Public elementary, junior or senior high
P.S. 181 Brookfield
148-15 148 AVENUE · BIN 4291453
💬 Discuss this project
1967Year Built
2Stories
W1Building Class
R3-1Zoning
55,392 sfGross Floor Area
0Units
LL97 Covered11 Open Violations 0 unresolved · 11 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 74,300 sf lot · 0.75 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
Floor 2Under Construction1 filing · 20 docs
Floor 1Under Construction5p · 2 filings · 20 docs
CellarUnder Construction1 filing · 20 docs
Basement6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY5609/30/2026
NYC SCHOOL CONSTRUCTION707/03/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION 0503/22/2026
DEPARTMENT OF EDUCATION1403/22/2026
DEPT OF EDUCATION P.S.181803/22/2026
DOE PS 181 040503/22/2026
DOE Q 181 040103/22/2026
DEARTMENT OF EDUCATION 0103/22/2026
DEPARTMENT OF ED PS 181 B103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV2403/21/2026
DSENY ENGINEERING SERVICES1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SEA BREEZE GENERAL CONSTRGeneral Contractor4207/08/2026
INTRICATE TECH SOLUTIONSGeneral Contractor506/27/2026
AMCON CONTRACTING CORPGeneral Contractor403/21/2026
FORSYTHE P&H CORPPlumbing309/30/2026
ROMA SCAFFOLDING INCGeneral Contractor303/21/2026
TWILIGHT CONSTR INCGeneral Contractor207/03/2026
COONEY, RONANElectrical103/21/2026
BORRELLI, RAFFAELEElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
MARTANY TILE CORPElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001501/16/2025
JPC LOGISTICS DBA JPCL EN351103/23/2023
Building Lifecycle
All (174)Filed (24)Permit Issued (37)Signed Off (4)Violation (60)Inspection (1)Objection (18)Special Inspection (30)
09/29/2026
Permit issued — Plumbing
Q00639059-S1-PL
08/17/2026
Signed off — Alteration
SF/PS181Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # Q00639059 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00760753-I1
08/07/2026
Signed off — Alteration
SH/PS181Q - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SHED) SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # Q00639059 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00760749-I1
08/07/2026
Signed off — Alteration
Q00760744-I1
07/01/2026
Permit issued — General Construction
Q01164903-I1-GC
06/24/2026
Permit issued — Structural
Q00639059-I1-MS
04/07/2026
Permit issued — Mechanical Systems
Q00639059-I1-MS
02/27/2026
Violation issued (FDNY_NOV, closed)
02/26/2026
Violation issued (ECB, open)
Construction
02/26/2026
Violation issued (ECB, open)
Construction
02/26/2026
Violation issued (ECB, open)
Construction
02/26/2026
Violation issued (ECB, open)
Construction
02/05/2026
Violation issued (FDNY_ORDER, closed)
02/05/2026
Violation issued (FDNY_ORDER, closed)
01/30/2026
Violation issued (FDNY_NOV, closed)
01/02/2026
Permit issued — Construction Fence
Q00760744-I1-FN
12/23/2025
Violation issued (ECB, open)
Elevators
12/18/2025
Permit issued — General Construction
Q00639059-I1-ST
12/18/2025
Permit issued — Support of Excavation
Q00781540-I1-SE
12/18/2025
Permit issued — Structural
Q00639059-I1-GC
12/16/2025
Permit issued — General Construction
Q01164903-I1-GC
12/11/2025
Violation issued (FDNY_ORDER, closed)
12/11/2025
Violation issued (FDNY_ORDER, closed)
10/23/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/14/2025
Special inspection requirement — Post-installed Anchors
08/26/2025
Violation issued (FDNY_NOV, closed)
08/26/2025
Objection raised — Other
08/26/2025
Objection raised — Other
08/13/2025
Filed — Alteration
Q181_Remove existing gas-fired heater and temporary heater. Provide new heat pump water heaters.
Q01270508-S1
08/13/2025
Filed — Alteration
Q181_Remove existing gas-fired heater and temporary heater. Provide new heat pump water heaters.
