Walk-up apt, over six families with stores
Highbridge Rising
1476 SHAKESPEARE AVENUE · BIN 2008678
💬 Discuss this project
1924Year Built
5Stories
C7Building Class
R7-1Zoning
33,000 sfGross Floor Area
32Units
LL97 CoveredRent Stabilized10 Open Violations ▸
Walk-up apt, over six families with stores · 8,125 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 1 filing · 20 docs
Floor 5Under Construction7p · 1 filing · 20 docs
Floor 4Under Construction7p · 1 filing · 20 docs
Floor 3Under Construction7p · 1 filing · 20 docs
Floor 2Under Construction7p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
Sub-BasementUnder Construction1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIGHBRIDGE COMMUNITY DEV. CORP2707/25/2026
TRIERA CONTRACTING407/08/2026
HIGHBRIDGE COMMUNITY DEVELOPMENT1107/08/2026
HKS CONSTRUCTION CORP503/22/2026
ELTECH INDUSTRIES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES603/21/2026
NODE ARCHITECTURE ENGINEERING CON403/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
A1 EXPEDITING SERVICE203/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NOTIAS CONSTRUCTION INCGeneral Contractor504/09/2026
E.F.G. GENERAL CONTRACTINGeneral Contractor407/08/2026
HKS CONSTRUCTION CORPGeneral Contractor303/21/2026
AKM CONSTRUCTION NY CORPGeneral Contractor307/25/2026
T & C MECHANICALPlumbing207/08/2026
UNITED ONE MECHANICAL INCPlumbing107/08/2026
ANTHONY QUINONESElectrical103/21/2026
GENE HUMPHREYSElectrical103/21/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOEL PHAGOO ,PE, PLLC2416103/11/2026
CONCRETE SOLUTIONS LAB CO5344603/09/2026
Building Lifecycle
All (126)Filed (12)Permit Issued (14)Signed Off (2)Violation (60)Inspection (8)Special Inspection (30)
07/23/2026
Permit issued — Sidewalk Shed
X01252043-I1-SH
05/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2026
Permit issued — Sidewalk Shed
X01252043-I1-SH
03/25/2026
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/20/2026
Permit issued — Suspended Scaffold
X01207927-S5-SC
03/11/2026
Filed — Alteration
Plumbing work as shown on plans
X01207927-S5
03/10/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
03/10/2026
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
03/10/2026
Special inspection requirement — Final
MINA HANNA
03/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
03/10/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
03/10/2026
Special inspection requirement — Lighting in dwelling units
MINA HANNA
03/10/2026
Special inspection requirement — Interior lighting power
MINA HANNA
03/10/2026
Special inspection requirement — Fenestration areas
MINA HANNA
03/10/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
03/10/2026
Special inspection requirement — Lighting controls
MINA HANNA
03/10/2026
Special inspection requirement — Exterior lighting power
MINA HANNA
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
03/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
MINA HANNA
03/09/2026
Filed — Alteration
Plumbing work as shown on plans
X01207927-P3
03/09/2026
Special inspection requirement — Interior lighting power
03/09/2026
Special inspection requirement — Exterior lighting power
03/09/2026
Special inspection requirement — Lighting in dwelling units
03/09/2026
Special inspection requirement — Lighting controls
03/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/22/2026
Permit issued — Plumbing
X01207927-S2-PL
01/21/2026
Special inspection requirement — Air barrier - visual inspection
MINA HANNA
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
01/21/2026
Special inspection requirement — Final
MINA HANNA
01/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
01/21/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MINA HANNA
01/21/2026
Special inspection requirement — Fenestration areas
MINA HANNA
01/21/2026
Special inspection requirement — Fenestration air leakage
MINA HANNA
12/10/2025
Permit issued — General Construction
X01207927-S4-GC
12/09/2025
Permit issued — Structural
X01207927-S1-ST
12/09/2025
Permit issued — Mechanical Systems
X01207927-S3-MS
12/09/2025
Permit issued — General Construction
X01207927-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/24/2025
Filed — Alteration
Plumbing work as shown on plans
X01207927-S4
07/24/2025
Filed — Alteration
Plumbing work as shown on plans
X01207927-S1
