← Back
Two family converted from one family
147-56 230 PLACE
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R3-1Zoning
—Gross Floor Area
2Units
4 Open Violations ▸FDNY Report ↗
Two family converted from one family · 0.6 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/20/2025
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Violation (4)Special Inspection (4)
08/25/2025
Permit issued — Solar
Q01271196-I1-SL
08/20/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01271196-I1
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/13/2025
Special inspection requirement — Final
Walid Abdulla
03/28/2011
Violation issued (HPD, open)
I
02/19/2011
Violation issued (HPD, open)
B
02/19/2011
Violation issued (HPD, open)
B
02/19/2011
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/25/2025
BISEQISSUEDB.R HARRY CONSTRUCTION AND RESTO05/27/2004
BISEQISSUEDBLUE ICE CONTRACTING INC03/30/2004
BIS—ISSUEDBLUE ICE CONTRACTING INC03/30/2004
1 project · most recent 08/20/2025
FiledStatusContractorScope
08/20/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 08/20/2025
FiledStatusContractorScope
08/20/2025Signed-offSUNRUN INSTALLATION SVC28 panels, 11.48 kw, 294.32 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/13/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/13/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/13/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/13/2025FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01271196-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01271196-I1Open ↗
08/25/2026Q01271196-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q01271196-I1Open ↗
08/25/2026Q01271196-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/19/2026Q01271196-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/19/2026Q01271196-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01271196-I1Open ↗