148 BAY 11 STREET
BROOKLYN · Bath Beach · BIN 3429629
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionGeneral
Floor 294p · 1 filing · 20 docs
Floor 195p · 1 filing · 20 docs
Cellar96p · 1 filing · 20 docs
Basement95p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B36 SERVICES303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DANIEL R. WAPNER PE., P.C.202/25/2026
BRICOLAGE DESIGNS1411/17/2025
STRUCTURAL ENGINEERING SYSTEMS, PLL109/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP203/21/2026
BRICOLAGE DESIGNS1503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B36 SERVICES INCGeneral Contractor707/08/2026
DELTAMER, INCGeneral Contractor504/09/2026
A.G.M. PLBG & HTG, INCFire Protection107/08/2026
A.G.M. PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P67381210/06/2025
Building Lifecycle
All (147)Filed (17)Permit Issued (9)Signed Off (5)Violation (3)Inspection (14)Objection (69)Special Inspection (30)
03/06/2026
Signed off — New Building
INSTALL MECHANICAL EQUIPMENT AS PER PLANS
B00885297-S4
03/02/2026
Signed off — Alteration
Installation of new curb cut
B01355497-I1
02/28/2026
Signed off — New Building
INSTALL MECHANICAL EQUIPMENT AS PER PLANS
B00885297-S3
02/28/2026
Signed off — New Building
INSTALL MECHANICAL EQUIPMENT AS PER PLANS
B00885297-S5
02/27/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/25/2026
Filed — Alteration
Installation of new curb cut
B01355497-P1
02/18/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/05/2026
Permit issued — Curb Cut
B01355497-I1-CC
02/04/2026
Filed — Alteration
Installation of new curb cut
B01355497-I1
01/14/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/14/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/08/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/24/2025
Objection resolved — Addressed
12/24/2025
Objection resolved — Addressed
11/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/25/2025
Permit issued — Mechanical Systems
B00885297-S4-MS
11/24/2025
Objection raised — Scope
11/24/2025
Objection raised — Scope
11/24/2025
Objection raised — Zoning
11/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
11/17/2025
Filed — New Building
INSTALL MECHANICAL EQUIPMENT AS PER PLANS
B00885297-S7
11/17/2025
Special inspection requirement — Fenestration areas
anthony santoro
11/17/2025
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
11/17/2025
Special inspection requirement — Maintenance information
anthony santoro
11/17/2025
Special inspection requirement — Protection of exposed foundation insulation
Younes Abouyaala
11/17/2025
Special inspection requirement — Insulation placement and R values
anthony santoro
11/17/2025
Special inspection requirement — Structural Steel - High Strength Bolting
anthony santoro
11/17/2025
Special inspection requirement — Structural Steel - Details
anthony santoro
11/17/2025
Special inspection requirement — Final
anthony santoro
11/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
11/17/2025
Special inspection requirement — Fenestration air leakage
anthony santoro
11/17/2025
Special inspection requirement — Metering
anthony santoro
11/17/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
11/17/2025
Special inspection requirement — Air barrier — testing
anthony santoro
11/17/2025
Special inspection requirement — Structural Cold-Formed Steel
anthony santoro
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
11/17/2025
Special inspection requirement — Structural Steel - Welding
anthony santoro
11/17/2025
Special inspection requirement — Wood – Seismic Resistance
anthony santoro
11/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
11/17/2025
Special inspection requirement — Footing and Foundation
anthony santoro
11/17/2025
Special inspection requirement — Permanent certificate
anthony santoro
11/17/2025
Special inspection requirement — Interior lighting power
anthony santoro
11/17/2025
Special inspection requirement — Masonry
anthony santoro
11/17/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
11/17/2025
Special inspection requirement — Subgrade Inspections
anthony santoro
11/03/2025
Objection resolved — Addressed
10/23/2025
Objection resolved — Addressed
10/16/2025
Objection raised — Scope
10/16/2025
Objection raised — Other
10/06/2025
Filed — New Building
INSTALL MECHANICAL EQUIPMENT AS PER PLANS
B00885297-P9
10/06/2025
Special inspection requirement — Air barrier - visual inspection
anthony santoro
10/06/2025
Special inspection requirement — Masonry
anthony santoro
10/06/2025
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/06/2025
Special inspection requirement — Permanent certificate
anthony santoro
09/24/2025
Objection resolved — Addressed
09/16/2025
Objection resolved — Addressed
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDELTAMER, INC02/05/2026
DOB NOWMechanical SystemsSigned-offDELTAMER, INC11/25/2025
DOB NOWGeneral ConstructionPermit IssuedDELTAMER, INC07/07/2025
DOB NOWGeneral ConstructionPermit IssuedDELTAMER, INC03/28/2025
DOB NOWStructuralPermit IssuedB36 SERVICES INC02/12/2025
