| Owner | Filings | Most Recent |
|---|---|---|
| 2GC OWNERS | 91 | 09/22/2026 |
| NRCF 2GC | 1,022 | 07/08/2026 |
| MACKLOWE MANAGEMENT | 148 | 03/22/2026 |
| TWO GRAND CENTRAL TOWER | 181 | 03/22/2026 |
| HARRY MACKLOWE RE CO | 1 | 03/22/2026 |
| HURRY ACKLOWE R.E. CO | 1 | 03/22/2026 |
| LEXINGTON HOTEL | 1 | 03/22/2026 |
| BOOTHBAY MANAGEMENT | 1 | 03/22/2026 |
| ROCKWOOD CAPITAL | 1 | 03/22/2026 |
| NUCOR CONSTRUCTION | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/04/2025 | $273.0M | — | NRCF 2GC LLC → 2GC OWNERS, LLC | $434/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| OSPINO ENGINEERING PLLC | 2 | 08/26/2026 |
| AMA CONSULTING ENGINEERS, PC | 69 | 08/20/2026 |
| FOGARTY FINGER ARCHITECTURE PLLC | 20 | 08/17/2026 |
| LATIMER SOMMERS & ASSOC | 15 | 07/30/2026 |
| ENV ARCHITECTS, DPC | 6 | 07/22/2026 |
| AZTEC ARCHITECTS, LLC | 8 | 06/03/2026 |
| SPECTORGROUP ARCHITECTURE LLP | 2 | 04/20/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 3 | 04/17/2026 |
| THORNTON TOMASETTI | 4 | 03/03/2026 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 04/21/2025 |
| LAURENCE G. JONES ARCHITECTS, PLLC | 1 | 01/27/2025 |
| TULLER/MCNEALUS/FELD | 1 | 09/09/2024 |
| PS ENGINEERS, INC. | 3 | 04/11/2024 |
| TPG ARCHITECTURE, LLP | 1 | 12/19/2023 |
| TOHFAZ UDDIN PE PC | 1 | 08/04/2023 |
| BAZINI ENGINEERING, P.C. | 1 | 08/19/2022 |
| KABACK ENTERPRISES | 1 | 05/19/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 89 | 03/21/2026 |
| PAUL FUSCO CONSULTING | 22 | 03/21/2026 |
| PS ENGINEERS | 8 | 03/21/2026 |
| HIERARCH-E | 2 | 03/21/2026 |
| DOMANI CONSULTING | 6 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 2 | 03/21/2026 |
| DYNAMIC BUILDING CONSULTANTS | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CORE FOUR CONSTRUCTION IN | General Contractor | 29 | 07/08/2026 |
| GANNON CONTRACTING LLC | General Contractor | 24 | 07/08/2026 |
| FOLOR INC | General Contractor | 19 | 09/22/2026 |
| A&A PLUMBING CORP | Plumbing | 7 | 07/08/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 6 | 03/21/2026 |
| PREMIER SANITATION LLC | General Contractor | 5 | 07/08/2026 |
| CM PLUMBING INC | Plumbing | 5 | 07/23/2026 |
| SOUND REFRIGERATION & AIR | General Contractor | 5 | 07/08/2026 |
| P & D MECHANICAL CORP | Fire Protection | 5 | 09/15/2026 |
| ICON INTERIORS INC | General Contractor | 4 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 4 | 07/08/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 4 | 07/14/2026 |
| BRIGGS SERVICES LLC | General Contractor | 4 | 09/03/2026 |
| F&S CONTRACTING GROUP INC | General Contractor | 3 | 03/21/2026 |
| SEAN COAKLEY P & H INC | Plumbing | 3 | 07/08/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 3 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 3 | 04/09/2026 |
| STANDARD FIRE SUPP CORP | Fire Protection | 3 | 07/08/2026 |
| TRIBUTE RESTORATION INC | General Contractor | 3 | 07/08/2026 |
| VAQUERO, RICHARD | Electrical | 2 | 03/21/2026 |
| THOMAS AKERMAN | Electrical | 2 | 03/21/2026 |
| LIBERTY PIPE INC | Fire Protection | 2 | 07/08/2026 |
| BEIL, SHELDON | Electrical | 2 | 03/21/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 2 | 07/08/2026 |
| BRENNAN OPERATING INC | General Contractor | 2 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CODEGREEN | 510 | 4 | 08/20/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 57 | 08/17/2026 |
| TWIG SPECIAL INSPECTIONS | 885 | 24 | 07/30/2026 |
| HOWARD L ZIMMERMAN ARCHIT | 1712 | 1 | 03/03/2026 |
| LAURENCE G. JONES ARCHITE | 5560 | 1 | 01/27/2025 |
| AR CONSULTING ENGINEER P. | 4054 | 3 | 04/11/2024 |
| CROSSCHECK INSPECTION SER | 544 | 1 | 07/26/2023 |
| SPECIAL INSPECTION SERVIC | 1200 | 19 | 09/01/2022 |
| BAZINI ENGINEERING, P.C. | 1808 | 1 | 08/19/2022 |
| STRACAR SPECIAL INSPECTIO | 229 | 1 | 04/22/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | FOLOR INC | 09/21/2026 |
| DOB NOW | Plumbing | Permit Issued | P & D MECHANICAL CORP | 09/14/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BRIGGS SERVICES LLC | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | BRIGGS SERVICES LLC | 09/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | K.M.D MECHANICAL 1443 LLC | 08/11/2026 |
| DOB NOW | General Construction | Permit Issued | FOLOR INC | 07/31/2026 |
| DOB NOW | Plumbing | Permit Issued | CM PLUMBING INC | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | CM PLUMBING INC | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | P & D MECHANICAL CORP | 07/20/2026 |
| DOB NOW | Sprinklers | Permit Issued | CM PLUMBING INC | 07/17/2026 |
