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 106,800 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 21 Edward HartUnder Construction22p · 1 filing · 19 docs
Floor 1P.S. 21 Edward Hart8p · 1 filing · 18 docs
Site & exteriorP.S. 21 Edward HartUnder Construction22p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority11407/08/2026
Generate Hudson Solar403/21/2026
NYC Department of Education303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eme Consulting Engineering Group212/10/2025
NYMS Consulting412/13/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Mechanical SystemsScaffold2507/08/2026
Central Mechanical Systemsspecialty_contractor1007/08/2026
Cedar Electrical ContractorsElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
A & S ElectricElectrical103/21/2026
Enl Mechanicalspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351212/10/2025
Universal Testing and Ins400312/13/2021
Building Lifecycle
All (121)Filed (6)Permit Issued (25)Violation (60)Inspection (1)Objection (4)Special Inspection (25)
03/17/2026
Violation issued (ECB, open)
Construction
03/10/2026
Permit issued — Mechanical Systems
Q00571083-S3-MS
01/08/2026
Permit issued — Sidewalk Shed
Q00571083-S1-SH
01/07/2026
Permit issued — Sidewalk Shed
Q00571083-S1-SF
01/07/2026
Permit issued — Construction Fence
Q00571083-I1-FN
12/19/2025
Permit issued — Mechanical Systems
Q00956352-I1-MS
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
12/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
12/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
12/12/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
12/12/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
12/12/2025
Special inspection requirement — Final
Asma Hashmi
12/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
12/12/2025
Special inspection requirement — Maintenance information
Asma Hashmi
12/10/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEMS FOR THE 1ST GYMNASIUM.
Q00956352-P1
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
12/08/2025
Special inspection requirement — Maintenance information
Asma Hashmi
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
12/08/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
12/08/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
12/08/2025
Special inspection requirement — Final
Asma Hashmi
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
09/22/2025
Violation issued (ECB, closed)
Construction
09/22/2025
Violation issued (ECB, closed)
Construction
03/26/2025
Permit issued — Mechanical Systems
Q00571083-S3-MS
01/27/2025
Permit issued — Supported Scaffold
Q00571083-S1-SH
01/08/2025
Permit issued — Sidewalk Shed
Q00571083-S1-SF
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2024
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEMS FOR THE 1ST GYMNASIUM.
Q00956352-I1
03/27/2024
Permit issued — Mechanical Systems
Q00571083-S3-MS
01/10/2024
Permit issued — Construction Fence
Q00571083-I1-FN
01/10/2024
Permit issued — Supported Scaffold
Q00571083-S1-SH
01/09/2024
Permit issued — Sidewalk Shed
Q00571083-S1-SF
10/06/2023
Permit issued — Mechanical Systems
Q00571083-S3-MS
10/04/2023
Violation issued (ECB, open)
Elevators
04/01/2023
Permit issued — Mechanical Systems
Q00571083-S3-MS
03/30/2023
Permit issued — Sidewalk Shed
Q00571083-S1-SF
01/12/2023
Permit issued — Mechanical Systems
Q00571083-S3-MS
01/05/2023
Permit issued — Sidewalk Shed
Q00571083-S1-SH
01/05/2023
Permit issued — Sidewalk Shed
Q00571083-S1-SF
12/27/2022
Permit issued — Construction Fence
Q00571083-I1-FN
12/06/2022
Permit issued — Construction Fence
Q00571083-I1-FN
04/14/2022
Violation issued (ECB, closed)
Construction
03/07/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/10/2022
Permit issued — Mechanical Systems
Q00571083-S3-MS
01/07/2022
Permit issued — Sidewalk Shed
Q00571083-S1-SH
01/07/2022
Permit issued — Boiler Equipment
Q00571083-S2-BE
01/03/2022
Permit issued — Sidewalk Shed
Q00571083-S1-SF
12/17/2021
Objection raised — Other
12/17/2021
Objection resolved — Addressed
12/13/2021
Filed — Alteration
