← Back
One family attached or semi-detached
148-06 61 ROAD
QUEENS · BIN 4140955
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R4Zoning
1,260 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (11)Filed (2)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (2)
08/10/2023
Signed off — Alteration
REPLACEMENT OF CONCRETE PAVER IN REAR YARD AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08006307-S1
07/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/21/2023
Signed off — Alteration
REPLACEMENT OF CONCRETE PAVER IN REAR YARD AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08006307-I1
06/15/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/13/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/12/2023
Permit issued — General Construction
Q08006307-S1-GC
04/29/2023
Permit issued — Plumbing
Q08006307-I1-PL
11/11/2022
Filed — Alteration
REPLACEMENT OF CONCRETE PAVER IN REAR YARD AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08006307-S1
11/08/2022
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
09/26/2022
Filed — Alteration
REPLACEMENT OF CONCRETE PAVER IN REAR YARD AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q08006307-I1
09/20/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
INDARDEO PARBHUNATH
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.211/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLPRO GENERAL CNTRTING CGeneral Contractor107/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129111/11/2022
IP CONCRETE TESTING AND I6252109/26/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offALLPRO GENERAL CNTRTING C05/12/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG04/29/2023
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/15/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/13/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/08/2022Concrete - Cast-In-PlaceMEHDI GHAZIspecial
09/20/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationINDARDEO PARBHUNATHspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026Q08006307-S1Request digital key ↗
08/25/2026Q08006307-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q08006307-I1Open ↗
08/13/2026Q08006307-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q08006307-S1Open ↗
08/24/2026Q08006307-I1Open ↗