Roof2p · 1 filing · 5 docs
ArchitectureGeneral
Local Law 11 facade repairs
On file for this job
5 documents · 2 drawing sheets
Bulkhead3p · 2 filings · 17 docs
ArchitectureMechanical
Connect to existing EA duct work. New VAVs and associated duct work.
On file for this job
14 documents · 2 drawing sheets
interior demolition and general construction on construction floors 30-32 (marketing floors 31-33)
On file for this job
3 documents · 1 drawing sheet
Floor 584p · 2 filings · 8 docs
ArchitectureFire Protection
general construction for tiktok space on construction floors 46,47 (marketing floors 57,58)
On file for this job
2 documents · 3 drawing sheets
sprinkler work on construction floors 46,47 (marketing floors 57,58)
On file for this job
6 documents · 1 drawing sheet
Floor 578p · 2 filings · 8 docs
ArchitectureFire Protection
general construction for tiktok space on construction floors 46,47 (marketing floors 57,58)
On file for this job
2 documents · 7 drawing sheets
sprinkler work on construction floors 46,47 (marketing floors 57,58)
On file for this job
6 documents · 1 drawing sheet
Floor 562p · 1 filing · 2 docs
Architecture
GENERAL CONSTRUCTION ON CONSTRUCTION FLOORS 43,44 & 45 (MARKETING FLOORS 54,55,56)
On file for this job
2 documents · 2 drawing sheets
Floor 551p · 1 filing · 2 docs
Architecture
GENERAL CONSTRUCTION ON CONSTRUCTION FLOORS 43,44 & 45 (MARKETING FLOORS 54,55,56)
On file for this job
2 documents · 1 drawing sheet
Floor 549p · 1 filing · 2 docs
Architecture
GENERAL CONSTRUCTION ON CONSTRUCTION FLOORS 43,44 & 45 (MARKETING FLOORS 54,55,56)
On file for this job
2 documents · 9 drawing sheets
Floor 53
Floor 52
Floor 51
Floor 50
Floor 494p · 2 filings · 12 docs
Fire ProtectionPlumbing
plumbing work during installation of emergency generators
On file for this job
5 documents · 3 drawing sheets
sprinkler work for Bank of Montreal space on construction floors 9, 31 & 48 (marketing 9, 32 & 49)
On file for this job
7 documents · 1 drawing sheet
Floor 486p · 2 filings · 7 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
2 documents
Floor 4726p · 12 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Sprinklers · Structural
general construction for tiktok space on construction floors 46,47 (marketing floors 57,58)
On file for this job
2 documents · 6 drawing sheets
mechanical work on floors 46,47 (marketing floors 57,58)
On file for this job
8 documents · 2 drawing sheets
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4623p · 10 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
general construction for tiktok space on construction floors 46,47 (marketing floors 57,58)
On file for this job
2 documents · 5 drawing sheets
plumbing work on construction floors 43,44,45 (marketing floors 54,55,56)
On file for this job
2 documents · 1 drawing sheet
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4520p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
GENERAL CONSTRUCTION ON CONSTRUCTION FLOORS 43,44 & 45 (MARKETING FLOORS 54,55,56)
On file for this job
2 documents · 4 drawing sheets
mechanical work on construction floors 43,44,45 (marketing floors 54,55,56)
On file for this job
8 documents · 2 drawing sheets
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4420p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
GENERAL CONSTRUCTION ON CONSTRUCTION FLOORS 43,44 & 45 (MARKETING FLOORS 54,55,56)
On file for this job
2 documents · 4 drawing sheets
mechanical work on construction floors 43,44,45 (marketing floors 54,55,56)
On file for this job
8 documents · 2 drawing sheets
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4320p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
GENERAL CONSTRUCTION ON CONSTRUCTION FLOORS 43,44 & 45 (MARKETING FLOORS 54,55,56)
On file for this job
2 documents · 5 drawing sheets
mechanical work on construction floors 43,44,45 (marketing floors 54,55,56)
On file for this job
8 documents · 2 drawing sheets
plumbing work on construction floors 43,44,45 (marketing floors 54,55,56)
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4276p · 13 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
general construction for Varagon space on 42nd floor construction (53rd floor marketing)
On file for this job
4 documents · 1 drawing sheet
mechanical work for Varagon space on 42nd floor construction (53rd floor marketing)
On file for this job
5 documents
plumbing work on construction floors 43,44,45 (marketing floors 54,55,56)
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4114p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Filing herewith interior demolition and renovation as per plans filed herewith. Marketing FL: Cellar, 48 to 52, Construction FL: Cellar, 37 to 41. No change to use, egress or occupancy.
