← Back
Public elementary, junior or senior high
Success Academy Charter School - Rosedale
147-57 147 DRIVE · BIN 4289717
💬 Discuss this project
1965Year Built
3Stories
W1Building Class
R3XZoning
33,912 sfGross Floor Area
0Units
LL97 Covered8 Open Violations 2 unresolved · 6 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: ROMAN CATHOLIC CHURCH OF ST. PIUS X · 103,350 sf lot · 0.33 FAR built · Flood zone X500
Locations of Work
Roof1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T-MOBILE307/08/2026
ROMAN CATHOLIC CHURCH OF ST. PIUS X103/22/2026
DEPARTMENT OF EDUCATION703/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
DOE PS 374 040503/22/2026
DOE P.S.374103/22/2026
AT&T303/21/2026
ROMAN CATHOLIC CHURCH OF ST203/21/2026
ST PIUS X ROMAN CATHOLIC CHURCH203/21/2026
R C CHURCH OF ST PIUS X303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCHENERY TESTING LAB206/24/2026
CENTEK ENGINEERING, INC.104/01/2022
GRANT ENGINEERING CONSULTANTS, LLC101/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES103/21/2026
CCM CONSULTING GROUP, INC.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JACOBS TELECOMMUN. INCGeneral Contractor603/21/2026
A & H INSTALLATION INCGeneral Contractor206/28/2026
BECKER, CHARLESElectrical103/21/2026
BROWN, JERMAINEElectrical103/21/2026
FILARDI, JAMESElectrical103/21/2026
GARY EATONElectrical103/21/2026
HESCOTT, CARDINALElectrical103/21/2026
RAMSARRAN, RAMESHElectrical103/21/2026
VIALVA, JOSEPHElectrical103/21/2026
ANDREW CHARNOWElectrical103/21/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
APRILAKIS, EVANGELINAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRANT ENGINEERING CONSULT3512101/24/2022
Building Lifecycle
All (59)Filed (4)Permit Issued (5)Signed Off (2)Violation (34)Objection (14)
06/26/2026
Permit issued — Supported Scaffold
Q01418972-I1-SF
06/24/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01418941-I1
06/24/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01418972-I1
06/24/2026
Permit issued — Sidewalk Shed
Q01418941-I1-SH
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
03/06/2026
Violation issued (ECB, open)
Construction
10/30/2025
Violation issued (FDNY_ORDER, closed)
10/30/2025
Violation issued (FDNY_ORDER, closed)
10/30/2025
Violation issued (FDNY_ORDER, closed)
10/30/2025
Violation issued (FDNY_ORDER, closed)
10/30/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (ECB, closed)
Construction
09/20/2024
Violation issued (FDNY_ORDER, closed)
09/20/2024
Violation issued (FDNY_ORDER, closed)
09/20/2024
Violation issued (FDNY_ORDER, closed)
09/20/2024
Violation issued (FDNY_ORDER, closed)
09/20/2024
Violation issued (FDNY_ORDER, closed)
03/04/2024
Violation issued (ECB, closed)
Construction
10/30/2023
Signed off — Alteration
AT&T/ Replacement of existing telecommunications antennas with replacement of RRH units on roof. Removal and installation of cabinets in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00016391-I1
07/10/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Initial installation approved under application #400993341
Q00646639-I1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2023
Violation issued (ECB, closed)
Construction
11/02/2022
Violation issued (FDNY_NOV, closed)
08/22/2022
Permit issued — Antenna
Q00016391-I1-AN
04/28/2022
Permit issued — Antenna
Q00016391-I1-AN
04/01/2022
Filed — Alteration
AT&T/ Replacement of existing telecommunications antennas with replacement of RRH units on roof. Removal and installation of cabinets in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
Q00016391-I1
03/23/2022
Violation issued (ECB, closed)
