Stephen Gaynor School
148 WEST 90TH STREET · BIN 1087310
💬 Discuss this project
2005Year Built
12Stories
RABuilding Class
R7-2Zoning
37,756 sfGross Floor Area
2Units
LL97 Covered0 Active Violations 3 likely answered 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Condo, cultural / medical / educational · 6,545 sf lot · 5.77 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsStephen Gaynor SchoolUnder Construction1 filing
RoofStephen Gaynor School1 filing · 2 docs
Floor 12Stephen Gaynor School1 filing · 2 docs
Floor 11Stephen Gaynor School1 filing · 2 docs
Floor 10Stephen Gaynor School1 filing · 2 docs
Floor 9Stephen Gaynor School1 filing · 2 docs
Floor 8Stephen Gaynor School1 filing · 2 docs
Floor 7Stephen Gaynor School1 filing · 2 docs
Floor 6Stephen Gaynor School1 filing · 2 docs
Floor 5
Floor 4
Floor 3
Floor 2Stephen Gaynor School1p · 1 filing · 5 docs
Floor 1Stephen Gaynor School1 filing · 5 docs
CellarRemove existing fuel oil storage tank1 filing
Site & exteriorStephen Gaynor School3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cocodrillo Development4003/21/2026
Stephen Gaynor School3307/08/2026
Holy Name of Jesus-St Gregory the G210/04/2026
NYC Department of Housing Preservation and Development203/21/2026
Phoenix103/21/2026
Madison 92 St Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bazini Engineering107/13/2026
Polise Consulting Engineers204/23/2026
Paul Perdek, Prof. Engineering207/24/2024
Midtown Preservation106/12/2024
Rogers108/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Design 2147403/21/2026
AE Design Solution603/21/2026
Midtown Preservation Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Evergreen MechanicalPlumbing407/08/2026
Empire NY InstallationsScaffold407/08/2026
Bravo General ContractorGeneral Contractor303/21/2026
Allstate Electrical ContElectrical203/21/2026
Demari ServicesGeneral Contractor107/08/2026
JT Magen & CompanyGeneral Contractor105/15/2026
Mega Electrical ContractingElectrical103/22/2026
Electric EssentialsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Engineering678104/23/2026
Building Lifecycle
All (73)Filed (8)Permit Issued (8)Signed Off (7)Facade (FISP) (6)Violation (33)Inspection (3)Objection (2)Special Inspection (6)
10/02/2026
Signed off — Alteration
REMOVE EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01429139-I1
07/13/2026
Filed — Alteration
REMOVE EXISTING FUEL OIL STORAGE TANK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01429139-I1
07/13/2026
Permit issued — Boiler Equipment
M01429139-I1-BE
05/13/2026
Permit issued — Mechanical Systems
M01369144-I1-MS
04/23/2026
Filed — Alteration
HEREWITH FILING MECHANICAL WORK AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01369144-I1
03/09/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
03/09/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
03/09/2026
Special inspection requirement — Final
Ari Kamo
03/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Ari Kamo
12/08/2025
Signed off — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS.
M00912975-S1
12/05/2025
Signed off — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS.
M00912975-I1
09/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/25/2025
Permit issued — Plumbing
M00912975-S1-PL
07/03/2025
Violation issued (FDNY_NOV, closed)
07/03/2025
Violation issued (FDNY_ORDER, closed)
07/03/2025
Violation issued (FDNY_ORDER, closed)
07/03/2025
Violation issued (FDNY_ORDER, closed)
04/07/2025
Violation issued (FDNY_NOV, closed)
09/24/2024
Signed off — Alteration
FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01060619-I1
09/17/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01074104-I1
09/17/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01074125-I1
09/17/2024
Signed off — Alteration
M01080429-I1
08/09/2024
Permit issued — General Construction
M01060619-I1-GC
07/25/2024
Permit issued — Suspended Scaffold
M01080429-I1-SC
07/24/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01074125-I1
07/24/2024
Permit issued — Supported Scaffold
M01074125-I1-SF
07/23/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01074104-I1
07/23/2024
Permit issued — Sidewalk Shed
M01074104-I1-SH
07/18/2024
Filed — Alteration
M01080429-I1
06/21/2024
Objection raised — Scope
06/21/2024
Objection resolved — Addressed
06/12/2024
Filed — Alteration
FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01060619-I1
06/05/2024
Special inspection requirement — Final
KATHLEEN NEEDHAM-INOCCO
08/24/2023
Permit issued — General Construction
M00912975-I1-GC
08/18/2023
Violation issued (FDNY_NOV, closed)
08/16/2023
Filed — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS.