PS 021Q, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPING TO CONNECT TEMPORARY BOILER ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # 421898717. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00571083-S1
12/13/2021
Filed — Alteration
PS 021Q, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPING TO CONNECT TEMPORARY BOILER ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # 421898717. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00571083-S3
12/13/2021
Objection raised — Other
12/13/2021
Objection resolved — Addressed
12/06/2021
Permit issued — Construction Fence
Q00571083-I1-FN
11/30/2021
Filed — Alteration
PS 021Q, INSTALLATION OF TEMPORARY CHIMNEY, STEAM, CONDENSATE & MAKEUP WATER PIPING TO CONNECT TEMPORARY BOILER ON BEHALF OF CONTRACTOR IN CONJUNCTION WITH DOB # 421898717. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00571083-S2
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCentral Mechanical System03/10/2026
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/08/2026
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/07/2026
DOB NOWConstruction FencePermit IssuedCentral Mechanical System01/07/2026
DOB NOWMechanical SystemsPermit IssuedEnl Mechanical12/19/2025
DOB NOWMechanical SystemsSigned-offCentral Mechanical System03/26/2025
DOB NOWSupported ScaffoldPermit IssuedCentral Mechanical System01/27/2025
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/08/2025
DOB NOWMechanical SystemsSigned-offCentral Mechanical System03/27/2024
DOB NOWConstruction FencePermit IssuedCentral Mechanical System01/10/2024
DOB NOWSupported ScaffoldPermit IssuedCentral Mechanical System01/10/2024
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/09/2024
DOB NOWMechanical SystemsSigned-offCentral Mechanical System10/06/2023
DOB NOWMechanical SystemsSigned-offCentral Mechanical System04/01/2023
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System03/30/2023
DOB NOWMechanical SystemsSigned-offCentral Mechanical System01/12/2023
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/05/2023
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/05/2023
DOB NOWConstruction FencePermit IssuedCentral Mechanical System12/27/2022
DOB NOWConstruction FencePermit IssuedCentral Mechanical System12/06/2022
DOB NOWMechanical SystemsSigned-offCentral Mechanical System01/10/2022
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/07/2022
DOB NOWBoiler EquipmentSigned-offChampion Combustion01/07/2022
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System01/03/2022
DOB NOWConstruction FencePermit IssuedCentral Mechanical System12/06/2021
BISOTISSUEDCentral Mechanical Systems03/27/2026
BISMHISSUEDCentral Mechanical Systems03/27/2026
BISOTISSUEDCentral Mechanical Systems03/27/2026
BISOTISSUEDCentral Mechanical Systems03/27/2026
BISOTISSUEDCentral Mechanical Systems03/11/2026
BISMHISSUEDCentral Mechanical Systems03/11/2026
BISOTISSUEDCentral Mechanical Systems03/11/2026
BISOTISSUEDCentral Mechanical Systems03/11/2026
BISMHISSUEDCentral Mechanical Systems03/26/2025
BISOTISSUEDCentral Mechanical Systems03/26/2025
BISOTISSUEDCentral Mechanical Systems03/26/2025
BISOTISSUEDCentral Mechanical Systems03/26/2025
BISOTISSUEDCentral Mechanical Systems03/29/2024
BISOTISSUEDCentral Mechanical Systems03/29/2024
BISOTISSUEDCentral Mechanical Systems03/29/2024
+ 35 more permits on file
1 project · most recent 12/10/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/10/2025Permit IssuedEnl MechanicalHeating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 36,000 BTU · Fan Coil Indoor ×20
AOU120RLAVL 120,000 BTU · Condensing Unit ×6
12 projects · most recent 12/12/2025
Lighting General Wiring
FiledStatusContractorScope
12/12/2025CompleteCharan Electrical Enterp's—
06/04/2025Permit IssuedLvi NYC ElectricalLighting
04/25/2025CompleteGemini Electric Co—
02/02/2024CompleteTower ElectricGeneral Wiring, Lighting
12/30/2022CompletePrince Electric—
11/21/2022CompleteCharan Electrical Enterp's—
01/06/2022CompleteTower Electric—
09/27/2021CompleteAll Systems Electric NYGeneral Wiring
08/05/2020CompleteCharan Electrical Enterp's—
01/18/2020CompleteLaser Electrical Contracting—
11/27/2019CompleteCharan Electrical Enterp's—
01/07/2019CompleteCharan Electrical Enterp's—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
