← Back
Multi-story retail building (2+)
1473 FLATBUSH AVENUE
BROOKLYN · Flatbush · BIN 3121671
💬 Discuss this project
1933Year Built
2Stories
K2Building Class
R7AZoning
5,790 sfGross Floor Area
1Units
7 Open Violations ▸FDNY Report ↗
Multi-story retail building (2+) · 4,982 sf lot · 1.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 1 filing · 10 docs
Floor 16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RWREALESTATEGROUP807/08/2026
PLATINUM SERVICES NY507/08/2026
CLEAN RITE CENTERS-FLATBUSH AVE2203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHON ENGINEERING408/22/2022
ASHRAF CORP105/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TREND 21 MANAGEMENT INCGeneral Contractor407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
AVON PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHON ENGINEERING PC2454408/22/2022
Building Lifecycle
All (37)Filed (5)Permit Issued (4)Signed Off (2)Violation (12)Special Inspection (14)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/09/2022
Signed off — Alteration
EXTEND EXISTING CONCRETE PAD FOR WASHERS / REPLACE FLOOR & CEILING TILES IF DAMAGED/ REPAIR EXISTING ROOFING IF DAMAGED / INSTALL TWO HVAC UNITS
B00606775-I1
11/05/2022
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00736539-I1
08/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steve Chon
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
08/24/2022
Special inspection requirement — Mechanical Systems
Steve Chon
08/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
08/24/2022
Special inspection requirement — Fire-Resistance Rated Construction
Steve Chon
08/24/2022
Special inspection requirement — Final
Steve Chon
08/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steve Chon
08/22/2022
Filed — Alteration
EXTEND EXISTING CONCRETE PAD FOR WASHERS / REPLACE FLOOR & CEILING TILES IF DAMAGED/ REPAIR EXISTING ROOFING IF DAMAGED / INSTALL TWO HVAC UNITS
B00606775-P1
08/22/2022
Filed — Alteration
REPLACEMENT OF WASHERS & DRYERS / GAS PIPING CONNECTION TO HVAC
B00606850-P1
08/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
08/11/2022
Special inspection requirement — Mechanical Systems
Steve Chon
08/11/2022
Special inspection requirement — Final
Steve Chon
08/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
Steve Chon
08/11/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steve Chon
08/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steve Chon
07/28/2022
Permit issued — Mechanical Systems
B00606775-I1-GC
07/28/2022
Permit issued — General Construction
B00606775-I1-MS
07/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steve Chon
05/26/2022
Permit issued — Sidewalk Shed
B00736539-I1-SH
05/25/2022
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00736539-I1
10/13/2021
Permit issued — Plumbing
B00606850-I1-PL
10/12/2021
Filed — Alteration
EXTEND EXISTING CONCRETE PAD FOR WASHERS / REPLACE FLOOR & CEILING TILES IF DAMAGED/ REPAIR EXISTING ROOFING IF DAMAGED / INSTALL TWO HVAC UNITS
B00606775-I1
10/12/2021
Filed — Alteration
REPLACEMENT OF WASHERS & DRYERS / GAS PIPING CONNECTION TO HVAC
B00606850-I1
08/08/2013
Violation issued (FDNY_NOV, closed)
08/06/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/06/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/14/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTREND 21 MANAGEMENT INC07/28/2022
DOB NOWGeneral ConstructionSigned-offTREND 21 MANAGEMENT INC07/28/2022
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC05/26/2022
DOB NOWPlumbingPermit IssuedAVON PLBG & HTG INC10/13/2021
BISMHISSUEDJD MASTERS PLUMBING & HEA03/03/2017
BISMHISSUEDJD MASTERS PLUMBING & HEA06/23/2016
BISPLISSUEDJD MASTERS PLBG & HTG06/23/2016
BISOTISSUEDNEW YORK SIGN CITY INC12/21/2001
BISPLISSUEDJD MASTERS PLBG & HTG11/12/1998
BIS—ISSUEDB.O.S.S. ASSOCIATES, INC09/23/1998
1 project · most recent 08/22/2022
Gas Water/Sanitary
FiledStatusContractorScope
08/22/2022Permit IssuedAVON PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 05/17/2022
General Wiring
FiledStatusContractorScope
05/17/2022CompleteILLUMINOUS ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/24/2022HVAC-R and service water heating system controlsSteve Chonenergy_progress
08/24/2022Fire-Resistant Penetrations and JointsSteve Chonspecial
08/24/2022Mechanical SystemsSteve Chonspecial
08/24/2022Fire-Resistant Penetrations and JointsSteve Chonspecial
08/24/2022Fire-Resistance Rated ConstructionSteve Chonprogress
08/24/2022FinalSteve Chonprogress
08/24/2022HVAC-R and service water heating equipmentSteve Chonenergy_progress
08/11/2022Fire-Resistant Penetrations and JointsSteve Chonspecial
08/11/2022Mechanical SystemsSteve Chonspecial
08/11/2022FinalSteve Chonprogress
08/11/2022Fire-Resistance Rated ConstructionSteve Chonprogress
08/11/2022HVAC-R and service water heating system controlsSteve Chonenergy_progress
08/11/2022HVAC-R and service water heating equipmentSteve Chonenergy_progress
07/20/2022Fire-Resistant Penetrations and JointsSteve Chonspecial
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00606775-I1Request digital key ↗
09/01/2026B00606775-P1Request digital key ↗
08/29/2026B00736539-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
03/03/2017321406251Open ↗
06/23/2016321406251Open ↗
06/23/2016321406251Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/21/2016321406251Open ↗
03/05/2012320442703Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00606775-P1Open ↗
09/01/2026B00606775-P1Open ↗
09/01/2026B00606775-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00606850-P1Open ↗
09/01/2026B00606775-P1Open ↗
09/01/2026B00606775-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00606775-I1Open ↗
09/01/2026B00606775-P1Open ↗
08/28/2026B00606850-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/04/2017321406251Open ↗
06/21/2016321406251Open ↗
03/05/2012320442703Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/21/2016321406251Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
03/05/2012320442703Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/21/2016321406251Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00606775-P1Open ↗
09/01/2026B00606775-I1Open ↗
08/28/2026B00606850-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice to Proceed2
08/13/2026B00606775-I1Open ↗
08/13/2026B00606850-I1Open ↗
▸DOB NOWOER: Notice of Satisfaction2
08/13/2026B00606775-I1Open ↗
08/13/2026B00606850-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/21/2016321406251Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/05/2012320442703Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/04/2017321406251Open ↗
06/21/2016321406251Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/04/2017321406251Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/05/2012320442703Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00606775-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/04/2017321406251Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/05/2012320442703Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/04/2017321406251Open ↗
06/21/2016321406251Open ↗
03/05/2012320442703Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
06/21/2016321406251Open ↗
03/05/2012320442703Open ↗
▸BISBOROUGH INTAKE FORM1
10/04/2017321406251Open ↗
▸Other Documents1
▸BISENVIRONMENTAL(E) DEP NOTICE TO PROCEED1
05/21/2012320442703Open ↗