M00912975-S1
08/03/2023
Filed — Alteration
FILING HEREWITH PLUMBING WORK AS PER PLANS.
M00912975-I1
08/01/2023
Special inspection requirement — Final
RICHARD GREENWALD
06/01/2023
Cycle 9 facade report signed — SWARMP
02/17/2023
Cycle 9 facade report submitted
02/06/2023
Cycle 9 facade inspection completed
04/05/2022
Violation issued (FDNY_NOV, closed)
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2019
Violation issued (FDNY_NOV, closed)
12/01/2018
Cycle 8 facade report signed — SAFE
11/14/2018
Violation issued (FDNY_NOV, closed)
02/21/2018
Cycle 8 facade report submitted
01/19/2018
Cycle 8 facade inspection completed
06/07/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/03/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/17/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/22/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/22/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn07/13/2026
DOB NOWMechanical SystemsPermit IssuedJT Magen & Company05/13/2026
DOB NOWPlumbingSigned-offEvergreen Mechanical08/25/2025
DOB NOWGeneral ConstructionSigned-offDemari Services08/09/2024
DOB NOWSuspended ScaffoldPermit IssuedDemari Services07/25/2024
DOB NOWSupported ScaffoldSigned-offEmpire NY Installations I07/24/2024
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I07/23/2024
DOB NOWGeneral ConstructionSigned-offBravo General Contractor08/24/2023
BISPLISSUEDDemar Plumbing04/16/2019
BISOTISSUEDCanido Basonas Construction07/27/2017
BISEQISSUEDPhoenix Sutton STR06/30/2017
BISMHISSUEDDonnelly Mechanical03/07/2016
BIS—ISSUEDShawmut Woodworking & Supply07/05/2013
BISOTISSUEDShawmut Woodworking & Supply03/12/2013
BISOTISSUEDA.W. & S. Construction Co07/27/2011
BISOTISSUEDA.W. & S. Construction Co07/27/2011
BISEQISSUEDS&E Bridge & Scaffold07/25/2008
BISPLISSUEDDC Building Services02/09/2007
BISSDISSUEDEmpire Water Main & Sewer I02/02/2007
BISSPISSUEDEmpire Water Main & Sewer I01/10/2007
BISEQISSUEDTurner Construction Company11/08/2006
BISOTISSUEDConstruction Services Associates11/01/2006
BISBLISSUEDMetropolitan Heat & Power Co05/17/2006
BISFSISSUEDMetropolitan HT & Power Co05/16/2006
BISEQISSUEDRegional Scaff. Hoist. Co05/01/2006
BISEQISSUEDRegional Scaffold & Hoisting Co04/25/2006
BISMHISSUEDTurner Construction Company04/04/2006
BISEQISSUEDRegional Scaffold & Hoisting Co01/03/2006
BISEQISSUEDTurner Construction Company10/25/2005
BISSPISSUEDNew Era Mechanical Service06/16/2005
BISEQISSUEDRegional Scaff. Hoist. Co06/02/2005
BISEQISSUEDRegional Scaffold & Hoisting Co04/15/2005
BISPLISSUEDTri City Mechanical Group02/18/2005
BIS—ISSUEDTurner Construction Company01/06/2005
BISEQISSUEDTurner Construction Company01/06/2005
BIS—ISSUEDTurner Construction Company11/15/2004
BISPLISSUEDCresent Contracting06/21/2004
BISOTISSUEDJohn Civetta & Sons06/17/2004
BISEQISSUEDJohn Civetta & Sons06/17/2004
BISOTISSUEDJohn Civetta & Sons01/05/2004
+ 1 more permits on file
1 project · most recent 04/23/2026
Air Conditioning Systems Cooling Towers Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
04/23/2026Permit IssuedJT Magen & CompanyAir Conditioning Systems, Cooling Towers, Heating Systems
Cooling
Mammoth V-CUBE 30 tons ×2
Trane HORIZON N420 35 tons ×1
HORIZON N540 45 tons ×1
Heating
Mammoth V-CUBE 2,000,000 BTU ×2
Trane HORIZON N420 400,000 BTU ×1
HORIZON N540 350,000 BTU ×1
Cooling Tower
Evapco LSTA-4-91 83 tons · Condensing Unit ×1
5 projects · most recent 06/12/2026
General Wiring
FiledStatusContractorScope
06/12/2026CompleteM.C. Electrical NY—
01/30/2026CompleteAllstate Electrical ContGeneral Wiring
07/12/2024CompleteTitan Electrical & Elev ContractingGeneral Wiring
07/02/2024CompleteMega Electrical Contracting—
08/13/2021CompleteE-J Electric Installation CoGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/09/2026Mechanical SystemsAri Kamospecial
03/09/2026Post-installed AnchorsAri Kamospecial
03/09/2026FinalAri Kamoprogress
03/09/2026Energy Code Compliance InspectionsAri Kamoprogress
06/05/2024FinalKATHLEEN NEEDHAM-INOCCOprogress
08/01/2023FinalRICHARD GREENWALDprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Stephen Gaynor SchoolEducationEntire building
Project M01369144 Alteration · Permit Entire · 04/23/2026
Project M01074125 Alteration · LOC Issued · 07/24/2024
Project M01074104 Alteration · LOC Issued · 07/23/2024
