← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
The New Yorker Condominium
1474 3 AVENUE · BIN 1047653
💬 Discuss this project
1981Year Built
17Stories
RMBuilding Class
C1-9Zoning
54,704 sfGross Floor Area
34Units
LL97 CoveredRent Stabilized9 Open Violations 7 unresolved · 2 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 5,619 sf lot · 9.74 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
7 jobs · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026Permit IssuedOM ELECTRIC, INCGeneral Wiring
02/12/2025CompleteLINA ELECTRIC, CORPGeneral Wiring
11/14/2023CompleteHIGH QUALITY ELECTRIC OF—
06/13/2022CompleteXELA ELECTRICAL CORPGeneral Wiring
05/02/2022CompleteLINA ELECTRIC, CORP—
04/20/2022Permit IssuedUL ELECTRICAL CORP.General Wiring
10/01/2019CompleteLINA ELECTRIC, CORP.General Wiring
Building Lifecycle
All (120)Filed (7)Permit Issued (13)Signed Off (5)Facade (FISP) (15)Violation (50)Inspection (3)Objection (10)Special Inspection (17)
10/01/2025
Signed off — Alteration
M00958472-I1
08/04/2025
Signed off — Alteration
INSTALLATION OF OUTRIGGER BEAMS/MATERIAL HOIST TO PERFORM FACADE REPAIRS AND INSPECTIONS.
M01094054-I1
07/21/2025
Signed off — Alteration
M00963951-I1
07/16/2025
Cycle 9 facade report signed — SAFE
06/27/2025
Cycle 9 facade report submitted
06/19/2025
Cycle 9 facade inspection completed
04/28/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/21/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/17/2025
Permit issued — Protection and Mechanical Methods
M00963951-I1-PMM
04/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/28/2025
Signed off — Alteration
INSTALLATION OF MATERIAL HOIST TO PERFORM FACADE WORK AS SHOWN OF DRAWINGS
M01003368-I1
02/11/2025
Permit issued — General Construction
M00902114-I1-GC
11/08/2024
Permit issued — Sidewalk Shed
M00958472-I1-SH
11/08/2024
Permit issued — Supported Scaffold
M00958472-I1-SF
10/29/2024
Permit issued — Suspended Scaffold
M01094054-P1-SC
10/11/2024
Filed — Alteration
INSTALLATION OF OUTRIGGER BEAMS/MATERIAL HOIST TO PERFORM FACADE REPAIRS AND INSPECTIONS.
M01094054-P1
10/10/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
10/10/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
10/07/2024
Violation issued (ECB, closed)
Construction
10/07/2024
Violation issued (ECB, closed)
Construction
10/07/2024
Violation issued (ECB, closed)
Construction
10/07/2024
Violation issued (ECB, closed)
Construction
08/20/2024
Permit issued — Suspended Scaffold
M01094054-I1-SC
08/20/2024
Objection raised — Other
08/20/2024
Objection resolved — Addressed
08/13/2024
Filed — Alteration
INSTALLATION OF OUTRIGGER BEAMS/MATERIAL HOIST TO PERFORM FACADE REPAIRS AND INSPECTIONS.
M01094054-I1
08/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/19/2024
Permit issued — Protection and Mechanical Methods
M00963951-I1-PMM
03/12/2024
Permit issued — Suspended Scaffold
M01003368-I1-SC
02/23/2024
Permit issued — General Construction
M00902114-I1-GC
02/21/2024
Cycle 9 facade report submitted
02/21/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2024
Cycle 9 facade report signed — UNSAFE
02/09/2024
Filed — Alteration
INSTALLATION OF MATERIAL HOIST TO PERFORM FACADE WORK AS SHOWN OF DRAWINGS
M01003368-I1
01/25/2024
Cycle 9 facade inspection completed
11/20/2023
Permit issued — Protection and Mechanical Methods
M00963951-I1-PMM
11/17/2023
Filed — Alteration
M00963951-I1
11/08/2023
Permit issued — Sidewalk Shed
M00958472-I1-SH
11/08/2023
Permit issued — Sidewalk Shed
M00958472-I1-SF
11/07/2023
Filed — Alteration
M00958472-I1
08/10/2023
Objection resolved — Addressed
08/10/2023
Objection resolved — Addressed
08/10/2023
Objection resolved — Addressed
08/10/2023
Objection resolved — Addressed
08/10/2023
Special inspection requirement — Air barrier - visual inspection
William Struth
07/31/2023
Objection raised — Energy
07/31/2023
Objection raised — Scope
07/31/2023
Objection raised — Other
07/31/2023
Objection raised — Inspections
07/18/2023
Filed — Alteration
filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress
M00902114-I1
07/10/2023
Special inspection requirement — Final
William Struth
07/10/2023
Special inspection requirement — Energy Code Compliance Inspections
William Struth
07/10/2023
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/10/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
07/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
SAMI HAJJAR P.E
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/01/2019
Signed off — Alteration
Hereby filing for replacement of one 7.5-ton split system with new split unit on an existing location and to be connected to existing duct work. No Change in use egress or occupancy.