Construction
03/23/2022
Violation issued (ECB, closed)
Construction
01/28/2022
Permit issued — Antenna
Q00646639-I1-AN
01/24/2022
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof. Initial installation approved under application #400993341
Q00646639-I1
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2019
Violation issued (FDNY_NOV, closed)
02/21/2019
Violation issued (ECB, closed)
Construction
02/21/2019
Violation issued (ECB, closed)
Construction
10/10/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
10/10/2018
Objection resolved — Addressed
10/10/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
10/10/2018
Objection resolved — Addressed
10/10/2018
Objection raised — 1998-AN AC 28-103.14.1-Adminis
10/10/2018
Objection resolved — Addressed
10/10/2018
Objection raised — 2014-AN AC 28-104.7.1-Administ
10/10/2018
Objection resolved — Addressed
10/10/2018
Objection raised — 1998-AN BC 501.3-Building Code
10/10/2018
Objection resolved — Addressed
10/10/2018
Objection raised — Other
10/10/2018
Objection resolved — Addressed
10/10/2018
Objection raised — 2014-AN BC 1704-Building Code-
10/10/2018
Objection resolved — Addressed
06/29/2017
Violation issued (FDNY_ORDER, closed)
03/08/2017
Violation issued (ECB, closed)
Construction
03/08/2017
Violation issued (ECB, closed)
Construction
03/08/2017
Violation issued (ECB, closed)
Construction
03/31/2016
Violation issued (ECB, closed)
Construction
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2006
Violation issued (ECB, closed)
Construction
06/03/1991
Violation issued (ECB, open)
Local Law
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedA & H INSTALLATION INC06/26/2026
DOB NOWSidewalk ShedPermit IssuedA & H INSTALLATION INC06/24/2026
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR08/22/2022
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR04/28/2022
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU01/28/2022
BISOTISSUEDL.E.C.INC02/17/2021
BISOTISSUEDPARISH PROPERTY MANAGEMENT06/21/2017
BISEQISSUEDEVEREST SCAFFOLDING INC05/08/2017
BISEQISSUEDEVEREST SCAFFOLDING INC04/25/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC04/04/2017
BISOTISSUEDPARISH PROPERTY MANAGEMENT04/03/2017
BISEQISSUEDEVEREST SCAFFOLDING INC05/19/2016
BISOTISSUEDPRO CON GROUP INC09/16/2015
BISOTISSUEDBECHTEL INFRASTRUCTURE AN07/14/2015
BISOTISSUEDJRC RENOVATIONS INC06/29/2015
BISOTISSUEDFAZIO CONSTRUCTION GROUP06/15/2015
BISEQISSUEDEVEREST SCAFFOLDING INC06/12/2015
BISEQISSUEDEVEREST SCAFFOLDING INC05/27/2015
BISOTISSUEDBECHTEL INFRASTRUCTURE AN04/08/2014
BISOTISSUEDTELCOM ENGINEERING GP INC09/16/2013
BISOTISSUEDTRANSCEND WIRELESS LLC02/26/2013
BISOTISSUEDODYSSIA GLOBAL COMM. CORP07/12/2012
BISOTISSUEDCOSTROTTA CONSTRUCT MG IN03/23/2012
BISPLISSUEDEMPIRE STATE PLBG & HTG C03/09/2010
BISOTISSUEDODYSSIA GLOBAL COMM. CORP09/20/2004
BISOTISSUEDGJF COSNTRUCTION12/21/2000
BISMHISSUEDSTEPLIN CONSTRUCTION CORP.07/16/1999
9 projects · most recent 06/18/2026
FiledStatusContractorScope
06/18/2026Permit IssuedRICHARD NEU—
04/28/2025CompleteGEMINI ELECTRIC CO., INC.—
01/02/2024CompleteGEMINI ELECTRIC CO., INC.—
10/29/2019CompleteCHARAN ELEC'L ENTERP'S IN—
06/21/2019Permit IssuedALL WAYS ELECTRIC CORP.W1 meters
06/12/2019CompleteSMART ELECTRIC SERVICES—
06/25/2018CompleteCHARAN ELEC'L ENTERP'S IN—
06/14/2018CompleteSMART ELECTRIC SERVICES—
05/23/2018CompleteSMART ELECTRIC SERVICES—
2 projects · most recent 06/24/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/24/2026Permit IssuedA & H INSTALLATION INCSidewalk Shed
06/24/2026Permit IssuedA & H INSTALLATION INCScaffold
Nothing on file for this building.