07/24/2025
Permit issued — Sidewalk Shed
X01252043-I1-SH
07/23/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01252043-I1
07/11/2025
Filed — Alteration
Plumbing work as shown on plans
X01207927-S3
07/11/2025
Filed — Alteration
Plumbing work as shown on plans
X01207927-S2
06/25/2025
Filed — Alteration
Plumbing work as shown on plans
X01207927-I1
06/10/2025
Special inspection requirement — Masonry
MINA HANNA
06/10/2025
Special inspection requirement — Structural Steel - Welding
MINA HANNA
06/10/2025
Special inspection requirement — Structural Steel - Details
MINA HANNA
02/20/2025
Violation issued (HPD, closed)
C
02/20/2025
Violation issued (HPD, closed)
A
02/20/2025
Violation issued (HPD, closed)
A
02/20/2025
Violation issued (HPD, closed)
C
02/20/2025
Violation issued (HPD, open)
B
02/20/2025
Violation issued (HPD, closed)
B
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY CORP07/23/2026
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY04/07/2026
DOB NOWSuspended ScaffoldPermit IssuedPREMIER CONSTRUCTION INC03/20/2026
DOB NOWPlumbingPermit IssuedLOGO PLUMBING AND MECH. C01/22/2026
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC12/10/2025
DOB NOWStructuralPermit IssuedNOTIAS CONSTRUCTION INC12/09/2025
DOB NOWMechanical SystemsPermit IssuedNOTIAS CONSTRUCTION INC12/09/2025
DOB NOWGeneral ConstructionPermit IssuedNOTIAS CONSTRUCTION INC12/09/2025
DOB NOWSidewalk ShedPermit IssuedAKM CONSTRUCTION NY07/24/2025
DOB NOWPlumbingSigned-offT & C MECHANICAL01/04/2022
DOB NOWGeneral ConstructionSigned-offE.F.G. GENERAL CONTRACTIN12/03/2021
DOB NOWGeneral ConstructionSigned-offE.F.G. GENERAL CONTRACTIN10/05/2021
DOB NOWSidewalk ShedPermit IssuedTRIERA CONTRACTING INC11/22/2019
DOB NOWSidewalk ShedPermit IssuedHKS CONSTRUCTION CORP10/26/2018
BISOTISSUEDDAVE RESTORATION INC12/13/2019
BISBLISSUEDCHAMP PLUMBING & HTG CORP08/27/2019
BISPLISSUEDCHAMP PLUMBING & HTG CORP08/27/2019
1 project · most recent 03/11/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026Permit IssuedNOTIAS CONSTRUCTION INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana PBE123G35CC 11,800 BTU · Ptac ×1
Heating
Ventilation
8 projects · most recent 05/12/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/12/2026Permit IssuedCENTENNIAL ELEVATOR INDUSGeneral Wiring
05/01/2026CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
03/17/2026Permit IssuedZENA ELECTRIC INC—
07/10/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
11/22/2019Permit IssuedRICHARD NEU—
10/24/2019CompleteITKIN ELECTRIC CORP.Boiler Controls
08/10/2019CompleteMHO'S ELECTRIC CORP—
10/19/2018CompleteRICHARD NEU—
1 project · most recent 07/23/2025
Sidewalk Shed
FiledStatusContractorScope
07/23/2025Permit IssuedAKM CONSTRUCTION NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/25/2026Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/22/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
03/10/2026Fenestration air leakageMINA HANNAenergy_progress
03/10/2026Post-installed AnchorsJOEL PHAGOOspecial
03/10/2026FinalMINA HANNAprogress
03/10/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
03/10/2026Energy Code Compliance InspectionsMINA HANNAprogress
03/10/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
03/10/2026Lighting in dwelling unitsMINA HANNAenergy_progress
03/10/2026Interior lighting powerMINA HANNAenergy_progress
03/10/2026Fenestration areasMINA HANNAenergy_progress
03/10/2026Air barrier - visual inspectionMINA HANNAenergy_progress
03/10/2026Lighting controlsMINA HANNAenergy_progress
03/10/2026Exterior lighting powerMINA HANNAenergy_progress
03/10/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
03/10/2026Tenant Protection Plan ComplianceMINA HANNAspecial
03/09/2026Interior lighting power—energy_progress
03/09/2026Exterior lighting power—energy_progress
03/09/2026Lighting in dwelling units—energy_progress
03/09/2026Lighting controls—energy_progress
03/09/2026Tenant Protection Plan Compliance—special
01/21/2026Air barrier - visual inspectionMINA HANNAenergy_progress
01/21/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
01/21/2026Energy Code Compliance InspectionsMINA HANNAprogress
01/21/2026FinalMINA HANNAprogress
01/21/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
01/21/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
Latest 25 of 49.