M00228067-I1
10/25/2019
Permit issued — Mechanical Systems
M00228067-I1-MS
10/23/2019
Filed — Alteration
Hereby filing for replacement of one 7.5-ton split system with new split unit on an existing location and to be connected to existing duct work. No Change in use egress or occupancy.
M00228067-I1
Latest 60 of 120 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLSTICE RESIDENTIAL GROUP2507/08/2026
LAND SECURITIES LLC103/22/2026
PAN AM EQUITIES503/22/2026
GALICIA CONSTRUCTION103/22/2026
NEW YORKER CONDOMINIUM1803/21/2026
1474 THIRD PARTNERS2303/21/2026
COMMERCIAL BOARD OF MANAGER103/21/2026
UNIT OWNER303/21/2026
SOLSTICE MANAGEMENT103/21/2026
SUPER COND LTDC OPAN AM EQUITIES303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL PERDEK, PROF. ENG. PLLC111/17/2023
MOHAMMAD AHEAD, PE111/07/2023
LAWLESS AND MANGIONE ARCHITECTS AND107/18/2023
V. SHAMES, P.E.110/23/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE203/21/2026
SKY MANAGEMENT GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AM&G WATERPROOFING LLCGeneral Contractor707/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor407/08/2026
ENER-CON TECHNICAL SERVICGeneral Contractor303/21/2026
LINA ELECTRIC, CORP.Electrical203/22/2026
EMIL KRSLOVICElectrical103/21/2026
GANNON CONTRACTING LLCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ ENGINEERING, P.C.4665210/11/2024
METRIC CONSULTING AND INS1803207/18/2023
GREENLINE DEVELOPERS, LLC3447110/23/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offAM&G WATERPROOFING LLC04/17/2025
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC02/11/2025
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL11/08/2024
DOB NOWSupported ScaffoldSigned-offDYNAMIX SCAFFOLD GROUP LL11/08/2024
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC10/29/2024
DOB NOWSuspended ScaffoldSigned-offAM&G WATERPROOFING LLC08/20/2024
DOB NOWProtection and Mechanical MethodsSigned-offAM&G WATERPROOFING LLC04/19/2024
DOB NOWSuspended ScaffoldPermit IssuedAM&G WATERPROOFING LLC03/12/2024
DOB NOWGeneral ConstructionPermit IssuedAM&G WATERPROOFING LLC02/23/2024
DOB NOWProtection and Mechanical MethodsSigned-offAM&G WATERPROOFING LLC11/20/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL11/08/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL11/08/2023
DOB NOWMechanical SystemsSigned-offENER-CON TECHNICAL SERVIC10/25/2019
BISPLISSUEDPROTO P & H SERVICES CORP10/04/2016
BISOTISSUEDLEX INTERIORS LTD09/26/2016
BISOTISSUEDWE ARE SIGNS & AWNINGS IN11/03/2014
BISPLISSUEDTW PLUMBING & HEATING INC07/21/2014
BISMHISSUEDPRESTIGE REMODELINE LLC07/18/2014
BISOTISSUEDPRESTIGE REMODELINE LLC05/29/2014
BISPLISSUEDPLUMBING & HTG DOCTOR INC03/20/2014
BISOTISSUEDCONSTRUCTION BY DESIGN NY03/03/2014
BISPLISSUEDFERKO PLUMBING & HEATING01/24/2014
BISOTISSUEDANGELOS'S HOME IMPROVEMEN07/26/2013
BISMHISSUEDMOUNTAIN AIR MECHANICAL07/25/2012
BISMHISSUEDMOUNTAIN AIR MECHANICAL05/15/2012
BIS—ISSUEDBERGER SIGNS INC04/26/2012
BISOTISSUEDJORDAN DESIGN GROUP INC02/25/2011
BISPLISSUEDCITY GAS HTG SVC CO INC02/09/2011
BISMHISSUEDBONAIRE MECHANICAL CORP02/04/2011
BISOTISSUEDX-ACT CONTRACTING CORP01/18/2011
BISPLISSUEDORBIT PLBG & HTG INC11/18/2010
BISOTISSUEDMASTEY CONSTRUCTION INC10/07/2010
BISOTISSUEDMASTEY CONSTRUCTION INC10/07/2010
BISMHISSUEDMASTEY CONSTRUCTION INC10/07/2010
BISOTISSUEDXINOS CONSTRUCTION CORP08/17/2010
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC08/05/2010
BISFBISSUEDRICHARD MORTMAN08/05/2010
BISEQISSUEDXINOS CONSTRUCTION CORP05/21/2010
BISPLISSUEDPARAMOUNT PLBG SERV.& ALT03/11/2010
BISOTISSUEDSTASI & SON INC03/08/2010
+ 20 more permits on file
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/28/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/21/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
10/10/2024Post-installed AnchorsKarol Zdancewiczspecial
10/10/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/10/2023Air barrier - visual inspectionWilliam Struthenergy_progress
07/10/2023FinalWilliam Struthprogress
07/10/2023Energy Code Compliance InspectionsWilliam Struthprogress
07/10/2023MasonrySAMI HAJJAR P.Especial
07/10/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/10/2023Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
09/18/2019Energy Code Compliance InspectionsVALERY SHAMESprogress
09/18/2019HVAC and service water heating equipment VALERY SHAMESenergy_progress
09/18/2019HVAC and service water heating system controls VALERY SHAMESenergy_progress
09/18/2019HVAC insulation and sealing VALERY SHAMESenergy_progress
09/18/2019Duct leakage testing VALERY SHAMESenergy_progress
09/18/2019Maintenance informationVALERY SHAMESenergy_progress