On file for this job
19 documents · 1 drawing sheet
Filing herewith mechanical work as per plans filed herewith. Marketing FL: Cellar, 48 to 52, Construction FL: Cellar, 37 to 41. No change to use, egress or occupancy.
On file for this job
21 documents · 1 drawing sheet
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 4013p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Filing herewith mechanical work as per plans filed herewith. Marketing FL: Cellar, 48 to 52, Construction FL: Cellar, 37 to 41. No change to use, egress or occupancy.
On file for this job
21 documents · 1 drawing sheet
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Remove all fixtures and equipment from tenant space. Remove piping back to base building risers.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 3912p · 6 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
General construction for Shenkman Capital on constuction floor 28 (marketing floor 29)
On file for this job
6 documents · 1 drawing sheet
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 1 drawing sheet
Remove all fixtures and equipment from tenant space. Remove piping back to base building risers.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 3842p · 12 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers · Structural
Sprinkler work for restroom upgrades.
On file for this job
6 documents · 1 drawing sheet
Filing herewith interior demolition and renovation as per plans filed herewith. Marketing FL: Cellar, 48 to 52, Construction FL: Cellar, 37 to 41. No change to use, egress or occupancy.
On file for this job
19 documents · 1 drawing sheet
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3715p · 9 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Sprinkler work for restroom upgrades.
On file for this job
6 documents · 1 drawing sheet
Filing herewith mechanical work as per plans filed herewith. Marketing FL: Cellar, 48 to 52, Construction FL: Cellar, 37 to 41. No change to use, egress or occupancy.
On file for this job
21 documents · 1 drawing sheet
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3646p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers · Structural
Sprinkler work for restroom upgrades.
On file for this job
6 documents · 1 drawing sheet
(CHICAGO TRADING COMPANY) -FILING HERREWITH FOR NON STRUCTURAL DEMO AND INTEROR RENOVATION OF OFFICE SPACE. WORK TO INCLUDE GENERAL CONSTRUCTION AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents · 2 drawing sheets
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3518p · 10 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
(Chicago Trading Company) Filing herewith mechanical plans indicating mechanical ductwork and installation of HVAC Unit as shown on plans. There will be no change of use, occupancy or egress under this application.
On file for this job
4 documents · 2 drawing sheets
(CHICAGO TRADING COMPANY) -FILING HERREWITH FOR NON STRUCTURAL DEMO AND INTEROR RENOVATION OF OFFICE SPACE. WORK TO INCLUDE GENERAL CONSTRUCTION AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
5 documents · 1 drawing sheet
(CHICAGO TRADING COMPANY) FILIG HEREWITH PLUMBING PLANS TO INDICATE PLUMBING WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3413p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
(CHICAGO TRADING COMPANY) FILIG HEREWITH PLUMBING PLANS TO INDICATE PLUMBING WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
4 documents · 1 drawing sheet
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Remove all ductwork, diffusers, piping, ac units back to point of disconnect during interior interior demolition on constructions floors 33-37 (marketing floors 34-38)
On file for this job
6 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 3332p · 13 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Remove all sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
plumbing work for Bank of Montreal space on construction floors 30,31,32 (marketing floors 31,32,33)
On file for this job
2 documents · 2 drawing sheets
Remove all ductwork, diffusers, piping, ac units back to point of disconnect during interior interior demolition on constructions floors 33-37 (marketing floors 34-38)
On file for this job
6 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3250p · 15 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
sprinkler work for Bank of Montreal space on construction floors 9, 31 & 48 (marketing 9, 32 & 49)
On file for this job
7 documents · 1 drawing sheet
Plumbing work for Bank of Montreal space on construction floors 9 & 31 (marketing 9 & 32)
On file for this job
24 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3125p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
interior demolition and general construction on construction floors 30-32 (marketing floors 31-33)
On file for this job
3 documents · 6 drawing sheets
mechanical work on construction floors 30,31,32 (marketing floors 31,32,33)
On file for this job
24 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3013p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
plumbing work for Bank of Montreal space on construction floors 30,31,32 (marketing floors 31,32,33)
On file for this job
2 documents · 1 drawing sheet
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
remove all ductwork, diffusers, piping, ac units back to point of disconnect during interior demolition on construction floors 28-32 (marketing 29-33)
On file for this job
3 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 2922p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work for Shenkman Capital on construction floor 28 (marketing floor 29)
On file for this job
10 documents · 1 drawing sheet
standpipe work to add one new fire hose cabinet for Shenkman Capital on construction floor 28 (marketing floor 29)
On file for this job
2 documents · 1 drawing sheet
General construction for Shenkman Capital on constuction floor 28 (marketing floor 29)
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2816p · 9 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
plumbing work for Shenkman Capital on construction floor 28 (marketing floor 29)
On file for this job
2 documents · 1 drawing sheet
Install plumbing fixtures in restroom.
