← Back
Three families
1472 BAY RIDGE PARKWAY
BROOKLYN · BIN 3160065
💬 Discuss this project
1915Year Built
2.75Stories
C0Building Class
R4Zoning
2,624 sfGross Floor Area
3Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Three families · 4,000 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WCG SOLUTIONS310/27/2021
AVID DESIGNS, INC103/27/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A & D BUILDING SOLUTIONS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPADARO, STEPHENElectrical203/21/2026
Z.W. PLBG & HTG CORPPlumbing207/08/2026
MILLWRIGHT LOCAL 740Electrical203/21/2026
ARMAND MANCUSIElectrical203/21/2026
STEINWAY AWNING II, LLCElectrical203/21/2026
Z W PLBG HTGGeneral Contractor203/22/2026
MANCUSI ARMANDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WGC SOLUTIONS4673310/27/2021
Building Lifecycle
All (35)Filed (4)Permit Issued (1)Signed Off (1)Violation (17)Inspection (4)Special Inspection (8)
05/01/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
03/21/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, closed)
A
01/25/2022
Signed off — Alteration
REPLACING (3) BOILERS, (1) HOT WATER HEATER, AND GAS LINES FROM EXISTING GAS METERS TO BOILERS AND HOT WATER HEATER.
B00553864-I1
11/08/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2021
Special inspection requirement — High Temperature Hot Water Piping (Welding)
WAYNE CLARKE
11/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE CLARKE
11/03/2021
Special inspection requirement — Energy Code Compliance Inspections
WAYNE CLARKE
11/03/2021
Special inspection requirement — Maintenance information
WAYNE CLARKE
10/27/2021
Filed — Alteration
REPLACING (3) BOILERS, (1) HOT WATER HEATER, AND GAS LINES FROM EXISTING GAS METERS TO BOILERS AND HOT WATER HEATER.
B00553864-P2
10/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
WAYNE CLARKE
10/07/2021
Special inspection requirement — High Temperature Hot Water Piping (Welding)
WAYNE CLARKE
10/07/2021
Special inspection requirement — Energy Code Compliance Inspections
WAYNE CLARKE
10/07/2021
Special inspection requirement — Maintenance information
WAYNE CLARKE
09/01/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/27/2021
Filed — Alteration
REPLACING (3) BOILERS, (1) HOT WATER HEATER, AND GAS LINES FROM EXISTING GAS METERS TO BOILERS AND HOT WATER HEATER.
B00553864-P1
08/19/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/16/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/03/2021
Permit issued — Plumbing
B00553864-I1-PL
07/09/2021
Filed — Alteration
REPLACING (3) BOILERS, (1) HOT WATER HEATER, AND GAS LINES FROM EXISTING GAS METERS TO BOILERS AND HOT WATER HEATER.
B00553864-I1
04/06/2021
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
03/27/2020
Filed — Alteration
B00337188-I1
10/29/2019
Violation issued (HPD, closed)
I
10/15/2018
Violation issued (HPD, closed)
I
11/17/2017
Violation issued (HPD, closed)
I
11/03/2016
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
02/17/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZ.W. PLBG & HTG CORP08/03/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/01/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/16/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/03/2021High Temperature Hot Water Piping (Welding)WAYNE CLARKEspecial
11/03/2021Fire-Resistant Penetrations and JointsWAYNE CLARKEspecial
11/03/2021Energy Code Compliance InspectionsWAYNE CLARKEprogress
11/03/2021Maintenance informationWAYNE CLARKEenergy_progress
10/07/2021Fire-Resistant Penetrations and JointsWAYNE CLARKEspecial
10/07/2021High Temperature Hot Water Piping (Welding)WAYNE CLARKEspecial
10/07/2021Energy Code Compliance InspectionsWAYNE CLARKEprogress
10/07/2021Maintenance informationWAYNE CLARKEenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch3
09/01/2026B00553864-P1Request digital key ↗
09/01/2026B00553864-I1Request digital key ↗
09/01/2026B00553864-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00337188-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION4
04/22/2020320911377Open ↗
03/26/2020320911377Open ↗
02/27/2020320911377Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
09/26/2026B00553864-P2Open ↗
09/26/2026B00553864-P2Open ↗
08/28/2026B00553864-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00553864-P2Open ↗
09/01/2026B00553864-P1Open ↗
09/01/2026B00553864-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/26/2026B00553864-P2Open ↗
08/28/2026B00553864-I1Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
05/02/2018320911377Open ↗
▸BISSTREET TREE CHECKLIST1
05/02/2018320911377Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00553864-P1Open ↗
09/01/2026B00553864-I1Open ↗
09/01/2026B00553864-P2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/24/2020320911377Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/02/2018320911377Open ↗
03/16/2018320911377Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00553864-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/16/2018320911377Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE2
03/26/2020320911377Open ↗
05/18/2018320911377Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/02/2018320911377Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION11
10/28/2020320911377Open ↗
04/22/2020320911377Open ↗
04/22/2020320911377Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM1
03/26/2020320911377Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
05/02/2018320911377Open ↗