← Back
City residence, one family
147 CLIFTON PLACE
BROOKLYN · BIN 3055649
💬 Discuss this project
1899Year Built
2Stories
A4Building Class
R6BZoning
1,908 sfGross Floor Area
1Units
City residence, one family · Owner of record: BH 147CP LLC · 3,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction48p · 1 filing · 20 docs
Floor 5Under Construction16p · 1 filing · 20 docs
Floor 4Under Construction23p · 1 filing · 20 docs
Floor 3Under Construction43p · 1 filing · 20 docs
Floor 2Under Construction24p · 1 filing · 20 docs
Floor 1Under Construction43p · 1 filing · 20 docs
CellarUnder Construction47p · 1 filing · 20 docs
1 job · most recent 07/10/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/10/2026Permit IssuedSAT CONSTRUCTION SERVICESAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MUY-GL09NA 9,000 BTU · Heat Pump Outdoor ×2
Heat / Cool
Toshiba MUB036HS2P 40,000 BTU · Vrf Outdoor ×8
37MARAQ18AA1 21,000 BTU ×2
MUB048HS2P 54,000 BTU · Vrf Outdoor ×2
Greenheck CUE-140HP-5-VG-1-22-G 400 CFM · Kitchen Exhaust ×2
Ventilation
Greenheck CUE-140HP-5-VG-1-22-X 400 CFM · Exhaust Fan ×4
1 job · most recent 07/10/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/10/2026——Storm, Water/Sanitary
2 jobs · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
10/21/2025CompleteRICHARD NEU—
1 job · most recent 07/10/2026
Concrete
FiledStatusContractorScope
07/10/2026Permit IssuedSAT CONSTRUCTION SERVICESConcrete
2 jobs · most recent 07/10/2026
Fence
FiledStatusContractorScope
07/10/2026Permit IssuedSAT CONSTRUCTION SERVICESFence
09/04/2025Permit IssuedSAT CONSTRUCTION SERVICESFence
Building Lifecycle
All (73)Filed (14)Permit Issued (11)Signed Off (2)Inspection (2)Objection (14)Special Inspection (30)
09/02/2026
Permit issued — Foundation
B01259972-S2-FO
09/02/2026
Permit issued — Mechanical Systems
B01259972-S5-MS
09/01/2026
Permit issued — Structural
B01259972-S1-ST
08/13/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/04/2026
Objection resolved — Addressed
07/30/2026
Objection raised — Other
07/28/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/10/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-P3
07/02/2026
Permit issued — General Construction
B01259972-I1-GC
06/30/2026
Permit issued — Support of Excavation
B01259972-S3-SE
06/24/2026
Objection resolved — Addressed
06/23/2026
Permit issued — Construction Fence
B01259972-S4-FN
06/23/2026
Objection raised — Other
06/22/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-P2
06/15/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
Younes Abouyaala
05/22/2026
Special inspection requirement — Final
NAVEEN KUMAR
05/22/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/22/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
05/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
05/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/22/2026
Special inspection requirement — Shutoff dampers
Younes Abouyaala
05/20/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-P1
05/06/2026
Special inspection requirement — Shutoff dampers
05/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/06/2026
Special inspection requirement — Mechanical Systems
05/06/2026
Special inspection requirement — Final
05/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
05/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/06/2026
Special inspection requirement — Maintenance information
03/30/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-S5
03/19/2026
Objection raised — Other
03/18/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-S6
03/18/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
03/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
03/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
03/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
03/17/2026
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
03/11/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-S3
01/21/2026
Objection resolved — Addressed
01/14/2026
Objection raised — Other
12/29/2025
Signed off — Full Demolition
Full demolition of a one family residence
B01244565-I1
12/22/2025
Objection resolved — Addressed
12/18/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-S4
12/12/2025
Objection raised — Other
12/12/2025
Objection raised — Other
12/08/2025
Permit issued — Full Demolition
B01244565-I1-FD
12/01/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-S1
12/01/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-S2
11/26/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM AS PER PLANS SUBMITTED HEREWITH IN CONJUNCTION WITH B01259972-I1
B01259972-I1
11/25/2025
Permit issued — Construction Fence
B01244554-I1-FN
11/20/2025
Signed off — Alteration
B01305855-I1
11/12/2025
Permit issued — Full Demolition
B01244565-I1-FD
11/12/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
11/12/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
11/12/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
11/12/2025
Special inspection requirement — Masonry
Younes Abouyaala
