← Back
One story retail building
148 GREEN STREET
BROOKLYN · BIN 3064143
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
M1-2/R6AZoning
17,200 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: GREEN ART HOLDINGS LLC · 17,215 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionOther
Roof5p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 7 docs
Floor 111p · 3 filings · 20 docs
Mezzanine3p · 2 filings · 20 docs
Cellar9p · 3 filings · 20 docs
Basement2p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENSTREETKITCHEN3907/08/2026
DHI CONSTRUCTION SVCS103/22/2026
GREEN ART HOLDINGS1603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/19/2017$18.0M—SOUTH CHINA IMPORT, INC. → GREEN ART HOLDINGS LLC$1,047/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1403/21/2026
JAM CONSULTANTS, INC.403/21/2026
I L CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LORZA RENOVATION INCGeneral Contractor1107/08/2026
ASE HVAC INCGeneral Contractor207/08/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
ARANDA PLBG & HTG CORPPlumbing207/08/2026
DYNAMIC PLBNG SPRKR CORPlumbing203/22/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803203/14/2023
TSF ENGINEERING, PC1274403/14/2023
CORTNEY WALLESTON ARCHITE3881202/14/2023
IVAN DESIGN ENGINEERING &6983602/07/2023
Building Lifecycle
All (129)Filed (19)Permit Issued (9)Signed Off (5)Violation (15)Inspection (11)Objection (40)Special Inspection (30)
07/29/2026
Objection resolved — Resolved
06/03/2026
Filed — Full Demolition
Full demolition of one story building using hand held equipment. Mechanical means to assist with removal of foundations, load out debris and back-fill site only.
B01392046-S2
05/21/2026
Objection raised — Other
05/07/2026
Filed — Full Demolition
Full demolition of one story building using hand held equipment. Mechanical means to assist with removal of foundations, load out debris and back-fill site only.
B01392046-I1
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing Buildings
06/24/2024
Signed off — Alteration
INSTALLATION OF EXHAUST FAN HOODS FOR RESTAURANT AND HVAC SYSTEM IN RETAIL B AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00561550-I1
06/20/2024
Signed off — Alteration
MODIFICATION OF SPRINKLER SYSTEM IN RETAIL B IN CONJUNCTION WITH CO #B00498076. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00561546-I1
05/30/2024
Signed off — Alteration
Plumbing work to install new fixtures for the Restaurant in Retail B as per the plans filed herewith. No change in use, egress or occupancy.
B00561553-I1
04/03/2024
Signed off — Alteration
FOUNDATION WORK IN CONJUNCTION WITH MAIN ALT 1 APPLICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00591903-I1
04/03/2024
Signed off — Alteration
STRUCTURAL FRAMING WORK FOR ROOF DUNNAGE AND ROOF SUPPORT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00591872-I1
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
03/26/2024
Violation issued (FDNY_ORDER, closed)
02/21/2024
Violation issued (FDNY_NOV, closed)
01/09/2024
Objection resolved — Addressed
11/03/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/03/2023
Objection raised — Admin
11/01/2023
Filed — Alteration
Plumbing work to install new fixtures for the Restaurant in Retail B as per the plans filed herewith. No change in use, egress or occupancy.
B00561553-P2
10/19/2023
Violation issued (FDNY_ORDER, closed)
10/03/2023
Special inspection requirement — Sprinkler Systems
Nicholas Tucci
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tucci
10/03/2023
Special inspection requirement — Fenestration areas
Cortney Walleston
10/03/2023
Special inspection requirement — Interior lighting power
Cortney Walleston
10/03/2023
Special inspection requirement — Metering
Cortney Walleston
10/03/2023
Special inspection requirement — Lighting controls
Cortney Walleston
10/03/2023
Special inspection requirement — Exterior lighting power
Cortney Walleston
10/03/2023
Special inspection requirement — Fenestration air leakage
Cortney Walleston
10/03/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Cortney Walleston
10/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
Cortney Walleston
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cortney Walleston
