← Back
Elevator apt, miscellaneous
1481 PARK AVENUE
MANHATTAN · East Harlem (South) · BIN 1078926
💬 Discuss this project
1963Year Built
18Stories
D9Building Class
R7-2Zoning
257,548 sfGross Floor Area
279Units
LL97 Covered7 Open Violations 4 unresolved · 3 paperwork only ▸
Elevator apt, miscellaneous · Owner of record: NYC HOUSING AUTHORITY · 81,741 sf lot · 3.15 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalGeneral
Roof4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA707/08/2026
NYC HOUSING AUTHORITY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DEWBERRY ENGINEERS INC201/15/2025
STEPHEN B JACOBS GROUP511/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES LLC203/21/2026
STEPHEN B JACOBS GROUP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROMA SCAFFOLDING INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106310/15/2024
Building Lifecycle
All (33)Filed (7)Permit Issued (2)Signed Off (1)Objection (2)Special Inspection (21)
03/14/2025
Signed off — Alteration
REMOVE AND REPLACE EXISTING ROOF ASSEMBLY AS NOTED ON DRAWINGS PROVIDED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00708674-I1
01/15/2025
Filed — Alteration
M01135642-S1
01/15/2025
Filed — Alteration
M01135642-I1
11/22/2024
Permit issued — General Construction
M00708674-I1-GC
11/14/2024
Filed — Alteration
REMOVE AND REPLACE EXISTING ROOF ASSEMBLY AS NOTED ON DRAWINGS PROVIDED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00708674-P4
11/07/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
11/07/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
11/07/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
11/07/2024
Special inspection requirement — Subgrade Inspections
11/07/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
10/31/2024
Special inspection requirement — Final
10/15/2024
Filed — Alteration
REMOVE AND REPLACE EXISTING ROOF ASSEMBLY AS NOTED ON DRAWINGS PROVIDED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00708674-P3
10/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
10/14/2024
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
10/14/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
10/14/2024
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
06/24/2024
Filed — Alteration
REMOVE AND REPLACE EXISTING ROOF ASSEMBLY AS NOTED ON DRAWINGS PROVIDED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00708674-P2
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
05/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
05/02/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
05/02/2024
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
05/02/2024
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
12/14/2023
Permit issued — General Construction
M00708674-I1-GC
12/13/2023
Filed — Alteration
REMOVE AND REPLACE EXISTING ROOF ASSEMBLY AS NOTED ON DRAWINGS PROVIDED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00708674-P1
12/12/2023
Special inspection requirement — Masonry
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Insulation placement and R values
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Final
GEORGE GHEBRYAL
12/12/2023
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
05/03/2022
Objection resolved — Addressed
04/27/2022
Objection raised — Scope
04/25/2022
Filed — Alteration
REMOVE AND REPLACE EXISTING ROOF ASSEMBLY AS NOTED ON DRAWINGS PROVIDED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00708674-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC11/22/2024
DOB NOWGeneral ConstructionSigned-offROMA SCAFFOLDING INC12/14/2023
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/07/2024Excavations - Sheeting, Shoring, and Bracing—special
11/07/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
11/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
11/07/2024Subgrade Inspections—special
11/07/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
10/31/2024Final—progress
10/14/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
10/14/2024Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
10/14/2024FinalGEORGE GHEBRYALprogress
10/14/2024Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
05/02/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
05/02/2024Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
05/02/2024FinalGEORGE GHEBRYALprogress
05/02/2024Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
05/02/2024Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
12/12/2023MasonryGEORGE GHEBRYALspecial
12/12/2023Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/12/2023Insulation placement and R valuesGEORGE GHEBRYALenergy_progress
12/12/2023Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
12/12/2023FinalGEORGE GHEBRYALprogress
12/12/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/02/2026M00708674-P3Request digital key ↗
09/02/2026M00708674-P2Request digital key ↗
09/02/2026M00708674-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/02/2026M00708674-I1Open ↗
09/02/2026M00708674-P3Open ↗
09/02/2026M00708674-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026M00708674-P2Open ↗
08/28/2026M00708674-P2Open ↗
08/24/2026M00708674-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026M00708674-P2Open ↗
08/24/2026M00708674-P1Open ↗
08/23/2026M00708674-P3Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/02/2026M00708674-P3Open ↗
09/02/2026M00708674-P2Open ↗
09/02/2026M00708674-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00708674-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
09/02/2026M00708674-P3Open ↗
09/02/2026M00708674-P2Open ↗
09/02/2026M00708674-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026M00708674-I1Open ↗