← Back
Walk-up apt, over six families with stores
147 WEST 14 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1014517
💬 Discuss this project
1901Year Built
5Stories
C7Building Class
C6-2AZoning
8,200 sfGross Floor Area
18Units
Rent Stabilized10 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: PR 147 WEST 14 LLC · 2,077 sf lot · 3.95 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Floor 125p · 2 filings · 20 docs
Cellar22p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PR 147 WEST 14 LLC903/22/2026
PR 149 WEST 14603/21/2026
PR 147 W 14 ST LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/02/2017$5.5M—— → —$671/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ENGINEERING PC504/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ASA BARAK STUDIO503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HORSEPOWER ELECTRIC.&Electrical203/22/2026
QUALITY PIPING, INCFire Protection107/08/2026
T&D UNITED CONSTR CO, INCGeneral Contractor107/08/2026
EZ RUNER CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAN ENGINEERING, P.C.1291504/10/2025
ABA ARCHITECTURE8907307/15/2024
Building Lifecycle
All (60)Filed (5)Permit Issued (3)Signed Off (2)Violation (13)Inspection (7)Special Inspection (30)
06/12/2025
Signed off — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-I1
05/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/29/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/28/2025
Permit issued — Sprinklers
M00978498-I1-EW-SP
04/10/2025
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-P3
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
01/22/2025
Special inspection requirement — Sprinkler Systems
Roger Tan
01/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
01/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
01/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
12/31/2024
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-P2
11/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
11/15/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
11/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
11/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
11/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
11/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
11/11/2024
Signed off — Alteration
Installation of new HVAC and kitchen exhaust system serving new kitchen space encompassing cellar and first floor.
M00986876-I1
07/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2024
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-P1
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
07/11/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
07/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
ASA BARAK
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
07/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
07/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
05/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/28/2024
Permit issued — Plumbing
M00978498-I1-PL
03/06/2024
Permit issued — Mechanical Systems
M00986876-I1-MS
01/23/2024
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-I1
01/23/2024
Filed — Alteration
Installation of new HVAC and kitchen exhaust system serving new kitchen space encompassing cellar and first floor.
M00986876-I1
01/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
01/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
ASA BARAK
01/08/2024
Special inspection requirement — Mechanical Systems
Roger Tan
01/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
01/08/2024
Special inspection requirement — Final
Roger Tan
01/08/2024
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
01/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
01/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
01/08/2024
Special inspection requirement — Maintenance information
Roger Tan
02/21/2020
Violation issued (ECB, closed)
Construction
10/26/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/18/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/1992
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/26/1978
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offQUALITY PIPING, INC04/28/2025
DOB NOWPlumbingSigned-offEZ RUNER CONSTRUCTION COR03/28/2024
DOB NOWMechanical SystemsSigned-offT&D UNITED CONSTR CO, INC03/06/2024
BIS—ISSUEDT&D UNITED CONSTR CO, INC04/03/2024
BISOTISSUEDT&D UNITED CONSTR CO, INC03/06/2024
BIS—ISSUEDMICHAEL SLAVENCHINSKY INC.08/31/2023
BISOTISSUEDMICHAEL SLAVENCHINSKY INC.06/11/2019
BISOTISSUEDMICHAEL SLAVENCHINSKY INC.11/23/2018
6 projects · most recent 01/30/2025
General Wiring
FiledStatusContractorScope
01/30/2025CompleteICON ELECTRIC INCGeneral Wiring
05/07/2024Permit IssuedHORSEPOWER ELECTRIC.&5 meters, 3 new_meters
04/30/2019Permit IssuedHORSEPOWER ELECTRIC.&General Wiring
08/14/2018Permit IssuedHORSEPOWER ELECTRIC.&4 meters, 4 new_meters
07/26/2018Permit IssuedHORSEPOWER ELECTRIC.&4 meters, 1 new_meters
07/04/2018Permit IssuedHORSEPOWER ELECTRIC.&3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
07/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/22/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
01/22/2025Sprinkler SystemsRoger Tanspecial
01/22/2025Tenant Protection Plan Compliance—special
01/22/2025Energy Code Compliance InspectionsRoger Tanprogress
01/22/2025HVAC-R and service water heating system controlsRoger Tanenergy_progress
