ECB06/11/2026Responding to an incident where a man lift operator fell while relocating the equipment with the platform elevated and overextended. Review of site records revealed the worker's site safety orientation was cond$5K due
ECB06/11/2026Responding to an incident where a worker fell approx. 25' from a man lift basket while relocating it with the platform elevated and overextended. The operator wasn't wearing a safety harness and wasn't tied off$2K due
ECB02/25/2025Failure to maintain building walls and appurtenances. Note: qewi filedamended safe #TR6-909211-9B-A1. At time of inspection, i observed broken glass(X2) at exposure(1) south elevation, and inadequate ac units sNothing owed — awaiting certificate of correction
ECB01/12/2023No DOB approved set(en drawing,com/check, architectural drawing) provided on job site at the time of inspection, provide approved /accepted construction documents; please go to https://WWW1.NYC.gov/site/buildinNothing owed — awaiting certificate of correction
ECB06/07/2022In response to above complaint observed chain link fence around the site with see-through fabric around contrary to BC3307.7.4 #4 that specifies that there shall be opaque sturdy cloth "windscreen" fabric at alNothing owed — awaiting certificate of correction
ECB04/11/202228-110.2 phase shifting site safety plan.at time of inspection on an 1STORY topped off NB under permit#322066367,it was observed ongoing construction operation.upon review of the site safety plan,it was observeNothing owed — awaiting certificate of correction
ECB09/28/2020Protection of pedestrians(warning signs,personnel & barriers). At the time of my inspection,i observed an approx 3" diameter water hose extending from across the street & traversing the pedestrian sidewalk at eNothing owed — awaiting certificate of correction
ECB09/28/2020Work contrary to construction documents(support of excavation). At the time of my inspection,i observed that the support of excavation(soe)for the utility lines at exp#3 was installed contrary to the drawingsNothing owed — awaiting certificate of correction
ECB09/28/2020Documents to be kept on site(DEP permit). At the time of my inspection,i observed an approx 3" diameter water hose extending from a fire hydrant across the street into the jobsite forthe use fo the installationNothing owed — awaiting certificate of correction
ECB08/17/2020@time of inspection, observed on going construction activities contrary to mayor's emergency executive ardex 120 & subsequent orders incorporating requirements of governor's executive order 202.34. And subsequeNothing owed — awaiting certificate of correction