▾Documents — 237 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00646639-I1Request digital key ↗
08/16/2026Q01418972-I1Request digital key ↗
08/16/2026Q01418941-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits49
▸BISPLAN / WORK APPROVAL APPLICATION26
05/01/2023421089244Open ↗
07/11/2022421089244Open ↗
04/24/2020402530132Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION23
02/17/2021421961238Open ↗
04/29/2020421961238Open ↗
12/26/2019421089244Open ↗
Showing 3 of 23 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWFlood Zone Design Certification1
08/13/2026Q00016391-I1Open ↗
▸DOB NOWFlood Zone Compliance1
08/13/2026Q00016391-I1Open ↗
▸Seals & Professional Certifications44
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION27
04/17/2020421961238Open ↗
01/10/2018421156705Open ↗
10/17/2017440221804Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/24/2017440400362Open ↗
04/17/2017421460886Open ↗
06/13/2015421156705Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00016391-I1Open ↗
08/16/2026Q01418972-I1Open ↗
08/16/2026Q01418941-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
04/24/2017440400362Open ↗
06/11/2015440226621Open ↗
05/22/2015440221804Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/24/2017440400362Open ↗
06/11/2015440226621Open ↗
05/22/2015440221804Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/17/2017421460886Open ↗
06/13/2015421156705Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos19
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
04/17/2020421961238Open ↗
04/24/2017440400362Open ↗
04/17/2017421460886Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
03/23/2012420547377Open ↗
06/30/2011420372803Open ↗
06/23/2010420204932Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026Q00016391-I1Open ↗
08/13/2026Q00646639-I1Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
06/23/2015421156705Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
02/13/2018421156705Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
09/23/2015421171742Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
04/17/2020421961238Open ↗
04/17/2017421460886Open ↗
04/17/2017421089244Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
08/23/2023421089244Open ↗
05/26/2021421961238Open ↗
02/13/2018421156705Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/23/2023421089244Open ↗
05/01/2023421089244Open ↗
05/26/2021421961238Open ↗
▸BISTR8: Energy Code Progress Inspections1
08/31/2011420372803Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/23/2012420547377Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/22/2015440221804Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/23/2023421089244Open ↗
08/23/2023421089244Open ↗
05/01/2023421089244Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
08/24/2023421089244Open ↗
05/26/2021421961238Open ↗
02/13/2018421156705Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
06/13/2015421156705Open ↗
06/10/2015421171742Open ↗
05/30/2015421164117Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/29/2020421961238Open ↗
05/26/2017440221804Open ↗
05/26/2017440221804Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER4
12/26/2019421089244Open ↗
07/07/2017421156705Open ↗
05/27/2016440221804Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/16/2026Q01418972-I1Open ↗
08/16/2026Q01418941-I1Open ↗
▸BISSHED LETTER1
05/27/2016440221804Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT21
08/23/2023421089244Open ↗
04/26/2023421089244Open ↗
05/26/2021421961238Open ↗
Showing 3 of 21 on file for this type
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET9
04/17/2020421961238Open ↗
04/17/2017421460886Open ↗
06/13/2015421156705Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION8
05/25/2023421089244Open ↗
05/28/2019421089244Open ↗
05/28/2019421089244Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
04/29/2020421961238Open ↗
04/24/2020402530132Open ↗
04/20/2020402530132Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/24/2017440400362Open ↗
06/11/2015440226621Open ↗
05/22/2015440221804Open ↗
▸Other Documents6
▸BISFEE EXEMPTION DOCUMENTATION3
04/24/2017440400362Open ↗
06/11/2015440226621Open ↗
05/22/2015440221804Open ↗
▸BISTax Abatement Miscellaneous1
06/13/2015421156705Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00016391-I1Open ↗
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026Q00016391-I1Open ↗