← Back
Two family frame
148-62 262 PLACE
QUEENS · Rosedale · BIN 4291151
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3-1Zoning
3,370 sfGross Floor Area
2Units
Two family frame · 4,142 sf lot · 0.81 FAR built · Flood zone X500
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI104/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor104/11/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841104/02/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/18/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01381626-I1
04/09/2026
Permit issued — Solar
Q01381626-I1-SL
04/02/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01381626-I1
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
04/01/2026
Special inspection requirement — Final
ROBERT MASONE
04/01/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC04/09/2026
1 project · most recent 04/01/2026
FiledStatusContractorScope
04/01/2026CompleteNY SOLAR ELECTRICAL LLC—
1 project · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026Signed-offNYSS LLC40 panels, 17.6 kw, 1,290 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/02/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
04/01/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
04/01/2026Energy Code Compliance InspectionsROBERT MASONEprogress
04/01/2026FinalROBERT MASONEprogress
04/01/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01381626-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026Q01381626-I1Open ↗
09/28/2026Q01381626-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01381626-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/28/2026Q01381626-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01381626-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01381626-I1Open ↗