← Back
Elevator apt, semi-fireproof without stores
Parkside Manor
148-31 90 AVENUE · BIN 4618716
💬 Discuss this project
2019Year Built
9Stories
D1Building Class
R7XZoning
101,540 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized0 Open ViolationsFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 90 AVE REALTY DE LLC · 15,225 sf lot · 6.67 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
90 AVE REALTY1907/08/2026
90 AVE REALTY DE LLC203/22/2026
ZHONG WANG CONSTRUCTION1303/22/2026
90TH AVENUE REALTY LLC103/22/2026
PROSERO103/22/2026
CENTURY DEVELOPMENT GROUP103/22/2026
SHENG SHENG CONSTRUCTION303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2015$1.3M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAYMOND CHAN ARCHITECT, PC.209/07/2023
ASHRAF CORP302/09/2021
PACE ENGINEERING P.C.202/28/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC1003/21/2026
RAYMOND CHAN ARCHITECT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSOLIDATED SCAFFOLDINGGeneral Contractor2107/08/2026
AMPERE ELECL SERVICES CORElectrical203/22/2026
CENTURY CONSTRUCTION GROUPGeneral Contractor107/08/2026
Building Lifecycle
All (54)Filed (7)Permit Issued (10)Signed Off (3)Violation (30)Inspection (2)Objection (2)
04/19/2026
Violation issued (HPD, closed)
C
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2024
Violation issued (ECB, closed)
Construction
09/25/2024
Violation issued (HPD, closed)
B
08/09/2024
Violation issued (HPD, closed)
A
08/09/2024
Violation issued (HPD, closed)
A
06/12/2024
Violation issued (HPD, closed)
A
06/12/2024
Violation issued (HPD, closed)
B
06/12/2024
Violation issued (HPD, closed)
A
03/01/2024
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00128335-I1
02/26/2024
Signed off — Alteration
FILE 12'-00"CURB CUT, INCLUDING (2) 1'-6" SPLAYS, 218.5' FROM THE INTERSECTION OF 90TH AVENUE AND 150TH STREET. FILED IN CONJUNCTION WITH NEW BUILDING # 421556710. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00145387-I1
02/23/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/19/2024
Signed off — Alteration
Q00119266-I1
02/01/2024
Objection resolved — Addressed
09/17/2023
Objection raised — Scope
09/11/2023
Violation issued (FDNY_NOV, closed)
09/07/2023
Filed — Alteration
FILE 12'-00"CURB CUT, INCLUDING (2) 1'-6" SPLAYS, 218.5' FROM THE INTERSECTION OF 90TH AVENUE AND 150TH STREET. FILED IN CONJUNCTION WITH NEW BUILDING # 421556710. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00145387-P1
09/05/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/28/2023
Permit issued — Curb Cut
Q00145387-I1-CC
04/03/2023
Violation issued (HPD, closed)
A
05/04/2022
Permit issued — Supported Scaffold
Q00128335-I1-SF
06/25/2021
Permit issued — Sidewalk Shed
Q00119266-I1-SH
05/04/2021
Permit issued — Supported Scaffold
Q00128335-I1-SF
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2021
Violation issued (ECB, closed)
Construction
03/23/2021
Violation issued (ECB, closed)
Construction
03/23/2021
Violation issued (ECB, closed)
Construction
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/09/2021
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00128335-P2
11/19/2020
Violation issued (ECB, closed)
Construction
11/19/2020
Violation issued (ECB, closed)
Construction
06/22/2020
Permit issued — Sidewalk Shed
Q00119266-I1-SH
06/18/2020
Permit issued — Supported Scaffold
Q00128335-I1-SF
09/05/2019
Violation issued (ECB, closed)
Construction
08/14/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00128335-P1
07/30/2019
Violation issued (ECB, closed)
Unknown
06/26/2019
Permit issued — Supported Scaffold
Q00128335-I1-SF
06/26/2019
Permit issued — Sidewalk Shed
Q00119266-I1-SH
06/20/2019
Violation issued (ECB, closed)
Plumbing
06/20/2019
Violation issued (ECB, closed)
Construction
04/20/2019
Violation issued (ECB, closed)
Construction
03/22/2019
Filed — Alteration
FILE 12'-00"CURB CUT, INCLUDING (2) 1'-6" SPLAYS, 218.5' FROM THE INTERSECTION OF 90TH AVENUE AND 150TH STREET. FILED IN CONJUNCTION WITH NEW BUILDING # 421556710. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00145387-I1
03/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2019
Filed — Alteration
Q00119266-P1
02/08/2019
