← Back
BuildNYC
Walk-up apt, over six families with stores
147 WEST 14TH STREET
MANHATTAN · BIN 1014517
💬 Discuss this project
1901Year Built
5Stories
C7Building Class
C6-2AZoning
8,200 sfGross Floor Area
18Units
Rent Stabilized0 Active Violations
Walk-up apt, over six families with stores · Owner of record: PR 147 West 14 · 2,077 sf lot · 3.95 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Chama Mama25p · 2 filings · 20 docs
CellarChama Mama22p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Chelsmore Apts1507/08/2026
PR 147 West 141503/22/2026
PR 147 W 14 St203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/02/2017$5.5M—— → —$671/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tan Engineering504/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Asa Barak Studio503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Horsepower ElectricElectrical203/22/2026
T&D United Construction CoGeneral Contractor107/08/2026
EZ Runer ConstructionPlumbing107/08/2026
Quality PipingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tan Engineering1291504/10/2025
Aba Architecture8907307/15/2024
Building Lifecycle
All (59)Filed (5)Permit Issued (3)Signed Off (2)Violation (12)Inspection (7)Special Inspection (30)
06/12/2025
Signed off — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-I1
05/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/29/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/28/2025
Permit issued — Sprinklers
M00978498-I1-EW-SP
04/10/2025
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-P3
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
01/22/2025
Special inspection requirement — Sprinkler Systems
Roger Tan
01/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
01/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
01/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
01/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
12/31/2024
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-P2
11/20/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
11/15/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
11/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
11/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
11/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
11/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
11/11/2024
Signed off — Alteration
Installation of new HVAC and kitchen exhaust system serving new kitchen space encompassing cellar and first floor.
M00986876-I1
07/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2024
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-P1
07/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
07/11/2024
Special inspection requirement — Sprinkler Systems
Roger Tan
07/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
ASA BARAK
07/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
07/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
07/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
05/22/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/22/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/28/2024
Permit issued — Plumbing
M00978498-I1-PL
03/06/2024
Permit issued — Mechanical Systems
M00986876-I1-MS
01/23/2024
Filed — Alteration
Installation of new plumbing and sprinkler system serving new kitchen space encompassing cellar and first floor.
M00978498-I1
01/23/2024
Filed — Alteration
Installation of new HVAC and kitchen exhaust system serving new kitchen space encompassing cellar and first floor.
M00986876-I1
01/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
01/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
ASA BARAK
01/08/2024
Special inspection requirement — Mechanical Systems
Roger Tan
01/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
01/08/2024
Special inspection requirement — Final
Roger Tan
01/08/2024
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
01/08/2024
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
01/08/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
01/08/2024
Special inspection requirement — Maintenance information
Roger Tan
02/21/2020
Violation issued (ECB, closed)
Construction
10/26/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
03/19/2003
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
09/16/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/18/1994
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/18/1993
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
04/11/1992
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offQuality Piping04/28/2025
DOB NOWPlumbingSigned-offEZ Runer Construction03/28/2024
DOB NOWMechanical SystemsSigned-offT&D United Construction Co03/06/2024
BIS—ISSUEDT&D United Construction Co04/03/2024
BISOTISSUEDT&D United Construction Co03/06/2024
BIS—ISSUEDMichael Slavenchinsky08/31/2023
BISOTISSUEDMichael Slavenchinsky06/11/2019
BISOTISSUEDMichael Slavenchinsky11/23/2018
6 projects · most recent 01/30/2025
General Wiring
FiledStatusContractorScope
01/30/2025CompleteIcon ElectricGeneral Wiring
05/07/2024Permit IssuedHorsepower Electric5 meters, 3 new_meters
04/30/2019Permit IssuedHorsepower ElectricGeneral Wiring
08/14/2018Permit IssuedHorsepower Electric4 meters, 4 new_meters
07/26/2018Permit IssuedHorsepower Electric4 meters, 1 new_meters
07/04/2018Permit IssuedHorsepower Electric3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/29/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
07/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/22/2025Fire-Resistant Penetrations and JointsRoger Tanspecial
01/22/2025Sprinkler SystemsRoger Tanspecial
01/22/2025Tenant Protection Plan Compliance—special
01/22/2025Energy Code Compliance InspectionsRoger Tanprogress
01/22/2025HVAC-R and service water heating system controlsRoger Tanenergy_progress
01/22/2025HVAC-R and service water heating equipmentRoger Tanenergy_progress