Project M01080429 Alteration · LOC Issued · 07/18/2024
Project M01060619 Alteration · LOC Issued · 06/12/2024
Project M00912975 Alteration · LOC Issued · 08/03/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 154 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026M00912975-I1Request digital key ↗
08/29/2026M00912975-S1Request digital key ↗
08/27/2026M01060619-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION15
04/16/2019123598044Open ↗
08/03/2017123301015Open ↗
06/27/2017140658205Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION9
04/17/2019123598044Open ↗
08/03/2017123301015Open ↗
06/27/2017140658205Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications45
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
04/16/2019123598044Open ↗
09/28/2018140658205Open ↗
08/03/2017123301015Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
04/16/2019123598044Open ↗
08/03/2017123301015Open ↗
03/18/2016122671750Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/29/2026M00912975-S1Open ↗
08/29/2026M00912975-I1Open ↗
08/27/2026M01060619-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
02/25/2013121539219Open ↗
07/22/2011120777999Open ↗
07/22/2011120777999Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/16/2019123598044Open ↗
08/03/2017123301015Open ↗
06/27/2017140658205Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026M01060619-I1Open ↗
08/27/2026M00912975-I1Open ↗
08/23/2026M01369144-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2017140658205Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2017140658205Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026M01369144-I1Open ↗
▸Trade Schedules & Equipment3
▸BISFA - FDNY APPROVAL : FD-FAA1
07/08/2014121743211Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/16/2019123598044Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/25/2016122671750Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
06/27/2013121397201Open ↗
10/26/2012121397201Open ↗
▸BISTenant Protection Plan and Notes1
08/02/2017123301015Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/18/2016122671750Open ↗
08/16/2013121743211Open ↗
07/22/2011120777999Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
06/25/2013121397201Open ↗
02/28/2013121539219Open ↗
▸BISTHIS IS NOT AN ASBESTOS PROJECT2
07/29/2011120777999Open ↗
07/29/2011120777999Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
07/25/2008110293281Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026M01369144-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
04/16/2019123598044Open ↗
08/03/2017123301015Open ↗
05/31/2016122671750Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
05/31/2016122671750Open ↗
10/11/2013121539219Open ↗
10/03/2013121397201Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/28/2013121397201Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/27/2017140658205Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/27/2017140658205Open ↗
▸Approvals, Objections & Sign-offs15
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/28/2018140658205Open ↗
05/31/2016122671750Open ↗
09/26/2014120777999Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/29/2026M00912975-I1Open ↗
08/29/2026M00912975-S1Open ↗
08/17/2026M01369144-I1Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
02/25/2013121539219Open ↗
10/16/2012121397201Open ↗
07/22/2011120777999Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
10/26/2012121397201Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
04/16/2019123598044Open ↗
08/03/2017123301015Open ↗
05/31/2016122671750Open ↗
Showing 3 of 14 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
06/28/2017140658205Open ↗
06/28/2017140658205Open ↗
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET9
04/16/2019123598044Open ↗
08/03/2017123301015Open ↗
03/18/2016122671750Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION2
11/15/2019123598044Open ↗
08/22/2019123598044Open ↗
▸BISeFiling Job Application Cover Sheet2
07/25/2008110293281Open ↗
06/27/2017140658205Open ↗
▸BISBOROUGH INTAKE FORM1
09/28/2018140658205Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/15/2019123598044Open ↗
07/27/2017123301015Open ↗
▸BISPLOT DIAGRAM1
10/26/2012121397201Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01080429-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01080429-I1Open ↗