01/22/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
01/22/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
11/20/2024Tenant Protection Plan Compliance—special
11/15/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
11/15/2024Sprinkler SystemsRoger Tanspecial
11/15/2024Energy Code Compliance InspectionsRoger Tanprogress
11/15/2024HVAC-R and service water heating equipmentRoger Tanenergy_progress
11/15/2024HVAC-R and service water piping design and insulationRoger Tanenergy_progress
11/15/2024HVAC-R and service water heating system controlsRoger Tanenergy_progress
07/11/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
07/11/2024Sprinkler SystemsRoger Tanspecial
07/11/2024Tenant Protection Plan ComplianceASA BARAKspecial
07/11/2024Energy Code Compliance InspectionsRoger Tanprogress
07/11/2024HVAC-R and service water heating system controlsRoger Tanenergy_progress
07/11/2024HVAC-R and service water piping design and insulationRoger Tanenergy_progress
07/11/2024HVAC-R and service water heating equipmentRoger Tanenergy_progress
01/08/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
01/08/2024Tenant Protection Plan ComplianceASA BARAKspecial
01/08/2024Mechanical SystemsRoger Tanspecial
01/08/2024Energy Code Compliance InspectionsRoger Tanprogress
Latest 25 of 33.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026M00986876-I1Request digital key ↗
08/25/2026M00978498-I1Request digital key ↗
08/25/2026M00978498-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION18
10/02/2025140974499Open ↗
12/10/2024140974499Open ↗
12/09/2024140974499Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION6
04/03/2024140974499Open ↗
03/06/2024140974550Open ↗
08/31/2023140974499Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT II: CERTIFICATION1
12/27/2021140974499Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/27/2021140974499Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
12/27/2021140974499Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M00978498-P3Open ↗
09/02/2026M00978498-P3Open ↗
08/31/2026M00986876-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/20/2019123451736Open ↗
11/23/2018123451718Open ↗
11/23/2018123451709Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M00978498-P3Open ↗
08/31/2026M00986876-I1Open ↗
08/31/2026M00986876-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026M00986876-I1Open ↗
08/25/2026M00978498-I1Open ↗
08/25/2026M00978498-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/12/2021140974550Open ↗
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes5
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
04/23/2019123451736Open ↗
Showing 3 of 5 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST5
03/31/2022140974550Open ↗
02/11/2022140974499Open ↗
04/23/2019123451736Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist5
08/25/2026M00978498-I1Open ↗
08/25/2026M00978498-P2Open ↗
08/25/2026M00978498-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
12/27/2021140974499Open ↗
04/23/2019123451736Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/13/2024140974499Open ↗
03/06/2024140974550Open ↗
12/27/2021140974499Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026M00986876-I1Open ↗
08/25/2026M00978498-I1Open ↗
08/25/2026M00978498-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/20/2019123451736Open ↗
11/23/2018123451718Open ↗
11/23/2018123451709Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/05/2024140974550Open ↗
09/01/2023123451709Open ↗
12/27/2021140974499Open ↗
Showing 3 of 4 on file for this type
▸BISFENESTRATION AIR LEAKAGE2
07/23/2025140974550Open ↗
07/23/2025140974550Open ↗
▸BISFENESTRATION AREAS2
07/23/2025140974550Open ↗
07/23/2025140974550Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/23/2025140974550Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/23/2025140974550Open ↗
▸BISINTERIOR LIGHTING POWER1
07/23/2025140974550Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/08/2025140974550Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/23/2025140974550Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/23/2025140974550Open ↗
▸BISLIGHTING CONTROLS1
07/23/2025140974550Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/08/2024140974499Open ↗
09/01/2023123451709Open ↗
03/31/2022140974550Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/23/2025140974550Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/23/2025140974550Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/23/2025140974550Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE5
01/04/2024140974499Open ↗
01/04/2024140974499Open ↗
08/19/2021140974499Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER1
04/03/2024140974499Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/24/2025140974550Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
02/20/2019123451736Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/08/2025140974550Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION10
03/24/2025140974499Open ↗
02/05/2024140974550Open ↗
02/05/2024140974550Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM3
07/22/2019123451718Open ↗
07/22/2019123451709Open ↗
10/15/2018123451709Open ↗
▸BISEFILING COVER SHEET3
02/20/2019123451736Open ↗
09/07/2018123451709Open ↗
09/07/2018123451718Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM2
12/11/2024140974499Open ↗
02/20/2019123451736Open ↗
▸BISDHCR DOCUMENT1
12/27/2021140974499Open ↗