DOB NOWSprinklersSigned-offA.G.M. PLBG & HTG, INC12/05/2024
DOB NOWPlumbingSigned-offA.G.M. PLUMBING & HEATING08/30/2024
DOB NOWGeneral ConstructionPermit IssuedB36 SERVICES INC02/02/2024
DOB NOWSupport of ExcavationSigned-offB36 SERVICES INC11/16/2023
1 project · most recent 11/17/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/17/2025Signed-offDELTAMER, INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2, MUZ-GS15NAHZ -U1 42,000 BTU · Condensing Unit ×3
Ventilation
Panasonic UPC885170179967 50 CFM · Exhaust Fan ×9
1 project · most recent 11/17/2025
FiledStatusContractorScope
11/17/2025Signed-offA.G.M. PLBG & HTG, INC80 heads
1 project · most recent 11/17/2025
Storm Water/Sanitary
FiledStatusContractorScope
11/17/2025Signed-offA.G.M. PLUMBING & HEATINGStorm, Water/Sanitary
1 project · most recent 10/17/2024
General Wiring
FiledStatusContractorScope
10/17/2024Permit IssuedDIDONATO & SONS ELCL CONTGeneral Wiring
1 project · most recent 11/17/2025
Steel Wood
FiledStatusContractorScope
11/17/2025Signed-offDELTAMER, INCSteel, Wood
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
02/27/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/18/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
01/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/14/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/08/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/21/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/23/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/02/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
11/17/2025Structural Cold-Formed Steelanthony santorospecial
11/17/2025Air barrier - visual inspectionanthony santoroenergy_progress
11/17/2025Air barrier — testing anthony santoroenergy_progress
11/17/2025Insulation placement and R valuesanthony santoroenergy_progress
11/17/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
11/17/2025Meteringanthony santoroenergy_progress
11/17/2025Electric vehicle service equipment requirementsanthony santoroenergy_progress
11/17/2025Fenestration air leakageanthony santoroenergy_progress
11/17/2025Fenestration areasanthony santoroenergy_progress
11/17/2025Maintenance informationanthony santoroenergy_progress
11/17/2025Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
11/17/2025Interior lighting poweranthony santoroenergy_progress
11/17/2025Permanent certificateanthony santoroenergy_progress
11/17/2025Finalanthony santoroprogress
11/17/2025Footing and Foundationanthony santoroprogress
11/17/2025Fire-Resistance Rated Constructionanthony santoroprogress
11/17/2025Energy Code Compliance Inspectionsanthony santoroprogress
11/17/2025Structural Steel - Detailsanthony santorospecial
11/17/2025Wood – Seismic Resistanceanthony santorospecial
11/17/2025Structural Steel - Weldinganthony santorospecial
11/17/2025Structural Steel - High Strength Boltinganthony santorospecial
11/17/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
11/17/2025Concrete - Cast-In-Placeanthony santorospecial
11/17/2025Masonryanthony santorospecial
11/17/2025Subgrade Inspectionsanthony santorospecial
Latest 25 of 106.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/19/2026B00885297-P6Request digital key ↗
08/19/2026B00885297-S7Request digital key ↗
08/19/2026B00885297-S3Request digital key ↗
Showing 3 of 17 on file for this type
▸Zoning, Tax Lot & Property Records21
▸DOB NOWRestrictive Declaration/Easement 110
08/13/2026B00885297-P2Open ↗
08/13/2026B00885297-S5Open ↗
08/13/2026B00885297-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00885297-P6Open ↗
08/13/2026B00885297-I1Open ↗
08/13/2026B00885297-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00885297-P2Open ↗
08/13/2026B00885297-I1Open ↗
08/13/2026B00885297-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00885297-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/19/2026B00885297-I1Open ↗
08/19/2026B00885297-S1Open ↗
08/19/2026B00885297-S2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B00885297-I1Open ↗
09/02/2026B00885297-I1Open ↗
09/02/2026B00885297-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B00885297-S3Open ↗
09/02/2026B00885297-I1Open ↗
09/02/2026B00885297-I1Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00885297-I1Open ↗
08/13/2026B00885297-P9Open ↗
08/13/2026B00885297-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/19/2026B00885297-P6Open ↗
08/15/2026B00885297-I1Open ↗
08/15/2026B00885297-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00885297-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026B00885297-I1Open ↗
▸Other Documents17
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026B00885297-P1Open ↗
08/13/2026B00885297-P2Open ↗
08/13/2026B00885297-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026B00885297-P1Open ↗
08/13/2026B00885297-I1Open ↗
08/13/2026B00885297-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/19/2026B00885297-P6Open ↗
08/15/2026B00885297-I1Open ↗
08/15/2026B00885297-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00885297-S2Open ↗
▸DOB NOWFinal Survey1
08/15/2026B00885297-I1Open ↗