← Back
BuildNYC
Walk-up apt, over six families with stores
148 2ND AVENUE
MANHATTAN · East Village · BIN 1077564
💬 Discuss this project
1900Year Built
5Stories
C7Building Class
R7AZoning
38,243 sfGross Floor Area
62Units
Rent Stabilized19 Active Violations ▸
Walk-up apt, over six families with stores · Owner of record: 269 Associates · 9,412 sf lot · 4.06 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Unit 4A4p · 1 filing · 11 docs
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
269 Associates703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Norman C. Lok, PE209/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Christine Muzio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CBB PlumbingPlumbing207/08/2026
Judd ElectricElectrical103/21/2026
Danube Electric CoElectrical103/22/2026
Danube Electric CoElectrical103/21/2026
Trident Builders GroupGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Norman C. Lok818209/11/2025
Building Lifecycle
All (33)Filed (2)Permit Issued (2)Signed Off (2)Violation (21)Inspection (2)Special Inspection (4)
03/05/2026
Signed off — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-S1
03/05/2026
Signed off — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-I1
01/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/22/2025
Permit issued — Plumbing
M01201582-S1-PL
10/22/2025
Permit issued — General Construction
M01201582-I1-GC
09/11/2025
Filed — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-S1
09/07/2025
Violation issued (HPD, closed)
C
09/07/2025
Violation issued (HPD, closed)
A
09/07/2025
Violation issued (HPD, closed)
A
08/19/2025
Filed — Alteration
Plumbing for interior renovation of apartment 4A
M01201582-I1
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NORMAN LOK
03/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
NORMAN LOK
03/26/2025
Special inspection requirement — Final
ADITYA DESAI
11/02/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, open)
B
03/04/2022
Violation issued (HPD, closed)
B
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
A
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
C
03/04/2022
Violation issued (HPD, closed)
B
03/04/2022
Violation issued (HPD, open)
A
05/16/2013
Violation issued (HPD, closed)
C
05/16/2013
Violation issued (HPD, closed)
B
05/16/2013
Violation issued (HPD, closed)
B
10/15/2011
Violation issued (HPD, closed)
B
04/09/2008
Violation issued (HPD, closed)
B
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCBB Plumbing10/22/2025
DOB NOWGeneral ConstructionSigned-offTrident Builders Group10/22/2025
BISPLISSUEDAjit One Mechanical & General Contracting12/11/2002
BISOTISSUEDCraftsman Construction09/20/2002
BISMHISSUEDGeo Contracting04/18/2001
BISOTISSUEDGeo Contracting04/26/2000
BISPLISSUEDDV Plumbing04/24/2000
1 project · most recent 10/23/2025
General Wiring
FiledStatusContractorScope
10/23/2025CompleteDanube Electric CoGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/26/2025Fire-Resistant Penetrations and JointsNORMAN LOKspecial
03/26/2025Tenant Protection Plan ComplianceNORMAN LOKspecial
03/26/2025Fire-Resistance Rated ConstructionNORMAN LOKprogress
03/26/2025FinalADITYA DESAIprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026M01201582-I1Request digital key ↗
08/21/2026M01201582-S1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026M01201582-I1Open ↗
08/21/2026M01201582-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026M01201582-I1Open ↗
08/25/2026M01201582-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026M01201582-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/21/2026M01201582-I1Open ↗
08/21/2026M01201582-S1Open ↗
▸Other Documents2
▸DOB NOWWaiver Document2
08/13/2026M01201582-I1Open ↗
08/13/2026M01201582-S1Open ↗