| DOB NOW | Mechanical Systems | Signed-off | FOLOR INC | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | FOLOR INC | 07/15/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 07/13/2026 |
| DOB NOW | Plumbing | Permit Issued | P & D MECHANICAL CORP | 06/22/2026 |
| DOB NOW | General Construction | Signed-off | FOLOR INC | 06/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FOLOR INC | 06/08/2026 |
| DOB NOW | General Construction | Permit Issued | FOLOR INC | 06/08/2026 |
| DOB NOW | General Construction | Signed-off | FOLOR INC | 06/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | FOLOR INC | 06/03/2026 |
| DOB NOW | Plumbing | Permit Issued | P & D MECHANICAL CORP | 06/02/2026 |
| DOB NOW | General Construction | Permit Issued | PREMIER SANITATION LLC | 05/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | CM PLUMBING INC | 05/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | P & D MECHANICAL CORP | 04/24/2026 |
| DOB NOW | Plumbing | Permit Issued | CM PLUMBING INC | 04/23/2026 |
| DOB NOW | Mechanical Systems | Signed-off | FOLOR INC | 04/23/2026 |
| DOB NOW | General Construction | Permit Issued | FOLOR INC | 04/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FOLOR INC | 04/22/2026 |
| DOB NOW | General Construction | Permit Issued | FOLOR INC | 04/22/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 04/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | CEPRINE CONSTRUCTION INC | 04/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | CEPRINE CONSTRUCTION INC | 04/17/2026 |
| DOB NOW | Plumbing | Signed-off | BEDROCK MECHANICAL INC | 02/20/2026 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 02/20/2026 |
| DOB NOW | General Construction | Signed-off | FOLOR INC | 02/19/2026 |
| DOB NOW | General Construction | Signed-off | PREMIER SANITATION LLC | 02/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | FOLOR INC | 02/19/2026 |
| DOB NOW | General Construction | Permit Issued | PHARAOHS RESTORATION | 02/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | FOLOR INC | 02/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 02/10/2026 |
| DOB NOW | General Construction | Permit Issued | PREMIER SANITATION LLC | 02/04/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/16/2026 | Permit Issued | FOLOR INC | Heating and Air Conditioning Systems | Heat / Cool Trane GEHV036 1,140 CFM · Rooftop Unit ×1 |
| 06/04/2026 | Permit Issued | FOLOR INC | Others | Other Greenheck SP-A110 70 CFM · Exhaust Fan ×1 |
| 12/12/2025 | Signed-off | GANNON CONTRACTING LLC | Air Conditioning Systems | Cooling |
| 11/08/2024 | Signed-off | GANNON CONTRACTING LLC | Air Conditioning Systems | Cooling Above Air SCW-018S-7-000-00-00-00-RD 24,400 BTU · Fan Coil Indoor ×1 |
| 05/29/2024 | Permit Issued | GANNON CONTRACTING LLC | Others | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/30/2026 | Permit Issued | K.M.D MECHANICAL 1443 LLC | — |
| 07/22/2026 | — | — | — |
| 07/16/2026 | Permit Issued | CMP PIPING INC | — |
| 06/04/2026 | Permit Issued | CMP PIPING INC | 178 heads |
| 06/01/2026 | Permit Issued | CMP PIPING INC | 56 heads |
| 05/13/2026 | Permit Issued | CMP PIPING INC | 202 heads |
| 04/07/2026 | Permit Issued | CMP PIPING INC | — |
| 02/17/2026 | Signed-off | BEDROCK MECHANICAL INC | — |
| 02/03/2026 | — | — | — |
| 12/30/2025 | Signed-off | A&P REMODELING CO INC | 40 heads |
| 04/21/2025 | Signed-off | FULL CAPACITY FIRE CORP | — |
| 11/08/2024 | — | — | 8 heads |
| 01/13/2021 | Permit Issued | TOWER FIRE PROTECTION INC | — |
| 09/03/2019 | Signed-off | DENKO MECHANICAL INC | 66 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/16/2026 | Permit Issued | CM PLUMBING INC | Water/Sanitary |
| 06/04/2026 | Permit Issued | CM PLUMBING INC | Water/Sanitary |
| 06/01/2026 | Permit Issued | CM PLUMBING INC | Water/Sanitary |
| 05/13/2026 | Permit Issued | CM PLUMBING INC | Water/Sanitary |
| 04/07/2026 | Permit Issued | CM PLUMBING INC | Water/Sanitary |
| 02/17/2026 | Signed-off | BEDROCK PLBG. & HTG., INC | Water/Sanitary |
| 02/03/2026 | — | — | Water/Sanitary |
| 12/30/2025 | Signed-off | IMPACT PLUMBING INC | Water/Sanitary |
| 04/21/2025 | Signed-off | ARMON MECHANICAL INC | Water/Sanitary |
| 11/08/2024 | Signed-off | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 01/14/2021 | Signed-off | SEAN COAKLEY P & H INC | Water/Sanitary |
| 09/03/2019 | Signed-off | GEOFFREY A. LAGAS & ASSOC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | General Wiring |
| 09/22/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | General Wiring |
