← Back
Over six families without stores
1474 GATES AVENUE
BROOKLYN · Bushwick (East) · BIN 3387654
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
8,073 sfGross Floor Area
10Units
3 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 583-589 KNICKERBOCKER AVE PARTNERS LLC · 2,500 sf lot · 3.23 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 9 docs
Floor 21p · 1 filing · 9 docs
Floor 15p · 1 filing · 9 docs
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RISEBORO COMMUNITY PARTNERSHIP409/01/2026
NYC HOUSING PRESERVATION AND DEVELOPMENT103/22/2026
HPD 806403/22/2026
HOUSING PRESERVATION AND103/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
NYC SCHOOL CONSTRUCTION AUTH203/21/2026
HPD203/21/2026
DEPARTMENT OF HPD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
B4 ARCHITECTURE LLC208/25/2026
INDUS ENGINEERING PC208/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOTTI, LAWRENCEElectrical103/21/2026
ROOPCHAND SINGHElectrical103/21/2026
WHITNEY, ELWOODElectrical103/21/2026
Building Lifecycle
All (91)Filed (4)Violation (52)Objection (8)Special Inspection (27)
09/23/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/08/2026
Objection resolved — Addressed
08/25/2026
Filed — Alteration
MH: Replace existing Packaged Roof AC units and controls. Provide new Baseboard heaters. No change in use occupancy or egress.
B01403617-S3
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Other
08/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/11/2026
Filed — Alteration
MH: Replace existing Packaged Roof AC units and controls. Provide new Baseboard heaters. No change in use occupancy or egress.
B01403617-S1
08/11/2026
Filed — Alteration
MH: Replace existing Packaged Roof AC units and controls. Provide new Baseboard heaters. No change in use occupancy or egress.
B01403617-S2
08/10/2026
Filed — Alteration
MH: Replace existing Packaged Roof AC units and controls. Provide new Baseboard heaters. No change in use occupancy or egress.
B01403617-I1
06/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
06/01/2026
Special inspection requirement — Structural Steel - Details
06/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
06/01/2026
Special inspection requirement — Structural Steel - Welding
06/01/2026
Special inspection requirement — Final
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/01/2026
Special inspection requirement — Heating Systems
06/01/2026
Special inspection requirement — Mechanical Systems
06/01/2026
Special inspection requirement — Final
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/01/2026
Special inspection requirement — Maintenance information
06/01/2026
Special inspection requirement — Permanent certificate
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/18/2026
Special inspection requirement — Masonry
05/18/2026
Special inspection requirement — Final
05/18/2026
Special inspection requirement — Insulation placement and R values
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/07/2024
Violation issued (ECB, closed)
Construction
05/07/2024
Violation issued (ECB, closed)
Construction
04/06/2023
Violation issued (FDNY_NOV, closed)
03/15/2023
Violation issued (ECB, closed)
Construction
03/15/2023
Violation issued (ECB, closed)
Construction
03/15/2023
Violation issued (ECB, closed)
Construction
03/15/2023
Violation issued (ECB, closed)
Construction
04/14/2022
Violation issued (ECB, closed)
Construction
04/14/2022
Violation issued (ECB, closed)
Construction
11/30/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/16/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/21/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/13/2017
Violation issued (ECB, closed)
Elevators
09/07/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/05/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/04/2015
Violation issued (HPD, closed)
I
12/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDRIDGEWOOD BUSHWICK YOUTH CENTER09/13/2004
BISPLISSUEDLAFATA CORALLO P & H INC10/07/2003
BISPLISSUEDLAFATA CORALLO P & H INC01/28/2003
BISSPISSUEDUNITED FIRE PROTECTION CRP01/21/2003
BISEQISSUEDSIKANIB G CONTRACTING INC01/09/2003
BIS—ISSUEDSIKANIB G CONTRACTING INC08/07/2002
BISEQRE-ISSUEDSIKANIB G CONTRACTING INC07/30/2002
BISPLISSUEDLAFATA CORALLO P & H INC01/29/2002
BISEQISSUEDSIKANIB G CONTRACTING INC12/26/2001
BIS—ISSUEDSIKANIB G CONTRACTING INC10/31/2001
BISEQISSUEDSCALA CONTRACTING CO., INC.11/14/1996
BIS—ISSUEDSCALA CONTRACTING CO., INC.11/14/1996
BISEQISSUEDBLANDFORD CONSTRUCTION CORP.05/11/1993
BIS—ISSUEDBLANFORD CONSTRUCTION05/11/1993
BIS—ISSUEDBLANFORD CONSTRUCTION05/11/1993
1 project · most recent 08/25/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScope
08/25/2026——Heating and Air Conditioning Systems, Heating Systems
1 project · most recent 08/25/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/25/2026——Gas, Water/Sanitary
1 project · most recent 08/25/2026
Steel
FiledStatusContractorScope
08/25/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
08/12/2026Structural Stability – Alterations of existing buildings—special
06/01/2026HVAC-R and service water heating system controls—energy_progress
06/01/2026Duct leakage testing, insulation and design—energy_progress
06/01/2026Fire-Resistant Penetrations and Joints—special
06/01/2026Energy Code Compliance Inspections—progress
06/01/2026HVAC-R and service water heating equipment—energy_progress
06/01/2026HVAC-R and service water piping design and insulation—energy_progress
06/01/2026Energy Code Compliance Inspections—progress
06/01/2026Structural Steel - Details—special
06/01/2026Structural Steel - High Strength Bolting—special
06/01/2026Structural Steel - Welding—special
06/01/2026Final—progress
06/01/2026Fire-Resistant Penetrations and Joints—special
06/01/2026Heating Systems—special
06/01/2026Mechanical Systems—special
06/01/2026Final—progress
06/01/2026Energy Code Compliance Inspections—progress
06/01/2026HVAC-R and service water piping design and insulation—energy_progress
06/01/2026HVAC-R and service water heating equipment—energy_progress
06/01/2026HVAC-R and service water heating system controls—energy_progress
06/01/2026Maintenance information—energy_progress
06/01/2026Permanent certificate—energy_progress
05/18/2026Structural Stability – Alterations of existing buildings—special
05/18/2026Masonry—special
05/18/2026Final—progress
Latest 25 of 27.
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026B01403617-S3Request digital key ↗
08/16/2026B01403617-S2Request digital key ↗
08/16/2026B01403617-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026B01403617-S3Open ↗
08/16/2026B01403617-S2Open ↗
08/16/2026B01403617-S1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/16/2026B01403617-S3Open ↗
08/16/2026B01403617-S2Open ↗
08/16/2026B01403617-S1Open ↗
Showing 3 of 4 on file for this type