01/22/2025HVAC-R and service water piping design and insulationRoger Tanenergy_progress
11/20/2024Tenant Protection Plan Compliance—special
11/15/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
11/15/2024Sprinkler SystemsRoger Tanspecial
11/15/2024Energy Code Compliance InspectionsRoger Tanprogress
11/15/2024HVAC-R and service water heating equipmentRoger Tanenergy_progress
11/15/2024HVAC-R and service water piping design and insulationRoger Tanenergy_progress
11/15/2024HVAC-R and service water heating system controlsRoger Tanenergy_progress
07/11/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
07/11/2024Sprinkler SystemsRoger Tanspecial
07/11/2024Tenant Protection Plan ComplianceASA BARAKspecial
07/11/2024Energy Code Compliance InspectionsRoger Tanprogress
07/11/2024HVAC-R and service water heating system controlsRoger Tanenergy_progress
07/11/2024HVAC-R and service water piping design and insulationRoger Tanenergy_progress
07/11/2024HVAC-R and service water heating equipmentRoger Tanenergy_progress
01/08/2024Fire-Resistant Penetrations and JointsRoger Tanspecial
01/08/2024Tenant Protection Plan ComplianceASA BARAKspecial
01/08/2024Mechanical SystemsRoger Tanspecial
01/08/2024Energy Code Compliance InspectionsRoger Tanprogress
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Chama MamaRestaurant / Food ServiceCellar, Floor 1
Project M00978498 Alteration · LOC Issued · 01/23/2024
Project M00986876 Alteration · LOC Issued · 01/23/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 152 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026M00986876-I1Request digital key ↗
08/25/2026M00978498-I1Request digital key ↗
08/25/2026M00978498-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION18
10/02/2025140974499Open ↗
12/10/2024140974499Open ↗
12/09/2024140974499Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION6
04/03/2024140974499Open ↗
03/06/2024140974550Open ↗
08/31/2023140974499Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT II: CERTIFICATION1
12/27/2021140974499Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
12/27/2021140974499Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
12/27/2021140974499Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M00978498-P3Open ↗
09/02/2026M00978498-P3Open ↗
08/31/2026M00986876-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/20/2019123451736Open ↗
11/23/2018123451718Open ↗
11/23/2018123451709Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M00978498-P3Open ↗
08/31/2026M00986876-I1Open ↗
08/31/2026M00986876-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026M00986876-I1Open ↗
08/25/2026M00978498-I1Open ↗
08/25/2026M00978498-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/12/2021140974550Open ↗
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes5
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
04/23/2019123451736Open ↗
Showing 3 of 5 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST5
03/31/2022140974550Open ↗
02/11/2022140974499Open ↗
04/23/2019123451736Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist5
08/25/2026M00978498-I1Open ↗
08/25/2026M00978498-P2Open ↗
08/25/2026M00978498-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST2
12/27/2021140974499Open ↗
04/23/2019123451736Open ↗
▸Environmental & Asbestos12
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
12/13/2024140974499Open ↗
03/06/2024140974550Open ↗
12/27/2021140974499Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/28/2026M00986876-I1Open ↗
08/25/2026M00978498-I1Open ↗
08/25/2026M00978498-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
02/20/2019123451736Open ↗
11/23/2018123451718Open ↗
11/23/2018123451709Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
02/05/2024140974550Open ↗
09/01/2023123451709Open ↗
12/27/2021140974499Open ↗
Showing 3 of 4 on file for this type
▸BISFENESTRATION AIR LEAKAGE2
07/23/2025140974550Open ↗
07/23/2025140974550Open ↗
▸BISFENESTRATION AREAS2
07/23/2025140974550Open ↗
07/23/2025140974550Open ↗
▸BISEXTERIOR LIGHTING POWER1
07/23/2025140974550Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/23/2025140974550Open ↗
▸BISINTERIOR LIGHTING POWER1
07/23/2025140974550Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/08/2025140974550Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
07/23/2025140974550Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
07/23/2025140974550Open ↗
▸BISLIGHTING CONTROLS1
07/23/2025140974550Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/08/2024140974499Open ↗
09/01/2023123451709Open ↗
03/31/2022140974550Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
07/23/2025140974550Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/23/2025140974550Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/23/2025140974550Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE5
01/04/2024140974499Open ↗
01/04/2024140974499Open ↗
08/19/2021140974499Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER1
04/03/2024140974499Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/24/2025140974550Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
02/20/2019123451736Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/08/2025140974550Open ↗
▸Filing & Intake Forms18
▸BISADDITIONAL INFORMATION10
03/24/2025140974499Open ↗
02/05/2024140974550Open ↗
02/05/2024140974550Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM3
07/22/2019123451718Open ↗
07/22/2019123451709Open ↗
10/15/2018123451709Open ↗
▸BISEFILING COVER SHEET3
02/20/2019123451736Open ↗
09/07/2018123451709Open ↗
09/07/2018123451718Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/27/2021140974499Open ↗
01/12/2021140974550Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM2
12/11/2024140974499Open ↗
02/20/2019123451736Open ↗
▸BISDHCR DOCUMENT1
12/27/2021140974499Open ↗