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONTRACTING GROUP404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2025$2.1M—— → —$1,127/sf building
03/26/2025$1.6M—Private party → CLIFTON HOLDINGS 147 LLC$839/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHRISE GROUP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAT CONSTRUCTION SERVICESGeneral Contractor809/07/2026
MORGAN SERVICES GROUP CORGeneral Contractor204/09/2026
PARK CONTRACTING GROUPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519503/30/2026
STROH ENGINEERING SERVICE3316210/13/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedSAT CONSTRUCTION SERVICES09/02/2026
DOB NOWMechanical SystemsPermit IssuedSAT CONSTRUCTION SERVICES09/02/2026
DOB NOWStructuralPermit IssuedSAT CONSTRUCTION SERVICES09/01/2026
DOB NOWGeneral ConstructionPermit IssuedSAT CONSTRUCTION SERVICES07/02/2026
DOB NOWSupport of ExcavationPermit IssuedSAT CONSTRUCTION SERVICES06/30/2026
DOB NOWConstruction FencePermit IssuedSAT CONSTRUCTION SERVICES06/23/2026
DOB NOWFull DemolitionSigned-offSAT CONSTRUCTION SERVICES12/08/2025
DOB NOWConstruction FencePermit IssuedSAT CONSTRUCTION SERVICES11/25/2025
DOB NOWFull DemolitionSigned-offMORGAN SERVICES GROUP COR11/12/2025
DOB NOWSidewalk ShedSigned-offPARK CONTRACTING GROUP10/21/2025
DOB NOWConstruction FencePermit IssuedMORGAN SERVICES GROUP COR09/12/2025
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/13/2026Fail-Final CND-Occupancy InspectionFailView ↗
07/28/2026Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
05/22/2026Duct leakage testing, insulation and designYounes Abouyaalaenergy_progress
05/22/2026FinalNAVEEN KUMARprogress
05/22/2026Mechanical SystemsYounes Abouyaalaspecial
05/22/2026Maintenance informationYounes Abouyaalaenergy_progress
05/22/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
05/22/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/22/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/22/2026Shutoff dampersYounes Abouyaalaenergy_progress
05/06/2026Shutoff dampers—energy_progress
05/06/2026HVAC-R and service water heating system controls—energy_progress
05/06/2026HVAC-R and service water heating equipment—energy_progress
05/06/2026Mechanical Systems—special
05/06/2026Final—progress
05/06/2026Duct leakage testing, insulation and design—energy_progress
05/06/2026HVAC-R and service water piping design and insulation—energy_progress
05/06/2026Maintenance information—energy_progress
03/18/2026Maintenance informationYounes Abouyaalaenergy_progress
03/18/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
03/18/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
03/18/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
03/17/2026Sprinkler SystemsYounes Abouyaalaspecial
11/12/2025Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
11/12/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
11/12/2025Post-installed AnchorsYounes Abouyaalaspecial
11/12/2025MasonryYounes Abouyaalaspecial
Latest 25 of 51.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/21/2026B01244565-I1Contact architect ↗
08/21/2026B01244565-P1Contact architect ↗
08/20/2026B01244554-I1Contact architect ↗
Showing 3 of 14 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/16/2026B01259972-I1Open ↗
08/13/2026B01259972-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026B01259972-I1Open ↗
08/13/2026B01259972-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01259972-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/21/2026B01244565-P1Open ↗
08/21/2026B01244565-I1Open ↗
08/16/2026B01259972-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/27/2026B01259972-S1Open ↗
08/27/2026B01259972-I1Open ↗
08/27/2026B01259972-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026B01259972-S1Open ↗
08/27/2026B01259972-I1Open ↗
08/27/2026B01259972-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWWater Cut-Off1
08/13/2026B01244565-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01244565-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01244565-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01259972-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01244565-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist1
08/16/2026B01259972-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026B01259972-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01259972-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01244565-I1Open ↗
08/21/2026B01244565-P1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01244565-I1Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification3
08/21/2026B01244565-I1Open ↗
08/21/2026B01244565-P1Open ↗
08/16/2026B01259972-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026B01244565-P1Open ↗
08/13/2026B01244565-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/16/2026B01259972-I1Open ↗
08/13/2026B01259972-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01244565-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01259972-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B01259972-S3Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01244565-I1Open ↗