← Back
Two family converted from one family
148 HALSEY STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3053034
💬 Discuss this project
1884Year Built
3Stories
B3Building Class
R6BZoning
3,068 sfGross Floor Area
2Units
Rent Stabilized8 Open Violations ▸FDNY Report ↗
Two family converted from one family · 1,917 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS J. CURRO ARCHITECT, PC104/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. MARIN RESTORATION INCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS J. CURRO ARCHITECT718104/25/2024
Building Lifecycle
All (27)Filed (1)Permit Issued (1)Signed Off (1)Violation (17)Special Inspection (7)
05/04/2026
Violation issued (HPD, open)
A
06/09/2025
Violation issued (HPD, open)
A
08/05/2024
Signed off — Alteration
Repairs to damaged rear facade and replacement of damaged rear exterior windows at 1st and 2nd floors from fallen tree. No change in use, egress or occupancy.
B00994433-I1
04/29/2024
Permit issued — General Construction
B00994433-I1-GC
04/25/2024
Filed — Alteration
Repairs to damaged rear facade and replacement of damaged rear exterior windows at 1st and 2nd floors from fallen tree. No change in use, egress or occupancy.
B00994433-I1
04/10/2024
Violation issued (HPD, open)
A
01/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
01/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
THOMAS CURRO
01/23/2024
Special inspection requirement — Final
THOMAS CURRO
01/23/2024
Special inspection requirement — Insulation placement and R values
THOMAS CURRO
01/23/2024
Special inspection requirement — Air barrier - visual inspection
THOMAS CURRO
01/23/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS CURRO
01/23/2024
Special inspection requirement — Fenestration air leakage
THOMAS CURRO
12/19/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/18/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/18/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/20/2023
Violation issued (HPD, closed)
I
03/23/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, open)
A
04/09/2021
Violation issued (HPD, open)
A
04/09/2021
Violation issued (HPD, closed)
I
10/30/2019
Violation issued (HPD, closed)
I
10/17/2018
Violation issued (HPD, closed)
I
11/09/2016
Violation issued (HPD, closed)
I
02/20/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offM. MARIN RESTORATION INC04/29/2024
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/23/2024Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
01/23/2024Structural Stability – Alterations of existing buildingsTHOMAS CURROspecial
01/23/2024FinalTHOMAS CURROprogress
01/23/2024Insulation placement and R valuesTHOMAS CURROenergy_progress
01/23/2024Air barrier - visual inspectionTHOMAS CURROenergy_progress
01/23/2024Fenestration and door U-factor and product ratingsTHOMAS CURROenergy_progress
01/23/2024Fenestration air leakageTHOMAS CURROenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026B00994433-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026B00994433-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature5
09/21/2026B00994433-I1Open ↗
09/21/2026B00994433-I1Open ↗
09/21/2026B00994433-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/21/2026B00994433-I1Open ↗
09/21/2026B00994433-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B00994433-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00994433-I1Open ↗