← Back
Two family brick
148-43 61 ROAD
QUEENS · BIN 4140929
💬 Discuss this project
1950Year Built
2Stories
B1Building Class
R4Zoning
1,937 sfGross Floor Area
2Units
Two family brick · 1,800 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 3 docs
Floor 29p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/18/2023$805K—— → —$416/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEI ARCHITECT PLLC309/09/2025
SYNERGIC DESIGN ARCHITECTS108/16/2024
MEHDI GHAZI, P.E., P.C.406/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALPHA HOME DESIGN LLC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor1607/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129609/09/2025
SYNERGIC DESIGN LLC8561108/16/2024
TRIANGLE INSPECTION & TES7495206/20/2024
Building Lifecycle
All (80)Filed (8)Permit Issued (8)Signed Off (5)Inspection (7)Objection (22)Special Inspection (30)
10/15/2025
Signed off — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-I1
10/03/2025
Special inspection requirement — Permanent certificate
MEHDI GHAZI
10/03/2025
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
10/03/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
10/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
10/03/2025
Special inspection requirement — Interior lighting power
MEHDI GHAZI
10/03/2025
Special inspection requirement — Metering
MEHDI GHAZI
10/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
10/03/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/03/2025
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
10/03/2025
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
10/03/2025
Special inspection requirement — Heating Systems
MEHDI GHAZI
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
10/03/2025
Special inspection requirement — Final
MEHDI GHAZI
10/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
10/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
10/03/2025
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
10/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
10/03/2025
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
10/03/2025
Special inspection requirement — Maintenance information
MEHDI GHAZI
10/03/2025
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
10/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
10/03/2025
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
10/03/2025
Special inspection requirement — Fenestration areas
MEHDI GHAZI
09/09/2025
Filed — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-P4
09/09/2025
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
09/09/2025
Special inspection requirement — Heating Systems
MEHDI GHAZI
09/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
09/09/2025
Special inspection requirement — Chimneys and vents
MEHDI GHAZI
09/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
09/09/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/09/2025
Signed off — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-S1
07/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER THE PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00932696-I1
05/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/19/2025
Signed off — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-S2
02/20/2025
Filed — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-P1
12/30/2024
Signed off — Alteration
Installation of 5.2 kw solar energy system on roof. No change of occupancy, use or ergress.
Q01095690-I1
09/04/2024
Permit issued — Solar
Q01095690-I1-SL
08/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/16/2024
Filed — Alteration
Installation of 5.2 kw solar energy system on roof. No change of occupancy, use or ergress.
Q01095690-I1
06/25/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/25/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/21/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/20/2024
Filed — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-P2
05/10/2024
Permit issued — Plumbing
Q00925962-S2-PL
05/09/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/21/2024
Permit issued — General Construction
Q00925962-I1-MS
03/21/2024
Permit issued — General Construction
Q00925962-I1-GC
03/21/2024
Permit issued — General Construction
Q00925962-S1-GC
03/21/2024
Permit issued — General Construction
Q00925962-S1-ST
03/21/2024
Permit issued — Earth Work
Q00925962-S1-FO-EA
03/04/2024
Permit issued — Construction Fence
Q00932696-I1-FN
02/28/2024
Filed — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-S1
02/15/2024
Objection resolved — Addressed
02/14/2024
Filed — Alteration CO
PROPOSE HORIZONTAL EXTENSION FOR CONVERSION FROM ONE- TO TWO-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925962-S2
02/02/2024
Objection resolved — Addressed
02/02/2024
Objection resolved — Addressed
01/08/2024
Objection resolved — Addressed
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACCORD POWER INC09/04/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC05/10/2024