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026X00090298-I1Request digital key ↗
08/25/2026X00531823-I1Request digital key ↗
08/25/2026X00519333-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION17
12/16/2020220674394Open ↗
12/15/2020220674394Open ↗
12/04/2020220674394Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION1
12/13/2019220710489Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026X01207927-P3Open ↗
09/01/2026X01207927-P3Open ↗
09/01/2026X01207927-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026X00090298-I1Open ↗
08/25/2026X00531823-I1Open ↗
08/25/2026X00519333-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026X01207927-P3Open ↗
09/01/2026X01207927-S1Open ↗
08/31/2026X01207927-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/12/2019220710489Open ↗
12/12/2019220710489Open ↗
07/11/2019220710489Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/23/2018220674394Open ↗
09/14/2018220667099Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/23/2018220674394Open ↗
09/14/2018220667099Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING4
12/15/2020220674394Open ↗
12/04/2020220674394Open ↗
11/20/2020220674394Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
10/01/2019220667099Open ↗
09/19/2019220667099Open ↗
09/14/2018220667099Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/24/2019220674394Open ↗
10/23/2018220674394Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
07/11/2019220710489Open ↗
10/23/2018220674394Open ↗
09/14/2018220667099Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00270329-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/17/2026X01207927-I1Open ↗
08/17/2026X01207927-S1Open ↗
08/17/2026X01207927-S2Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/23/2018220674394Open ↗
09/14/2018220667099Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00531823-I1Open ↗
08/25/2026X00519333-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/12/2019220710489Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/11/2019220710489Open ↗
10/25/2018220674394Open ↗
09/14/2018220667099Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
03/22/2021220674394Open ↗
03/22/2021220667099Open ↗
06/18/2020220710489Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/22/2021220674394Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
03/22/2021220674394Open ↗
07/06/2020220710489Open ↗
06/26/2020220710489Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs11
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/25/2026X00531823-I1Open ↗
08/17/2026X01207927-S1Open ↗
08/17/2026X01207927-I1Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/22/2021220674394Open ↗
03/22/2021220667099Open ↗
07/06/2020220710489Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/11/2019220710489Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
03/22/2021220674394Open ↗
03/22/2021220667099Open ↗
07/11/2019220710489Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms13
▸BISBOROUGH INTAKE FORM6
03/19/2020220674394Open ↗
03/19/2020220667099Open ↗
02/13/2020220710489Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
06/10/2020220667099Open ↗
03/13/2020220710489Open ↗
12/16/2019220710489Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
07/11/2019220710489Open ↗
10/23/2018220674394Open ↗
09/14/2018220667099Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/17/2026X01207927-I1Open ↗
08/17/2026X01207927-P3Open ↗
▸DOB NOWManufacturer's Specifications1
08/17/2026X01207927-S5Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026X00090298-I1Open ↗
▸DOB NOWHPD - Completion Notice1
08/13/2026X00519333-I1Open ↗
▸DOB NOWCalculations1
08/17/2026X01207927-S5Open ↗