← Back
Miscellaneous religious facility
147 WALTON STREET
BROOKLYN · BIN 3061329
💬 Discuss this project
1931Year Built
3Stories
M9Building Class
R6Zoning
4,500 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous religious facility · 1,666 sf lot · 2.7 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IGLESIA FUENTE DE VIDA, INC1003/22/2026
S & A BUILDING DEVELOP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRANKLYN ESTRELLA ARCHITECT PLLC301/17/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252201/17/2024
Building Lifecycle
All (35)Filed (3)Permit Issued (1)Signed Off (1)Violation (3)Inspection (4)Objection (4)Special Inspection (19)
02/26/2025
Signed off — Alteration
APPLICATION FILED TO RESPOND TO ECB VIOLATIONS #39095233Z AND 39095232R, TO CAP AND REMOVE EXISTING GAS BOILER WITH PIPING, REPLACE HWH WITH NEW, AND TO INSTALL NEW SLOP SINK ON SECOND FLOOR ALL AS PER PLANS FILED HEREWITH.
B00953136-I1
01/25/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
01/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/25/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
01/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
FRANKLYN ESTRELLA
01/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
FRANKLYN ESTRELLA
01/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANKLYN ESTRELLA
01/23/2024
Objection raised — Other
01/23/2024
Objection resolved — Addressed
01/17/2024
Filed — Alteration
APPLICATION FILED TO RESPOND TO ECB VIOLATIONS #39095233Z AND 39095232R, TO CAP AND REMOVE EXISTING GAS BOILER WITH PIPING, REPLACE HWH WITH NEW, AND TO INSTALL NEW SLOP SINK ON SECOND FLOOR ALL AS PER PLANS FILED HEREWITH.
B00953136-P1
01/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
INDARDEO PARBHUNATH
01/17/2024
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
01/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
FRANKLYN ESTRELLA
01/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
FRANKLYN ESTRELLA
01/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANKLYN ESTRELLA
01/16/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/27/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/21/2023
Filed — Alteration
INSTALLATION OF NEW SPLIT HVAC UNITS THROUGHOUT ENTIRE BUILDING FOR HEATING AND COOLING.
B00955114-I1
11/21/2023
Permit issued — Plumbing
B00953136-I1-PL
11/09/2023
Objection resolved — Addressed
10/31/2023
Objection raised — Other
10/30/2023
Special inspection requirement — Mechanical Systems
10/30/2023
Special inspection requirement — Final
10/30/2023
Special inspection requirement — Energy Code Compliance Inspections
FRANKLYN ESTRELLA
10/30/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FRANKLYN ESTRELLA
10/30/2023
Special inspection requirement — Duct leakage testing, insulation and design
FRANKLYN ESTRELLA
10/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
FRANKLYN ESTRELLA
10/30/2023
Special inspection requirement — HVAC-R and service water heating system controls
FRANKLYN ESTRELLA
10/25/2023
Filed — Alteration
APPLICATION FILED TO RESPOND TO ECB VIOLATIONS #39095233Z AND 39095232R, TO CAP AND REMOVE EXISTING GAS BOILER WITH PIPING, REPLACE HWH WITH NEW, AND TO INSTALL NEW SLOP SINK ON SECOND FLOOR ALL AS PER PLANS FILED HEREWITH.