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP03/21/2024
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP03/21/2024
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP03/21/2024
DOB NOWGeneral ConstructionSigned-offL&L CONSTRUCTION DEVELOP03/21/2024
DOB NOWEarth WorkSigned-offL&L CONSTRUCTION DEVELOP03/21/2024
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP03/04/2024
1 project · most recent 09/09/2025
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2025Signed-offL&L CONSTRUCTION DEVELOPHeating Systems
Heating
Navien NCB-240/110H 110,000 BTU · Boiler ×6
1 project · most recent 09/09/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/09/2025Signed-offROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
2 projects · most recent 01/08/2025
General Wiring
FiledStatusContractorScope
01/08/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
09/03/2024CompletePOWER SURGE ELECTRIC, INC—
1 project · most recent 09/09/2025
Masonry Wood
FiledStatusContractorScope
09/09/2025Signed-offROCK E SMALL PLBG&HTG INCMasonry, Wood
1 project · most recent 09/09/2025
Earthwork
FiledStatusContractorScope
09/09/2025Signed-offROCK E SMALL PLBG&HTG INCEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/25/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/25/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2024Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
10/03/2025Fenestration areasMEHDI GHAZIenergy_progress
10/03/2025Fenestration air leakageMEHDI GHAZIenergy_progress
10/03/2025HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
10/03/2025Permanent certificateMEHDI GHAZIenergy_progress
10/03/2025Interior lighting powerMEHDI GHAZIenergy_progress
10/03/2025MeteringMEHDI GHAZIenergy_progress
10/03/2025Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
10/03/2025Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
10/03/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/03/2025Chimneys and ventsMEHDI GHAZIspecial
10/03/2025Mechanical SystemsMEHDI GHAZIspecial
10/03/2025Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
10/03/2025Heating SystemsMEHDI GHAZIspecial
10/03/2025Energy Code Compliance InspectionsMEHDI GHAZIprogress
10/03/2025FinalMEHDI GHAZIprogress
10/03/2025Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
10/03/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
10/03/2025Ventilation and air distribution systemMEHDI GHAZIenergy_progress
10/03/2025HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
10/03/2025Air barrier - visual inspectionMEHDI GHAZIenergy_progress
10/03/2025Maintenance informationMEHDI GHAZIenergy_progress
10/03/2025Insulation placement and R valuesMEHDI GHAZIenergy_progress
10/03/2025Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
10/03/2025Protection of exposed foundation insulationMEHDI GHAZIenergy_progress
09/09/2025MeteringMEHDI GHAZIenergy_progress
Latest 25 of 68.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026Q00932696-I1Request digital key ↗
08/23/2026Q00925962-P2Request digital key ↗
08/23/2026Q00925962-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00925962-P4Open ↗
08/13/2026Q00925962-I1Open ↗
08/13/2026Q00925962-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00925962-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWSpecial Inspector Seal & Signature16
08/31/2026Q00925962-P4Open ↗
08/31/2026Q00925962-P4Open ↗
08/31/2026Q00925962-P4Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q00925962-P4Open ↗
08/31/2026Q00925962-P4Open ↗
08/31/2026Q00925962-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026Q00925962-P1Open ↗
08/23/2026Q00925962-S2Open ↗
08/23/2026Q00925962-S1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00925962-I1Open ↗
08/13/2026Q00925962-P4Open ↗
08/13/2026Q00925962-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026Q00925962-P1Open ↗
08/23/2026Q00925962-S2Open ↗
08/23/2026Q00925962-S1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026Q00925962-P4Open ↗
08/13/2026Q00925962-S1Open ↗
08/13/2026Q00925962-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00925962-I1Open ↗
08/13/2026Q00925962-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01095690-I1Open ↗
▸Other Documents17
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00925962-S1Open ↗
08/13/2026Q00925962-I1Open ↗
08/13/2026Q00925962-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/13/2026Q00925962-P1Open ↗
08/13/2026Q00925962-P4Open ↗
08/13/2026Q00925962-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00925962-P4Open ↗
08/13/2026Q00925962-P1Open ↗
08/13/2026Q00925962-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/23/2026Q00925962-P1Open ↗
08/23/2026Q00925962-I1Open ↗
08/23/2026Q00925962-P4Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00925962-S1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00925962-I1Open ↗