10/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Cortney Walleston
09/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2023
Objection resolved — Addressed
09/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection resolved — Addressed
09/05/2023
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
08/30/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/30/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/25/2023
Objection raised — Fire_Protection
08/25/2023
Objection raised — Structural
08/25/2023
Objection raised — Fire_Protection
08/25/2023
Objection raised — Structural
07/11/2023
Permit issued — Sprinklers
B00561546-I1-EW-SP
06/02/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/09/2023
Objection raised — Scope
05/02/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tucci
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL07/11/2023
DOB NOWFoundationSigned-offLORZA RENOVATION INC03/14/2023
DOB NOWGeneral ConstructionPermit IssuedLORZA RENOVATION INC03/14/2023
DOB NOWMechanical SystemsSigned-offLORZA RENOVATION INC03/14/2023
DOB NOWStructuralSigned-offLORZA RENOVATION INC08/12/2022
DOB NOWGeneral ConstructionPermit IssuedLORZA RENOVATION INC02/24/2022
DOB NOWGeneral ConstructionPermit IssuedASE HVAC INC01/19/2022
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP09/23/2021
DOB NOWConstruction FencePermit IssuedCS BRIDGE CORP04/17/2019
BIS—ISSUEDHICK HOLDINGS, INC02/25/2022
BIS—ISSUEDHICK HOLDINGS, INC09/20/2021
BIS—ISSUEDHICK HOLDINGS, INC08/18/2021
BIS—ISSUEDDHI CONSTRUCTION SVCS INC07/07/2020
BISOTISSUEDHICK HOLDINGS, INC12/04/2019
BIS—ISSUEDDHI CONSTRUCTION SVCS INC06/14/2019
BISSPISSUEDMEGA PLBG CORP04/18/2019
BISPLISSUEDCOPPER PLUMBING INC03/11/2019
BIS—ISSUEDDHI CONSTRUCTION SVCS INC03/04/2019
BISPLISSUEDCOPPER PLUMBING INC11/20/2018
BISOTISSUEDDHI CONSTRUCTION SVCS INC11/14/2018
BISOTISSUEDALDA BUILDING COMPANY LLC09/28/2018
4 jobs · most recent 09/17/2026
General Wiring
FiledStatusContractorScope
09/17/2026Permit IssuedRICHARD NEU—
07/31/2023Permit IssuedN.Z. PILGRIM ELECTRIC INCGeneral Wiring
10/10/2019CompleteSPIRELLI ELECTRIC INC1 meters, 1 new_meters
11/19/2018CompleteSPIRELLI ELECTRIC INCGeneral Wiring
1 job · most recent 06/03/2026
Fence
FiledStatusContractorScope
06/03/2026——Fence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/03/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/05/2023Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2023Fail-Final CND-Occupancy InspectionFailView ↗
04/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
05/07/2026Structural Stability – Alterations of existing Buildings—special
10/03/2023Sprinkler SystemsNicholas Tuccispecial
10/03/2023Fire-Resistant Penetrations and JointsNicholas Tuccispecial
10/03/2023Fenestration areasCortney Wallestonenergy_progress
10/03/2023Interior lighting powerCortney Wallestonenergy_progress
10/03/2023MeteringCortney Wallestonenergy_progress
10/03/2023Lighting controlsCortney Wallestonenergy_progress
10/03/2023Exterior lighting powerCortney Wallestonenergy_progress
10/03/2023Fenestration air leakageCortney Wallestonenergy_progress
10/03/2023Fenestration and door U-factor and product ratingsCortney Wallestonenergy_progress
10/03/2023Fire-Resistance Rated ConstructionCortney Wallestonprogress
10/03/2023Fire-Resistant Penetrations and JointsCortney Wallestonspecial
10/03/2023Energy Code Compliance InspectionsCortney Wallestonprogress
03/22/2023HVAC-R and service water heating equipmentNicholas Tuccienergy_progress
03/22/2023Chimneys and ventsSAMI HAJJAR P.Especial
03/22/2023Fire-Resistant Penetrations and JointsNicholas Tuccispecial
03/22/2023Mechanical SystemsNicholas Tuccispecial
03/22/2023Energy Code Compliance InspectionsNicholas Tucciprogress
03/22/2023Fire-Resistance Rated ConstructionNicholas Tucciprogress
03/22/2023FinalNicholas Tucciprogress
03/22/2023HVAC-R and service water heating system controlsNicholas Tuccienergy_progress
03/22/2023Shutoff dampersNicholas Tuccienergy_progress
03/22/2023HVAC-R and service water piping design and insulationNicholas Tuccienergy_progress
03/22/2023Maintenance informationNicholas Tuccienergy_progress
03/14/2023Maintenance informationNicholas Tuccienergy_progress
Latest 25 of 58.