| 08/12/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 07/29/2026 | Complete | POLYHASE ELECL SOL INC | General Wiring |
| 07/29/2026 | Complete | POLYHASE ELECL SOL INC | General Wiring |
| 07/29/2026 | Complete | POLYHASE ELECL SOL INC | General Wiring |
| 05/20/2026 | Permit Issued | TOP NOTCH ELECTRIC INC | General Wiring |
| 04/14/2026 | Permit Issued | POLYHASE ELECL SOL INC | General Wiring |
| 04/14/2026 | Complete | POLYHASE ELECL SOL INC | General Wiring |
| 02/24/2026 | Complete | POLYHASE ELECL SOL INC | General Wiring |
| 02/12/2026 | Complete | POLYHASE ELECL SOL INC | General Wiring |
| 02/11/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 09/30/2025 | Complete | MIKOMA ELECTRIC LLC | General Wiring |
| 02/14/2025 | Complete | ON POINT ELECTRIC INC | — |
| 10/17/2024 | Complete | USIS ELECTRIC INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/13/2026 | Permit Issued | CMP PIPING INC | Concrete |
| 04/21/2025 | Signed-off | ARMON MECHANICAL INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2026 | Permit Issued | CEPRINE CONSTRUCTION INC | Scaffold |
| 04/16/2026 | Permit Issued | CEPRINE CONSTRUCTION INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/26/2026 | Permit Issued | PHARAOHS RESTORATION | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/27/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/25/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/19/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 07/16/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/10/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/20/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/26/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/20/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/28/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/05/2026 | Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test | Certified | View ↗ |
| 01/28/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/12/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/02/2026 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 12/17/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 11/06/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/04/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/20/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/27/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 08/27/2026 | Fire-Resistance Rated Construction | Christopher Drutjons | progress |
| 08/19/2026 | Metering | HATIM ELSAID | energy_progress |
| 08/19/2026 | HVAC-R and service water heating system controls | HATIM ELSAID | energy_progress |
| 08/19/2026 | Duct leakage testing, insulation and design | HATIM ELSAID | energy_progress |
| 08/19/2026 | Final | HATIM ELSAID | progress |
| 08/19/2026 | Interior lighting power | HATIM ELSAID | energy_progress |
| 08/19/2026 | Mechanical Systems | HATIM ELSAID | special |
| 08/19/2026 | Energy Code Compliance Inspections | HATIM ELSAID | progress |
| 08/19/2026 | HVAC-R and service water heating equipment | HATIM ELSAID | energy_progress |
| 08/19/2026 | Maintenance information | HATIM ELSAID | energy_progress |
| 08/19/2026 | Lighting controls | HATIM ELSAID | energy_progress |
| 08/19/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 08/19/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 08/13/2026 | Fire-Resistance Rated Construction | Christopher Drutjons | progress |
| 08/13/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Dave Wall | special |
| 07/21/2026 | Sprinkler Systems | Dave Wall | special |
| 07/21/2026 | Post-installed Anchors | Dave Wall | special |
| 07/16/2026 | Fire-Resistance Rated Construction | Christopher Drutjons | progress |
| 07/16/2026 | Lighting controls | Dave Wall | energy_progress |
| 07/16/2026 | Interior lighting power | Dave Wall | energy_progress |
| 07/16/2026 | Final | Dave Wall | progress |
| 07/16/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 07/14/2026 | Fire-Resistant Penetrations and Joints | Dave Wall | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Harrison Street Asset Management | Office | Floor 34 | Project M01431943 |
| Sovereign Partners | Office | Floor 40 | Project M01379209 |
| Rockwood | Office | Floors 6, 14, 25–27, 29, 32, 40, 41, 43 | Project M01326785 Project M01206129 Project M00979855 Project M01045072 Project M00686102 Project M00430765 Project M00229796 Project M00218004 |
| Global Foundries | Office | Floor 41 | Project M01313009 Project M00975794 |
| Pinnacle | Office | Floor 12 | Project M01074094 |
| Boothbay | Office | Floor 16 | Project M01063334 |
| Mesirow | Office | Floor 31 | Project M01032914 |