Q01270508-I1
08/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/13/2025
Special inspection requirement — Energy Code Compliance Inspections
08/13/2025
Special inspection requirement — Post-installed Anchors
08/13/2025
Special inspection requirement — Electrical motors and elevators
08/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
08/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/13/2025
Special inspection requirement — Maintenance information
08/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
08/12/2025
Special inspection requirement — Mechanical Systems
08/12/2025
Special inspection requirement — Final
07/11/2025
Violation issued (FDNY_ORDER, closed)
03/04/2025
Violation issued (ECB, closed)
Construction
03/04/2025
Violation issued (ECB, open)
Construction
03/04/2025
Violation issued (ECB, open)
Construction
03/04/2025
Violation issued (ECB, open)
Construction
03/04/2025
Violation issued (ECB, closed)
Construction
02/24/2025
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
01/30/2025
Violation issued (FDNY_NOV, closed)
01/16/2025
Filed — Alteration
Q01164903-I1
11/04/2024
Filed — Alteration
Q181_Reconstruct main entrance vestibule slab structure. Perform exterior masonry work. Remove and replace foundation wall waterproofing, main/low/bulkhead roofing systems, exhaust fans, and Playground asphalt pavement
Q00639059-P8
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
10/03/2024
Filed — Alteration
Q181_Reconstruct main entrance vestibule slab structure. Perform exterior masonry work. Remove and replace foundation wall waterproofing, main/low/bulkhead roofing systems, exhaust fans, and Playground asphalt pavement
Q00639059-P7
08/12/2024
Violation issued (FDNY_NOV, closed)
08/05/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/05/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NELSON LOPEZ
07/30/2024
Filed — Alteration
SOE/PS181Q - FOR TEMPORARY SHORING OF EXCAVATION SUBMITTING ON BEHALF OF CONTRACTOR, IN CONJUNCTION WITH DOB # Q00639059 NO CHANGE IN USE, OCCUPANCY OR EGRESS
Q00781540-P2
07/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
07/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
07/03/2024
Permit issued — Mechanical Systems
Q00639059-I1-ST
Latest 60 of 174 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP09/29/2026
DOB NOWGeneral ConstructionPermit IssuedTWILIGHT CONSTR INC07/01/2026
DOB NOWStructuralPermit IssuedINTRICATE TECH SOLUTIONS06/24/2026
DOB NOWMechanical SystemsPermit IssuedINTRICATE TECH SOLUTIONS04/07/2026
DOB NOWConstruction FenceSigned-offROBERT MICHAEL DES & CONT01/02/2026
DOB NOWGeneral ConstructionPermit IssuedROBERT MICHAEL DES & CONT12/18/2025
DOB NOWSupport of ExcavationPermit IssuedROBERT MICHAEL DES & CONT12/18/2025
DOB NOWStructuralPermit IssuedROBERT MICHAEL DES & CONT12/18/2025
DOB NOWGeneral ConstructionPermit IssuedTWILIGHT CONSTR INC12/16/2025
DOB NOWMechanical SystemsPermit IssuedROBERT MICHAEL DES & CONT07/03/2024
DOB NOWMechanical SystemsPermit IssuedROBERT MICHAEL DES & CONT07/03/2024
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP06/14/2024
DOB NOWConstruction FenceSigned-offAMCON CONTRACTING CORP04/11/2024
DOB NOWGeneral ConstructionPermit IssuedROBERT MICHAEL DES & CONT03/13/2024
DOB NOWGeneral ConstructionPermit IssuedROBERT MICHAEL DES & CONT03/13/2024
DOB NOWSupport of ExcavationPermit IssuedROBERT MICHAEL DES & CONT03/13/2024
DOB NOWSupport of ExcavationPermit IssuedROBERT MICHAEL DES & CONT03/07/2024
