← Back
BuildNYC
One story - permanent living quarter
147 BROWNING AVENUE
STATEN ISLAND · BIN 5023254
💬 Discuss this project
1965Year Built
1Stories
A2Building Class
R1-2Zoning
3,753 sfGross Floor Area
1Units
One story - permanent living quarter · 8,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofEnlargement to 1 Family Residence2p · 1 filing · 20 docs
Floor 2Enlargement to 1 Family Residence9p · 2 filings · 20 docs
Floor 1Curb cut installation16p · 3 filings · 20 docs
CellarEnlargement to 1 Family Residence8p · 1 filing · 16 docs
BasementEnlargement to 1 Family Residence1 filing · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Think Design Architecture810/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.R. ContractingScaffold303/21/2026
D.R. ContractingGeneral Contractor207/08/2026
JB Buzco PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738610/23/2023
Building Lifecycle
10/31/2023
Signed off — Alteration CO
APPLICATION IS FILED FOR VERTICAL ENLARGEMENT TO AN EXISTING ONE FAMILY, 1 STORY FRAME RESIDENCE. APPLICATION FILED TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY. ALL WORK AS PER PLANS SUBMITTED HEREWITH.
S00754876-I1
10/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/24/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/24/2023
Special inspection requirement — Structural Steel - Details
anthony santoro
10/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
57 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offD.R. Contracting09/11/2023
DOB NOWPlumbingSigned-offJB Buzco Plumbing12/20/2022
DOB NOWStructuralPermit IssuedD.R. Contracting09/26/2022
DOB NOWConstruction FenceSigned-offD.R. Contracting08/26/2022
1 project · most recent 10/23/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
10/23/2023Permit IssuedD.R. ContractingAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 07/26/2023
General Wiring
FiledStatusContractorScope
07/26/2023CompleteLaser Lite Elect'lGeneral Wiring
1 project · most recent 10/23/2023
Steel Wood
FiledStatusContractorScope
10/23/2023Permit IssuedD.R. ContractingSteel, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
10/04/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
10/24/2023Mechanical Systemsanthony santorospecial
10/24/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
10/24/2023Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
10/24/2023Structural Steel - Detailsanthony santorospecial
10/24/2023Structural Stability – Alterations of existing buildingsanthony santorospecial
10/24/2023Concrete - Cast-In-Placeanthony santorospecial
10/24/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
10/24/2023Structural Wood Frameanthony santoroprogress
10/24/2023Fire-Resistance Rated Constructionanthony santoroprogress
10/24/2023Energy Code Compliance Inspectionsanthony santoroprogress
10/24/2023Finalanthony santoroprogress
10/24/2023Maintenance informationanthony santoroenergy_progress
10/24/2023Fenestration air leakageanthony santoroenergy_progress
10/24/2023Fenestration areasanthony santoroenergy_progress
10/24/2023Shutoff dampersanthony santoroenergy_progress
10/24/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
10/24/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/24/2023Protection of exposed foundation insulationanthony santoroenergy_progress
10/24/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
10/24/2023Insulation placement and R valuesanthony santoroenergy_progress
10/24/2023Duct leakage testing, insulation and designanthony santoroenergy_progress
10/24/2023Lighting in dwelling unitsanthony santoroenergy_progress
10/24/2023Permanent certificateanthony santoroenergy_progress
10/23/2023Maintenance informationanthony santoroenergy_progress
10/23/2023Concrete - Cast-In-Placeanthony santorospecial
Latest 25 of 77.
110 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account