12/12/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
12/12/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
12/12/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/12/2025Mechanical SystemsAsma Hashmispecial
12/12/2025Post-installed AnchorsAsma Hashmispecial
12/12/2025Energy Code Compliance InspectionsAsma Hashmiprogress
12/12/2025FinalAsma Hashmiprogress
12/12/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
12/12/2025Maintenance informationAsma Hashmienergy_progress
12/08/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
12/08/2025Maintenance informationAsma Hashmienergy_progress
12/08/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
12/08/2025Mechanical SystemsAsma Hashmispecial
12/08/2025Post-installed AnchorsAsma Hashmispecial
12/08/2025Energy Code Compliance InspectionsAsma Hashmiprogress
12/08/2025FinalAsma Hashmiprogress
12/08/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
12/08/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
11/24/2021HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
11/24/2021Mechanical SystemsNELSON LOPEZspecial
11/24/2021FinalNELSON LOPEZprogress
11/24/2021Chimneys and ventsNELSON LOPEZspecial
11/24/2021Post-installed AnchorsNELSON LOPEZspecial
11/23/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsNELSON LOPEZspecial
11/01/2021Post-installed AnchorsNELSON LOPEZspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 21 Edward HartEducationFloor 1, Roof
Project Q00956352 Alteration · Permit Entire · 04/09/2024
Project Q00571083 Alteration · Permit Entire · 08/06/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00571083-S3Request digital key ↗
08/26/2026Q00571083-S1Request digital key ↗
08/26/2026Q00571083-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/17/2021440664309Open ↗
▸BISWORK PERMIT APPLICATION1
03/08/2021440664309Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature14
09/25/2026Q00956352-I1Open ↗
09/25/2026Q00956352-I1Open ↗
09/25/2026Q00956352-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/25/2026Q00956352-I1Open ↗
09/25/2026Q00956352-I1Open ↗
09/25/2026Q00956352-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00571083-S2Open ↗
08/26/2026Q00571083-S1Open ↗
08/26/2026Q00571083-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/17/2021440664309Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/17/2021440664309Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/17/2021440664309Open ↗
▸Safety & Tenant Protection2
▸DOB NOWNYCSCA - Approved Site Safety Plans2
08/13/2026Q00571083-I1Open ↗
08/13/2026Q00571083-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00571083-S3Open ↗
08/18/2026Q00956352-P1Open ↗
08/18/2026Q00956352-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/17/2021440664309Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/28/2021440664309Open ↗
02/17/2021440664309Open ↗
▸BISNYCECC ANALYSIS1
02/17/2021440664309Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/27/2021440664309Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/17/2021440664309Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/28/2021440664309Open ↗
10/28/2021440664309Open ↗
03/05/2021440664309Open ↗
Showing 3 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/08/2021440664309Open ↗
▸Approvals, Objections & Sign-offs15
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026Q00571083-S2Open ↗
08/13/2026Q00571083-S3Open ↗
08/13/2026Q00956352-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/13/2026Q00571083-I1Open ↗
08/13/2026Q00956352-P1Open ↗
08/13/2026Q00571083-S1Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/28/2021440664309Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
10/28/2021440664309Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
02/17/2021440664309Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/27/2021440664309Open ↗
02/17/2021440664309Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/17/2021440664309Open ↗
▸Other Documents6
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal6
08/13/2026Q00571083-S1Open ↗
08/13/2026Q00571083-S2Open ↗
08/13/2026Q00956352-P1Open ↗
Showing 3 of 6 on file for this type