DOB NOWSupport of ExcavationPermit IssuedROBERT MICHAEL DES & CONT02/21/2024
DOB NOWGeneral ConstructionPermit IssuedROBERT MICHAEL DES & CONT02/21/2024
DOB NOWMechanical SystemsPermit IssuedROBERT MICHAEL DES & CONT02/21/2024
DOB NOWPlumbingPermit IssuedFORSYTHE P&H CORP07/14/2023
DOB NOWSidewalk ShedSigned-offROBERT MICHAEL DES & CONT07/13/2023
DOB NOWSupported ScaffoldSigned-offROBERT MICHAEL DES & CONT07/03/2023
DOB NOWGeneral ConstructionPermit IssuedROBERT MICHAEL DES & CONT06/27/2023
DOB NOWGeneral ConstructionPermit IssuedROBERT MICHAEL DES & CONT06/27/2023
DOB NOWSupport of ExcavationPermit IssuedROBERT MICHAEL DES & CONT06/27/2023
DOB NOWStructuralPermit IssuedROBERT MICHAEL DES & CONT06/27/2023
DOB NOWMechanical SystemsPermit IssuedINTRICATE TECH SOLUTIONS06/26/2023
DOB NOWSupport of ExcavationPermit IssuedROBERT MICHAEL DES & CONT06/20/2023
DOB NOWGeneral ConstructionPermit IssuedROBERT MICHAEL DES & CONT06/20/2023
DOB NOWStructuralPermit IssuedROBERT MICHAEL DES & CONT06/20/2023
DOB NOWConstruction FenceSigned-offROBERT MICHAEL DES & CONT03/22/2023
DOB NOWSupported ScaffoldSigned-offROBERT MICHAEL DES & CONT10/17/2022
DOB NOWConstruction FenceSigned-offROBERT MICHAEL DES & CONT08/16/2022
DOB NOWSidewalk ShedSigned-offROBERT MICHAEL DES & CONT08/11/2022
DOB NOWSidewalk ShedSigned-offROMA SCAFFOLDING INC06/25/2021
DOB NOWConstruction FenceSigned-offAMCON CONTRACTING CORP06/24/2021
BISOTISSUEDAMCON CONTRACTING CORP12/29/2023
BISOTISSUEDAMCON CONTRACTING CORP01/05/2023
BISOTISSUEDAMCON CONTRACTING CORP07/13/2021
+ 32 more permits on file
1 project · most recent 11/04/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/04/2024Permit IssuedINTRICATE TECH SOLUTIONSAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric BUY-A24NHAS7-BS 2 tons · Vrf Outdoor ×6
Heating
Carrier 36SC40KR32-2 550 CFM ×3
Ventilation
Greenheck CUBE-200-VG 3,050 CFM · Exhaust Fan ×3
CUE-240HP-VG 4,050 CFM · Exhaust Fan ×3
3 projects · most recent 08/13/2025
Gas Water/Sanitary Storm
FiledStatusContractorScope
08/13/2025——Gas, Water/Sanitary
11/04/2024Permit IssuedFORSYTHE P&H CORPStorm
08/23/2023——Gas, Water/Sanitary
14 projects · most recent 12/02/2025
General Wiring
FiledStatusContractorScope
12/02/2025CompleteCHARAN ELEC'L ENTERP'S IN—
09/18/2025Permit IssuedMNBC ELECTRICAL CORPGeneral Wiring
10/30/2024CompleteGT ELECTRICAL COMPANY INCGeneral Wiring
12/20/2023CompleteANCO ELECTL CONTCTNG INC—
11/22/2023CompleteGEMINI ELECTRIC CO., INC.—
12/30/2022CompleteCHARAN ELEC'L ENTERP'S IN—
09/16/2022CompleteHIGH VOLT ELEC CORP. OFGeneral Wiring
08/08/2022CompleteSTANCO SYSTEM ELEC'L CONT—
06/22/2022CompletePRINCE ELECTRIC CORP.—
07/15/2021Permit IssuedSAMCO ELECTRIC CORP.—
06/11/2021CompleteSTANCO SYSTEM ELEC'L CONT—
10/01/2020CompleteCHARAN ELEC'L ENTERP'S IN—
04/03/2019CompleteCHARAN ELEC'L ENTERP'S IN—
07/16/2018Permit IssuedLERCO ELECTRIC LLCGeneral Wiring
3 projects · most recent 08/13/2025
Steel Concrete
FiledStatusContractorScope
08/13/2025——1 scope_items
11/04/2024Permit IssuedFORSYTHE P&H CORPSteel, Concrete
07/30/2024Permit IssuedSEA BREEZE GENERAL CONSTR2 scope_items
3 projects · most recent 07/28/2022
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
07/28/2022Signed-offSEA BREEZE GENERAL CONSTRSidewalk Shed
07/28/2022Signed-offSEA BREEZE GENERAL CONSTRScaffold
06/04/2021Signed-offAMCON CONTRACTING CORPFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/24/2025Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
