← Back
Two family converted from one family
147-50 231 STREET
QUEENS · BIN 4291388
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R3-1Zoning
2,399 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · Owner of record: YEVGENY ENTERPRISES INC. · 4,000 sf lot · 0.6 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbing
Floor 24p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
10428 MERRICK BLVD1507/08/2026
J J DESIGNS303/22/2026
JCL REALTY103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/21/2023$498K—— → —$208/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.512/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor303/21/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
INDY ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781512/13/2024
TRIANGLE INSPECTION & TES7495211/13/2024
Building Lifecycle
All (61)Filed (5)Permit Issued (3)Signed Off (1)Violation (3)Inspection (5)Objection (14)Special Inspection (30)
02/14/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE FAMILY BUILDING INTO A TWO STORY TWO FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00942980-S1
02/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Metering
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Final
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Masonry
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Structural Steel - Details
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/05/2025
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Structural Steel - High Strength Bolting
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Ventilation and air distribution system
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Air barrier — testing
CHRISTIAN LOZADA
02/05/2025
Special inspection requirement — Insulation placement and R values
CHRISTIAN LOZADA
01/16/2025
Permit issued — Plumbing
Q00942980-S1-PL
01/13/2025
Objection resolved — Addressed
12/24/2024
Objection raised — Energy
12/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE FAMILY BUILDING INTO A TWO STORY TWO FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00942980-P3
12/04/2024
Objection resolved — Addressed
11/29/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE FAMILY BUILDING INTO A TWO STORY TWO FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00942980-P1
11/25/2024
Objection raised — Energy
11/13/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE FAMILY BUILDING INTO A TWO STORY TWO FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00942980-P2
03/28/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/28/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/15/2024
Violation issued (ECB, closed)
Construction
03/15/2024
Violation issued (ECB, closed)
Construction
03/15/2024
Violation issued (ECB, closed)
Unknown
01/22/2024
Permit issued — Plumbing
Q00942980-S1-PL
12/29/2023
Permit issued — Mechanical Systems
Q00942980-I1-GC-CX
12/20/2023
Objection resolved — Addressed
12/05/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
CONVERSION OF THE EXISTING ONE AND HALF STORY ONE FAMILY BUILDING INTO A TWO STORY TWO FAMILY BUILDING AS SHOWN ON THE PLANS. PROPOSED VERTICAL AND HORIZONTAL ENLARGEMENT. INTERIOR RENOVATION AS PER PLAN. OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
Q00942980-S1
11/28/2023
Objection resolved — Addressed
11/28/2023
Objection resolved — Addressed
11/28/2023
Objection resolved — Addressed
11/28/2023
Objection resolved — Addressed
11/16/2023
Objection raised — Zoning
11/16/2023
Objection raised — Admin
11/16/2023
Objection raised — Admin
11/16/2023
Objection raised — Zoning
11/16/2023
Objection raised — Mechanical
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC01/16/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC01/22/2024
DOB NOWMechanical SystemsPermit IssuedJ&J DESIGNS INC12/29/2023
1 project · most recent 12/13/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/13/2024Permit IssuedJ&J DESIGNS INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Oxbox J4AC4036A1000AA 36,000 BTU · Condensing Unit ×3
Tuttokool AAC5036E1000A 60,000 BTU · Condensing Unit ×3
Heating
Oxbox J801V080BM4SEA 80,000 BTU · Furnace ×6
Ventilation
Hampton Bay 7114-01 50 CFM · Exhaust Fan ×15
Delta Breeze SMT150 150 CFM · Exhaust Fan ×2
1 project · most recent 12/13/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/13/2024Signed-offALL PRO PLBG & HTG INCGas, Storm, Water/Sanitary
1 project · most recent 01/04/2024
General Wiring
FiledStatusContractorScope
01/04/2024CompleteINDY ELECTRIC CORP.General Wiring
1 project · most recent 12/13/2024
Steel Wood
FiledStatusContractorScope
12/13/2024Signed-offALL PRO PLBG & HTG INCSteel, Wood
1 project · most recent 12/13/2024
Earthwork
FiledStatusContractorScope
12/13/2024Signed-offALL PRO PLBG & HTG INCEarthwork
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 107
DateRequirementInspectorRole
02/05/2025Duct leakage testing, insulation and designCHRISTIAN LOZADAenergy_progress
02/05/2025HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
02/05/2025Interior lighting powerCHRISTIAN LOZADAenergy_progress
02/05/2025Insulation placement and R valuesCHRISTIAN LOZADAenergy_progress
02/05/2025MeteringCHRISTIAN LOZADAenergy_progress
02/05/2025Maintenance informationCHRISTIAN LOZADAenergy_progress
02/05/2025HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
02/05/2025Air barrier — testing CHRISTIAN LOZADAenergy_progress
02/05/2025Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
02/05/2025Fenestration air leakageCHRISTIAN LOZADAenergy_progress
02/05/2025Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
02/05/2025Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
02/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
02/05/2025Fenestration areasCHRISTIAN LOZADAenergy_progress
02/05/2025Permanent certificateCHRISTIAN LOZADAenergy_progress
02/05/2025Ventilation and air distribution systemCHRISTIAN LOZADAenergy_progress
02/05/2025HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/05/2025Structural Wood FrameCHRISTIAN LOZADAprogress
02/05/2025Footing and FoundationCHRISTIAN LOZADAprogress
02/05/2025Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
02/05/2025FinalCHRISTIAN LOZADAprogress
02/05/2025Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/05/2025Excavations - Sheeting, Shoring, and BracingCHRISTIAN LOZADAspecial
02/05/2025Heating SystemsCHRISTIAN LOZADAspecial
02/05/2025Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
Latest 25 of 107.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026Q00942980-I1Request digital key ↗
08/21/2026Q00942980-S1Request digital key ↗
08/21/2026Q00942980-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/21/2026Q00942980-P1Open ↗
08/21/2026Q00942980-I1Open ↗
08/13/2026Q00942980-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/21/2026Q00942980-P1Open ↗
08/21/2026Q00942980-I1Open ↗
08/13/2026Q00942980-P3Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00942980-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature11
08/27/2026Q00942980-I1Open ↗
08/27/2026Q00942980-I1Open ↗
08/27/2026Q00942980-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/27/2026Q00942980-I1Open ↗
08/27/2026Q00942980-I1Open ↗
08/24/2026Q00942980-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026Q00942980-S1Open ↗
08/21/2026Q00942980-I1Open ↗
08/21/2026Q00942980-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026Q00942980-S1Open ↗
08/21/2026Q00942980-I1Open ↗
08/21/2026Q00942980-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/21/2026Q00942980-P1Open ↗
08/21/2026Q00942980-I1Open ↗
08/13/2026Q00942980-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00942980-I1Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/21/2026Q00942980-P1Open ↗
08/21/2026Q00942980-I1Open ↗
08/13/2026Q00942980-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/21/2026Q00942980-P1Open ↗
08/21/2026Q00942980-I1Open ↗
08/13/2026Q00942980-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026Q00942980-I1Open ↗
08/21/2026Q00942980-P1Open ↗
08/13/2026Q00942980-P3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00942980-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00942980-I1Open ↗