Permit issued — Supported Scaffold
Q00128335-I1-SF
02/07/2019
Filed — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
Q00128335-I1
01/18/2019
Violation issued (ECB, closed)
Construction
01/16/2019
Permit issued — Sidewalk Shed
Q00119266-I1-SH
01/15/2019
Filed — Alteration
Q00119266-I1
11/28/2018
Violation issued (ECB, closed)
Construction
11/28/2018
Violation issued (ECB, closed)
Construction
11/28/2018
Violation issued (ECB, closed)
Construction
11/28/2018
Violation issued (ECB, closed)
Construction
10/19/2018
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCENTURY CONSTRUCTION GROUP07/28/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING05/04/2022
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/25/2021
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING05/04/2021
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/22/2020
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/18/2020
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/26/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING06/26/2019
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING02/08/2019
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING01/16/2019
BISSDISSUEDRRP PLUMBING CORP06/20/2022
BIS—ISSUEDZHONG WANG CONSTRUCTION S05/03/2022
BIS—ISSUEDZHONG WANG CONSTRUCTION S03/08/2022
BIS—ISSUEDZHONG WANG CONSTRUCTION S11/30/2021
BISPLISSUEDRRP PLUMBING CORP11/17/2021
BIS—ISSUEDZHONG WANG CONSTRUCTION S11/10/2021
BIS—ISSUEDZHONG WANG CONSTRUCTION S02/19/2021
BISSDISSUEDRRP PLUMBING CORP10/23/2020
BISPLISSUEDRRP PLUMBING CORP10/21/2020
BISEQISSUEDZHONG WANG CONSTRUCTION S07/07/2020
BISEQISSUEDCONSOLIDATED SCAFFOLDING05/18/2020
BIS—ISSUEDZHONG WANG CONSTRUCTION S04/08/2020
BIS—ISSUEDZHONG WANG CONSTRUCTION S03/16/2020
BISEQISSUEDCONSOLIDATED SCAFFOLDING03/09/2020
BISPLISSUEDRRP PLUMBING CORP10/23/2019
BISEQISSUEDZHONG WANG CONSTRUCTION S09/05/2019
BISEQISSUEDCONSOLIDATED SCAFFOLD & BRIDGE05/14/2019
BIS—ISSUEDZHONG WANG CONSTRUCTION S03/15/2019
BISEQISSUEDCONSOLIDATED SCAFFOLDING03/05/2019
BIS—ISSUEDZHONG WANG CONSTRUCTION S11/19/2018
BIS—ISSUEDZHONG WANG CONSTRUCTION S11/15/2018
BISPLISSUEDRRP PLUMBING CORP10/16/2018
BISEQISSUEDZHONG WANG CONSTRUCTION S08/06/2018
BIS—ISSUEDZHONG WANG CONSTRUCTION S08/06/2018
BIS—ISSUEDZHONG WANG CONSTRUCTION S08/06/2018
BISSDISSUEDRRP PLUMBING CORP08/03/2018
13 projects · most recent 03/14/2025
General Wiring
FiledStatusContractorScope
03/14/2025CompleteHV ELECTRIC CORP93 meters
10/07/2024CompleteHYLAN DATACOM & ELECL LLC94 meters, 1 new_meters
06/14/2024CompleteHV ELECTRIC CORP—
02/20/2024CompleteHV ELECTRIC CORP—
01/12/2024CompleteHYLAN DATACOM & ELECL LLC2 meters, 1 new_meters
10/05/2021CompleteAMPERE ELECL SERVICES CORGeneral Wiring
10/05/2021CompleteAMPERE ELECL SERVICES COR93 meters, 93 new_meters
06/16/2021CancelledAMPERE ELECL SERVICES COR93 meters, 93 new_meters
05/13/2019CompleteAMPERE ELECL SERVICES COR—
05/06/2019CompleteKWONG MING ELECTRIC INC—
03/25/2019CompleteAMPERE ELECL SERVICES COR1 meters, 1 new_meters
01/11/2019CompleteV. VASS ELECTRIC CORP—
01/11/2019CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/23/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/05/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Documents — 363 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Supported Scaffold3
08/28/2026Q00128335-I1Request digital key ↗
08/15/2026Q00128335-P1Request digital key ↗
08/15/2026Q00128335-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/28/2026Q00119266-I1Request digital key ↗
08/15/2026Q00119266-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
08/24/2026Q00145387-I1Request digital key ↗
08/15/2026Q00145387-P1Request digital key ↗
▸Applications & Permits74
▸BISPLAN / WORK APPROVAL APPLICATION53
04/18/2025440547080Open ↗
04/18/2025440536412Open ↗
12/06/2024421556710Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION16
03/10/2022421556710Open ↗
11/19/2020440484913Open ↗
05/19/2020440547080Open ↗
Showing 3 of 16 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
07/18/2020421598943Open ↗
04/14/2020421598943Open ↗
Showing 2 of 3 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
07/21/2025421556710Open ↗