10/14/2025Post-installed Anchors—special
08/13/2025HVAC-R and service water piping design and insulation—energy_progress
08/13/2025Energy Code Compliance Inspections—progress
08/13/2025Maintenance information—energy_progress
08/13/2025Electrical motors and elevators—energy_progress
08/13/2025HVAC-R and service water heating equipment—energy_progress
08/13/2025Post-installed Anchors—special
08/13/2025HVAC-R and service water heating system controls—energy_progress
08/13/2025Fire-Resistant Penetrations and Joints—special
08/12/2025Mechanical Systems—special
08/12/2025Final—progress
11/01/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
08/05/2024Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
08/05/2024Post-installed AnchorsNELSON LOPEZspecial
07/11/2024HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
07/11/2024HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
06/03/2024Post-installed AnchorsNELSON LOPEZspecial
06/03/2024Excavations - Sheeting, Shoring, and BracingNELSON LOPEZspecial
09/11/2023FinalNELSON LOPEZprogress
09/11/2023Shutoff dampersNELSON LOPEZenergy_progress
09/11/2023Maintenance informationNELSON LOPEZenergy_progress
09/11/2023Fenestration areasNELSON LOPEZenergy_progress
09/11/2023Fenestration air leakageNELSON LOPEZenergy_progress
09/11/2023Insulation placement and R valuesNELSON LOPEZenergy_progress
09/11/2023Air barrier - visual inspectionNELSON LOPEZenergy_progress
Latest 25 of 110.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ps181qEducation—
Project Q00534232 Alteration · Permit Entire · 06/04/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 178 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/27/2026Q00534305-I1Request digital key ↗
08/27/2026Q00534305-P1Request digital key ↗
08/26/2026Q00760744-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature24
08/27/2026Q00534305-I1Open ↗
08/27/2026Q00534305-P1Open ↗
08/27/2026Q00534232-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026Q00639059-P4Open ↗
09/02/2026Q00639059-P4Open ↗
09/02/2026Q00639059-P4Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q00639059-P4Open ↗
09/02/2026Q00639059-P4Open ↗
09/01/2026Q00639059-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
08/13/2026Q00534305-I1Open ↗
08/13/2026Q00534232-I1Open ↗
08/13/2026Q00534305-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026Q00781540-P2Open ↗
08/22/2026Q00781540-I1Open ↗
08/22/2026Q00781540-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/15/2026Q00639059-S1Open ↗
08/13/2026Q00658607-S1Open ↗
▸Approvals, Objections & Sign-offs58
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)27
08/24/2026Q00658607-S1Open ↗
08/21/2026Q00639059-P7Open ↗
08/21/2026Q00639059-P8Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
08/24/2026Q00658607-S1Open ↗
08/21/2026Q00639059-P7Open ↗
08/21/2026Q00639059-P8Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/26/2026Q00760744-I1Open ↗
08/26/2026Q00760749-I1Open ↗
08/26/2026Q00760753-I1Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/21/2026Q01164903-I1Open ↗
08/15/2026Q00639059-I1Open ↗
▸Other Documents30
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal26
08/24/2026Q00658607-S1Open ↗
08/21/2026Q00639059-P8Open ↗
08/21/2026Q00639059-P4Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWNYCSCA Exhibit 23
08/26/2026Q00760744-I1Open ↗
08/26/2026Q00760749-I1Open ↗
08/26/2026Q00760753-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00781540-I1Open ↗