← Back
Two stories - detached, small or mid-size
148-19 85 AVENUE
QUEENS · BIN 4208307
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R3XZoning
1,936 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof9p · 1 filing · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/06/2017$935K—— → —$483/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES STOUT ARCHITECT & ASSOCIATES206/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOLOGISTICS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNPOWER CORPORATION, SYSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAMES J STOUT ARCHITECTS5913206/07/2024
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
06/07/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00985773-P1
06/07/2024
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00985773-I1
05/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES J STOUT
05/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES J STOUT
05/24/2024
Special inspection requirement — Energy Code Compliance Inspections
JAMES J STOUT
05/24/2024
Special inspection requirement — Final
JAMES J STOUT
05/24/2024
Special inspection requirement — Air barrier - visual inspection
JAMES J STOUT
01/19/2024
Permit issued — Solar
Q00985773-I1-SL
01/09/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00985773-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNPOWER CORPORATION, SYS01/19/2024
1 project · most recent 01/05/2024
FiledStatusContractorScope
01/05/2024CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/24/2024Fire-Resistant Penetrations and JointsJAMES J STOUTspecial
05/24/2024Structural Stability – Alterations of existing buildingsJAMES J STOUTspecial
05/24/2024Energy Code Compliance InspectionsJAMES J STOUTprogress
05/24/2024FinalJAMES J STOUTprogress
05/24/2024Air barrier - visual inspectionJAMES J STOUTenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026Q00985773-P1Open ↗
08/27/2026Q00985773-P1Open ↗
08/27/2026Q00985773-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00985773-I1Open ↗
08/13/2026Q00985773-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q00985773-P1Open ↗
08/27/2026Q00985773-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00985773-I1Open ↗
08/13/2026Q00985773-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q00985773-I1Open ↗