09/18/2019Shutoff dampersVALERY SHAMESenergy_progress
09/13/2019FinalVALERY SHAMESprogress
09/13/2019Mechanical SystemsDAVID SILBERMANspecial
▾Documents — 309 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/29/2026M00902114-I1Request digital key ↗
08/28/2026M00958472-I1Request digital key ↗
08/28/2026M00963951-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00228067-I1Request digital key ↗
▸Applications & Permits66
▸BISWORK PERMIT APPLICATION33
10/14/2016122888303Open ↗
10/05/2016122888303Open ↗
11/25/2014122180237Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION32
10/17/2019122023103Open ↗
09/06/2019122023103Open ↗
01/19/2018122023103Open ↗
Showing 3 of 32 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF1
01/24/2018122023103Open ↗
▸Seals & Professional Certifications70
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
06/08/2017122180237Open ↗
09/29/2016122888303Open ↗
04/13/2015122251981Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/24/2026M00902114-I1Open ↗
08/24/2026M00902114-I1Open ↗
08/23/2026M00228067-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
11/06/2014122180237Open ↗
06/03/2014122023103Open ↗
08/06/2013121680172Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
08/08/2013121680172Open ↗
04/02/2012121017229Open ↗
10/14/2010120494973Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/24/2026M00902114-I1Open ↗
08/24/2026M00902114-I1Open ↗
08/23/2026M00228067-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026M00902114-I1Open ↗
08/28/2026M00958472-I1Open ↗
08/28/2026M00963951-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/06/2014122180237Open ↗
06/03/2014122023103Open ↗
▸Trade Schedules & Equipment35
▸BISSELF-CERT PLUMBING NOTICE14
12/04/2014122023103Open ↗
09/03/2014122023103Open ↗
05/27/2014121839305Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING13
03/09/2015122251981Open ↗
11/13/2013121839305Open ↗
08/08/2013121680172Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
11/06/2017122888303Open ↗
09/29/2016122888303Open ↗
09/30/2014122023103Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/03/2014122023103Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
06/03/2014122023103Open ↗
01/05/2011120564013Open ↗
▸BISTenant Protection Plan and Notes1
09/29/2016122888303Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00228067-I1Open ↗
▸Environmental & Asbestos23
▸BISASBESTOS-CERTIFICATION (DEP ACP5)12
03/09/2015122251981Open ↗
01/30/2015122180237Open ↗
01/23/2014121839305Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
04/02/2012121017229Open ↗
10/14/2010120494973Open ↗
05/18/2012121057202Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
11/13/2013121839305Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026M00902114-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
06/08/2017122180237Open ↗
09/29/2016122888303Open ↗
11/25/2014122180237Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections2
03/09/2015122251981Open ↗
05/18/2012121057202Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/08/2017122180237Open ↗
09/18/2014121839305Open ↗
▸Approvals, Objections & Sign-offs27
▸BISADMINISTRATIVE OBJECTIONS12
05/18/2012121057202Open ↗
04/02/2012121017229Open ↗
01/05/2011120564013Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
06/08/2017122180237Open ↗
02/24/2015122180237Open ↗
09/18/2014121839305Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/17/2019122023103Open ↗
12/15/2011120433619Open ↗
09/27/2011120371123Open ↗
Showing 3 of 5 on file for this type
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT28
06/08/2017122180237Open ↗
09/29/2016122888303Open ↗
03/09/2015122251981Open ↗
Showing 3 of 28 on file for this type
▸Filing & Intake Forms27
▸BISEFILING COVER SHEET16
09/29/2016122888303Open ↗
03/09/2015122251981Open ↗
11/06/2014122180237Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION7
10/17/2019122023103Open ↗
01/24/2018122023103Open ↗
11/14/2017122888303Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM3
09/06/2019122023103Open ↗
01/19/2018122023103Open ↗
11/06/2017122888303Open ↗
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents11
▸DOB NOWCalculations3
08/13/2026M01003368-I1Open ↗
08/13/2026M01094054-P1Open ↗
08/13/2026M01094054-I1Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026M01003368-I1Open ↗
08/13/2026M01094054-I1Open ↗
08/13/2026M01094054-P1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form2
07/30/2013121680172Open ↗
10/14/2010120494973Open ↗
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT1
11/26/2010120433619Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/01/2011120433619Open ↗