On file for this job
3 documents · 1 drawing sheet
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
Latest 3 of 8 filings on this floor.
Floor 2716p · 9 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Install plumbing fixtures in restroom.
On file for this job
3 documents · 1 drawing sheet
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
Fitout of 3 floors at 151 W 42nd St. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2618p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Install plumbing fixtures in restroom.
On file for this job
3 documents · 1 drawing sheet
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
Fitout of 3 floors at 151 W 42nd St. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2513p · 7 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
Fitout of 3 floors at 151 W 42nd St. No change in use, egress or occupancy.
On file for this job
13 documents · 1 drawing sheet
Fit out 3 floors at 151 W42nd st, including addition of several bathrooms, showers, pantry and lounge fixtures, etc. No change in use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 247p · 3 filings · 13 docs
Fire ProtectionMechanicalStructural
Issued Permit Scope
Sprinklers · Structural
Remove all ductwork, diffusers, piping, ac units back to point of disconnect during interior demolition on construction floors sub, cel, 1,3 & 23 (Marketing c-1, c-2, 1, 3 & 24)
On file for this job
6 documents · 1 drawing sheet
sprinkler work during phase II installation of new shaft and riserbank. interior work only.
On file for this job
5 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
2 documents
Floor 2315p · 7 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
mechanical work for tenant space Vidaris on 23rd floor construction (24th floor marketing)
On file for this job
3 documents · 2 drawing sheets
plumbing work for tenant space Vidaris on 23rd floor construction (24th floor marketing)
On file for this job
2 documents · 2 drawing sheets
Remove sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 223p · 2 filings · 14 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
4 documents
Floor 218p · 6 filings · 20 docs
Fire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Sprinklers · Structural
mechanical work for TikTok space on construction floor 20 (marketing floor 21)
On file for this job
3 documents · 1 drawing sheet
general construction for TikTok space on construction floor 20 (marketing floor 21)
On file for this job
4 documents · 1 drawing sheet
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
Latest 3 of 6 filings on this floor.
Floor 2011p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work for TikTok space on construction floor 20 (marketing floor 21)
On file for this job
3 documents · 2 drawing sheets
Minor partition demolition and construction work and change to occupant load on construction floor 20 (marketing floor 21)
On file for this job
3 documents · 4 drawing sheets
general construction for TikTok space on construction floor 20 (marketing floor 21)
On file for this job
4 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 193p · 2 filings · 14 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
4 documents
Floor 183p · 2 filings · 14 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
4 documents
Floor 1731p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
FILING HEREWITH PLANS FOR GENERAL CONSTRUCTION WORK AND REMOVAL OF PA SPACE ON THE 36TH FLOOR ON C OF O. INCREASING NUMBER OF PEOPLE. FLOOR WILL BE OFFICES ONLY - NO PA SPACE. THERE WILL BE NO CHANE IN EGRESS UNDER THIS APPLICATION.
On file for this job
15 documents
Replace HVAC unit for the 17th floor IT room. No change in use egress and occupancy.
On file for this job
9 documents
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
Latest 3 of 4 filings on this floor.
Floor 169p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
Plumbing work for TikTok space on 15th floor construction (16th floor marketing)
On file for this job
3 documents · 2 drawing sheets
sprinkler work for TikTok space on 15th floor construction (16th floor marketing)
On file for this job
2 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1513p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
General construction for BMO on marketing floors 15 & 33 (construction floors 14 & 32)
On file for this job
2 documents · 2 drawing sheets
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
mechanical work during phase I Installation of new shaft and riserbank. interior work only.
On file for this job
11 documents
Latest 3 of 4 filings on this floor.
Floor 1421p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
sprinkler work for Roivant CEO suite on 13th floor construction (14th floor marketing)
On file for this job
3 documents · 1 drawing sheet
general construction for Roivant CEO suite on 13th floor construction (14th floor marketing)
On file for this job
2 documents · 7 drawing sheets
mechanical work for Roivant CEO suite on 13th floor construction (14th floor marketing)
On file for this job
6 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 133p · 2 filings · 14 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
4 documents
Floor 12Under Construction55p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Propose interior renovation of existing commercial space at 011 floor. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
On file for this job
14 documents
plumbing work for office fit out for Cumming Group on 12th floor
On file for this job
2 documents
Sprinkler work for office fit out for Cumming Group on 12th floor
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 11Under Construction38p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Propose interior renovation of existing commercial space at 011 floor. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
On file for this job
14 documents · 4 drawing sheets
REMOVE EXISTING STAIR BETWEEN THE 12TH AND 11TH FLOORS. SLAB OVER OPENING. REMOVE EXISTING STADIUM PLATFORM ON 11TH FLOOR. INSTALL NEW RAISED FLOOR WHERE STAIR / PLATFORM IS REMOVED AND NEW FLOOR INFILL.