B00953136-I1
09/19/2023
Violation issued (ECB, closed)
Construction
09/19/2023
Violation issued (ECB, closed)
Construction
01/02/2006
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/21/2023
BISOTISSUEDMC USA RESTORATION CORP05/08/2019
BISEQISSUEDS & A BUILDING DEVELOP05/24/2012
BISEQISSUEDEBEN-EZER CONSTRUCTION10/17/2002
BISOTISSUEDEBEN-EZER CONSTRUCTION10/17/2002
1 project · most recent 11/21/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/21/2023——Heating and Air Conditioning Systems
Heat / Cool
Ymgi WMMS-12EW-V2B(59)2 12,000 BTU · Fan Coil Indoor ×3
WMMS-60CH-V2B(59)2 60,000 BTU · Vrf Outdoor ×3
WMMS-24E-V2B(58)2 24,000 BTU · Fan Coil Indoor ×2
WMMS-09EW-V2B(59)2 9,000 BTU · Fan Coil Indoor ×1
WMMS-18EW-V2B(59)2 18,000 BTU · Vrf Outdoor ×1
Ducane 4HP16LT60P-3 60,000 BTU · Condensing Unit ×2
BCE3M60V00NA4X-2 60,000 BTU · Fan Coil Indoor ×1
BCE5C60MA4X-50 60,000 BTU · Fan Coil Indoor ×1
Midea MCHU-12AVH2 12,000 BTU · Condensing Unit ×1
MEHU-12AVH2 12,000 BTU · Fan Coil Indoor ×1
Kinghome KW18HQ2B8D1 18,000 BTU · Fan Coil Indoor ×1
1 project · most recent 06/12/2019
General Wiring
FiledStatusContractorScope
06/12/2019Permit IssuedLINPHILL ELEC'L CONTR.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/16/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/25/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
01/25/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
01/25/2024Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
01/25/2024HVAC-R and service water heating system controlsFRANKLYN ESTRELLAenergy_progress
01/25/2024HVAC-R and service water heating equipmentFRANKLYN ESTRELLAenergy_progress
01/25/2024HVAC-R and service water piping design and insulationFRANKLYN ESTRELLAenergy_progress
01/17/2024Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
01/17/2024Tenant Protection Plan ComplianceINDARDEO PARBHUNATHspecial
01/17/2024Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
01/17/2024HVAC-R and service water heating equipmentFRANKLYN ESTRELLAenergy_progress
01/17/2024HVAC-R and service water heating system controlsFRANKLYN ESTRELLAenergy_progress
01/17/2024HVAC-R and service water piping design and insulationFRANKLYN ESTRELLAenergy_progress
10/30/2023Mechanical Systems—special
10/30/2023Final—progress
10/30/2023Energy Code Compliance InspectionsFRANKLYN ESTRELLAprogress
10/30/2023HVAC-R and service water piping design and insulationFRANKLYN ESTRELLAenergy_progress
10/30/2023Duct leakage testing, insulation and designFRANKLYN ESTRELLAenergy_progress
10/30/2023HVAC-R and service water heating equipmentFRANKLYN ESTRELLAenergy_progress
10/30/2023HVAC-R and service water heating system controlsFRANKLYN ESTRELLAenergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00953136-I1Request digital key ↗
08/26/2026B00955114-I1Request digital key ↗
08/15/2026B00953136-P1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
05/14/2019321988079Open ↗
05/30/2012320483348Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
05/14/2019321988079Open ↗
05/30/2012320483348Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B00953136-I1Open ↗
09/02/2026B00953136-I1Open ↗
09/02/2026B00953136-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/16/2020321988079Open ↗
03/11/2020321988079Open ↗
05/14/2019321988079Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B00953136-I1Open ↗
09/02/2026B00953136-I1Open ↗
08/29/2026B00953136-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026B00953136-P1Open ↗
08/26/2026B00953136-I1Open ↗
08/13/2026B00955114-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/14/2019321988079Open ↗
06/12/2012320483348Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/14/2019321988079Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
05/14/2019321988079Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026B00953136-I1Open ↗
08/15/2026B00953136-P1Open ↗
08/13/2026B00955114-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/14/2019321988079Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/16/2020321988079Open ↗
03/11/2020321988079Open ↗
05/14/2019321988079Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/16/2020321988079Open ↗
03/11/2020321988079Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/16/2020321988079Open ↗
03/11/2020321988079Open ↗
07/22/2013320483348Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026B00953136-I1Open ↗
08/13/2026B00953136-P1Open ↗
08/13/2026B00955114-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/25/2012320483348Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/16/2020321988079Open ↗
03/11/2020321988079Open ↗
05/14/2019321988079Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
03/16/2020321988079Open ↗
11/20/2019321988079Open ↗
▸BISEFILING COVER SHEET2
05/14/2019321988079Open ↗
05/30/2012320483348Open ↗