▾Documents — 283 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch15
09/01/2026B00561546-I1Request digital key ↗
09/01/2026B00561546-P1Request digital key ↗
09/01/2026B00561553-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
09/02/2026B00274986-I1Request digital key ↗
09/02/2026B00325088-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/30/2026B00702000-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00110324-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION17
08/03/2022322059035Open ↗
07/29/2022322015118Open ↗
07/22/2022322015118Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION14
08/19/2021322059035Open ↗
08/10/2021322059035Open ↗
05/04/2021322059035Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
10/17/2019322059035Open ↗
09/27/2019322060568Open ↗
09/26/2019322059035Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/21/2018322059035Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/20/2022322059035Open ↗
▸BISZONING DIAGRAM1
01/10/2019322059035Open ↗
▸Seals & Professional Certifications93
▸DOB NOWSpecial Inspector Seal & Signature27
08/31/2026B00591872-I1Open ↗
08/31/2026B00591872-I1Open ↗
08/31/2026B00591872-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
09/25/2026B00702000-I1Open ↗
08/31/2026B00591872-I1Open ↗
08/30/2026B00561550-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
02/12/2021322059035Open ↗
12/04/2019322060568Open ↗
12/04/2019322060568Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/02/2026B00110324-I1Open ↗
09/01/2026B00561546-P1Open ↗
09/01/2026B00561546-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/04/2019322015118Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/04/2019322015118Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/21/2018322059035Open ↗
08/17/2018321827519Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/03/2020322059035Open ↗
▸BISEQUIPMENT USE PERMITS1
09/03/2020322059035Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/18/2020322060559Open ↗
▸Safety & Tenant Protection23
▸DOB NOWHPD-1: Anti-Harassment Area Checklist12
09/01/2026B00591903-P1Open ↗
08/15/2026B00561550-I1Open ↗
08/15/2026B00561550-P1Open ↗
Showing 3 of 12 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
03/04/2019322059035Open ↗
03/04/2019322059035Open ↗
03/04/2019322059035Open ↗
▸BISANTI-HARASSMENT CHECKLIST3
12/05/2019322015118Open ↗
02/13/2019322059035Open ↗
09/13/2018321827519Open ↗
▸BISSTREET TREE CHECKLIST2
02/28/2019322059035Open ↗
11/21/2018322059035Open ↗
▸DOB NOWStreet Tree Checklist2
08/27/2026B00498076-I1Open ↗
08/15/2026B00498076-P1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/04/2019322059035Open ↗
▸Environmental & Asbestos27
▸DOB NOWOER: Notice to Proceed14
09/01/2026B00591903-P1Open ↗
08/15/2026B00561550-I1Open ↗
08/15/2026B00561550-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/15/2026B00561550-I1Open ↗
08/14/2026B00591903-I1Open ↗
08/13/2026B00591872-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
10/11/2022322015118Open ↗
05/05/2022322060568Open ↗
10/26/2020322059035Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026B00498076-I1Open ↗
08/15/2026B01392046-I1Open ↗
08/15/2026B00498076-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
02/13/2019322059035Open ↗
08/23/2018321827519Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
09/10/2018321827519Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
02/12/2021322059035Open ↗
03/08/2019322059035Open ↗
03/04/2019322059035Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/04/2019322059035Open ↗
11/29/2019322059035Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00561550-I1Open ↗
08/13/2026B00498076-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/03/2020322059035Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/11/2022322015118Open ↗
07/12/2022322015118Open ↗
09/21/2020322059035Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSOIL REPORT2
09/01/2026B00591903-P1Open ↗
08/14/2026B00591903-I1Open ↗
▸BISTECHNICAL REPORT: EXT. WALLS & APPURTS1
11/29/2019322059035Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026B00591903-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/14/2026B00591903-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
10/27/2022322015118Open ↗
05/26/2022322060568Open ↗
02/12/2021322059035Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
02/14/2019322059035Open ↗
11/21/2018322059035Open ↗
▸BISSUPERSEDING LETTER1
11/21/2018321827519Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/14/2018322059035Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT10
05/05/2022322060568Open ↗
09/18/2020322060559Open ↗
09/03/2020322059035Open ↗
Showing 3 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
08/19/2021322059035Open ↗
06/17/2019322059035Open ↗
03/04/2019322059035Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
08/19/2021322059035Open ↗
03/04/2019322059035Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
10/11/2022322015118Open ↗
▸Filing & Intake Forms16
▸BISEFILING COVER SHEET8
12/04/2019322015118Open ↗
12/07/2018322059035Open ↗
11/23/2018322060559Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION6
10/26/2020322059035Open ↗
12/04/2019322015118Open ↗
10/30/2019322059035Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
08/19/2021322059035Open ↗
08/10/2021322059035Open ↗
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
11/04/2020322059035Open ↗
11/04/2020322059035Open ↗
09/18/2020322059035Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSURVEY: INITIAL2
08/13/2026B00498076-I1Open ↗
08/13/2026B00498076-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00498076-I1Open ↗
08/13/2026B00498076-P1Open ↗
▸DOB NOWPD1 Document2
08/13/2026B00498076-I1Open ↗
08/13/2026B00498076-P1Open ↗
▸BISPLOT DIAGRAM1
11/21/2018322059035Open ↗
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026B00110324-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01392046-I1Open ↗
▸DOB NOWStructure Photographs1
08/15/2026B01392046-I1Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026B00110324-I1Open ↗