On file for this job
17 documents · 5 drawing sheets
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
Latest 3 of 4 filings on this floor.
Floor 105p · 3 filings · 17 docs
ArchitectureFire ProtectionStructural
Issued Permit Scope
General Construction · Sprinklers · Structural
Temporary platform for NYE Broadcast on the terrace. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this job
3 documents
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
4 documents
Floor 913p · 7 filings · 20 docs
DMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Mechanical work for Bank of Montreal on 9th floor
On file for this job
5 documents · 1 drawing sheet
Sprinkler work for Bank of Montreal on 9th floor
On file for this job
2 documents · 1 drawing sheet
Alteration of existing sprinkler system to accommodate new architecture layout on 9th floor
On file for this job
2 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 816p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
General construction for Rabobank on 8th floor
On file for this job
2 documents · 6 drawing sheets
Plumbing work for Rabobank on 8th floor
On file for this job
4 documents · 2 drawing sheets
Sprinkler work for Rabobank on 8th floor
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 73p · 2 filings · 14 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
4 documents
Floor 63p · 2 filings · 14 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
structural floor reinforcement to accommodate new vertical electrical risers. Steel framing is utilized for the modifications.
On file for this job
4 documents
Floor 515p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers · Structural
Filing herewith plumbing work as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
15 documents · 3 drawing sheets
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.
On file for this job
13 documents · 9 drawing sheets
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
Latest 3 of 4 filings on this floor.
Floor 47p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
Sprinklers · Structural
Structural work for H&M Store US0400 for support of mechanical equipment platforms, new opening in mezzanine/demo portion of mezzanine. Floor infill over existing stair to be demoed.
On file for this job
4 documents · 1 drawing sheet
interior demo and construction on 4th floor to create space for ATM machine
On file for this job
5 documents · 2 drawing sheets
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
Latest 3 of 5 filings on this floor.
Floor 335p · 17 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
Remove sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Remove all ductwork, diffusers, piping, ac units back to point of disconnect during interior demolition on construction floors sub, cel, 1,3 & 23 (Marketing c-1, c-2, 1, 3 & 24)
On file for this job
6 documents · 2 drawing sheets
sprinkler work during phase I installation of new shaft and riserbank. interior work only.
On file for this job
10 documents
Latest 3 of 8 filings on this floor.
Floor 234p · 14 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Structural
removal of all plumbing fixtures in employee breakrooms and toilet rooms
On file for this job
2 documents · 1 drawing sheet
non-structural interior demolition for H&M Store US0400
On file for this job
2 documents · 2 drawing sheets
Mechanical work to include removal of all existing HVAC systems, ductwork and piping during interior demolition for H&M Store US0400
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 170p · 16 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Minor partition demolition and construction work and change to occupant load on construction floor 20 (marketing floor 21)
On file for this job
3 documents
Remove sprinkler heads and branch piping. Install temporary core sprinkler loop.
On file for this job
5 documents · 2 drawing sheets
Remove all ductwork, diffusers, piping, ac units back to point of disconnect during interior demolition on construction floors sub, cel, 1,3 & 23 (Marketing c-1, c-2, 1, 3 & 24)
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine7p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Standpipe work for interior fitout of H&M Store US0400
On file for this job
8 documents · 3 drawing sheets
Plumbing work for interior fitout of H&M Store US0400
On file for this job
6 documents · 1 drawing sheet
General construction for interior fitout of H&M Store US0400
On file for this job
10 documents · 3 drawing sheets
Cellar59p · 13 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Structural
Filing herewith interior demolition and renovation as per plans filed herewith. Marketing FL: Cellar, 48 to 52, Construction FL: Cellar, 37 to 41. No change to use, egress or occupancy.
On file for this job
19 documents · 6 drawing sheets
Filing herewith mechanical work as per plans filed herewith. Marketing FL: Cellar, 48 to 52, Construction FL: Cellar, 37 to 41. No change to use, egress or occupancy.
On file for this job
21 documents · 2 drawing sheets
Interior office fit out as shown on the plans
On file for this job
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-Cellar56p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Sprinklers
sprinkler work during installation of emergency generators
On file for this job
11 documents · 2 drawing sheets
Minor partition demolition and construction work and change to occupant load on construction floor 20 (marketing floor 21)
On file for this job
3 documents
plumbing work for addition of a new unisex bathroom containing a water closet / lavatory and new pantry sink with dishwasher and coffee machine for Bank of Montreal space in subcellar.
On file for this job
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.