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026Q00119266-I1Open ↗
08/13/2026Q00128335-P1Open ↗
08/13/2026Q00145387-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment46
▸BISEQUIPMENT USE APPLICATION/PERMIT20
01/10/2024421556710Open ↗
01/10/2024421556710Open ↗
01/10/2024421556710Open ↗
Showing 3 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS12
01/10/2024421556710Open ↗
01/10/2024421556710Open ↗
01/10/2024421556710Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING6
11/01/2022421556710Open ↗
10/11/2022421556710Open ↗
09/30/2022421556710Open ↗
Showing 3 of 6 on file for this type
▸BISSTANDPIPE SYSTEMS3
02/03/2023421556710Open ↗
02/03/2023421556710Open ↗
01/09/2023440484913Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/22/2020421556710Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER SYSTEMS1
02/03/2023421556710Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/22/2025421556710Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
08/22/2025421556710Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST3
09/10/2024421556710Open ↗
Showing 1 of 3 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN2
05/22/2023421556710Open ↗
03/30/2020421598943Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
04/07/2020421598943Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
04/07/2020421598943Open ↗
▸Environmental & Asbestos16
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED5
07/16/2024440547080Open ↗
03/30/2020421598943Open ↗
Showing 2 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION5
06/06/2024440547080Open ↗
03/26/2024440536412Open ↗
05/22/2023421890378Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026Q00128335-P2Open ↗
08/13/2026Q00119266-P1Open ↗
08/13/2026Q00128335-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction1
08/13/2026Q00128335-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/12/2024421556710Open ↗
03/12/2024421556710Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/03/2023421556710Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/03/2023421556710Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/03/2023421556710Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/03/2023421556710Open ↗
▸BISLIGHTING CONTROLS1
02/03/2023421556710Open ↗
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY16
05/23/2024440536412Open ↗
03/26/2024440536412Open ↗
03/26/2024440547080Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
02/03/2023421556710Open ↗
02/03/2023421556710Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
03/07/2020421556710Open ↗
Showing 1 of 2 on file for this type
▸BISBORINGS / TEST PITS (TR-4) 27-7201
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs25
▸BISSCHEDULE A - OCCUPANCY / USE9
07/29/2024421556710Open ↗
12/08/2022421556710Open ↗
Showing 2 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
03/10/2022421556710Open ↗
Showing 1 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
07/26/2024440547080Open ↗
05/24/2024440536412Open ↗
05/24/2023421890378Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
03/26/2024440536412Open ↗
03/26/2024440547080Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/10/2022421556710Open ↗
Showing 1 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/17/2023440484913Open ↗
▸Filing & Intake Forms50
▸BISADDITIONAL INFORMATION32
09/10/2024421556710Open ↗
09/10/2024421556710Open ↗
07/23/2024440547080Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISBOROUGH INTAKE FORM7
04/04/2023420518755Open ↗
03/10/2022421556710Open ↗
11/19/2020440484913Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents21
▸BISBPP - SUPPORTING DOCUMENTATION11
04/14/2020421598943Open ↗
04/14/2020421598943Open ↗
04/14/2020421598943Open ↗
Showing 3 of 11 on file for this type
▸BISSMOKE CONTROL SYSTEMS2
02/03/2023421556710Open ↗
02/03/2023421556710Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL2
02/03/2023421556710Open ↗
02/03/2023421556710Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCLINTON DIST: HPD CERT COMPLETION LOW-INCOME HOUSING1
06/25/2024440547080Open ↗
▸BISMAINTENANCE INFORMATION1
02/03/2023421556710Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDoc 11
08/13/2026Q00128335-P2Open ↗