—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
3 Active Violations 4 old, status unconfirmed ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsAlchemy-abr PartnersUnder Construction4 filings
RoofTemporary roof protection and hoisting equipmentUnder Construction1p · 1 filing
Floor 32Temporary roof protection and hoisting equipmentUnder Construction1p · 1 filing
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Sprinkler system removal and demolition1 filing
Floor 1Brand Access Solutions overhead protectionUnder Construction4 filings · 2 docs
CellarSprinkler system removal and demolition1 filing
Site & exteriorTemporary roof protection and hoisting equipmentUnder Construction1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. Blinn Consulting1010/16/2026
Nomad R&D209/25/2026
Meyers+ Engineers708/19/2026
JRS Engineering Services107/20/2026
Thomas Ammiano105/26/2026
McNamara Salvia of New York502/10/2026
Mueser Rutledge Consulting Engineering501/11/2026
Luca Senatore201/05/2026
Hansen Engineering107/24/2025
Ancora Engineering101/31/2025
Leo Hill111/25/2024
Enthink Engineers209/08/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E Bridge & ScaffoldScaffold709/16/2026
Cma Plumbing & HeatingFire Protection610/07/2026
Monadnock ConstructionGeneral Contractor410/01/2026
Monadnock ConstructionScaffold307/29/2026
Mill Brook Fire ProtectionFire Protection310/02/2026
R.C. StructuresScaffold208/05/2026
Hexagon GroupScaffold209/26/2026
Donato Plumbing GroupPlumbing206/27/2026
Reliable EnterprisesScaffold106/27/2026
Eastern AirGeneral Contractor110/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Leo Y Lee Associates2481209/25/2026
Domani Inspection Service8431608/19/2026
McNamara/Salvia of New YO4970502/10/2026
Mueser Rutledge Consulting977701/11/2026
Surface Design Profession3968111/25/2024
Building Lifecycle
All (199)Filed (38)Permit Issued (40)Violation (29)Inspection (2)Objection (60)Special Inspection (30)
10/16/2026
Filed — Alteration
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01431399-P1
10/06/2026
Permit issued — Standpipe
M01128646-S8-EW-SD
10/06/2026
Permit issued — Sprinklers
M01128646-S8-EW-SP
10/05/2026
Permit issued — Standpipe
M01128646-S9-EW-SD
10/05/2026
Permit issued — Mechanical Systems
M01128646-S6-MS
10/01/2026
Permit issued — Standpipe
M01128646-S9-EW-SD
10/01/2026
Permit issued — Standpipe
M01128646-S8-EW-SD
09/30/2026
Permit issued — Sprinklers
M01128646-S8-EW-SP
09/30/2026
Permit issued — Structural
M01128646-S2-ST
09/29/2026
Permit issued — Foundation
M01128646-S4-FO
09/29/2026
Permit issued — Support of Excavation
M01128646-S3-SE
09/25/2026
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01460632-I1
09/25/2026
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01460632-S1
09/25/2026
Permit issued — Supported Scaffold
M01460632-I1-SF
09/25/2026
Permit issued — Suspended Scaffold
M01460632-S1-SC
09/22/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-P5
09/15/2026
Permit issued — Sidewalk Shed
M01396260-S2-SH
09/15/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
09/15/2026
Special inspection requirement — Post-installed Anchors
Leo Lee
08/19/2026
Filed — New Building
Structural work in conjunction with NB # M01128646
M01128646-P9
08/06/2026
Permit issued — Sidewalk Shed
M01396260-S2-SH
08/04/2026
Permit issued — Protection and Mechanical Methods
M01128646-Z3-PMM
07/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
07/31/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JOHN MCMONAGLE
07/28/2026
Permit issued — Protection and Mechanical Methods
M01128646-Z4-PMM
07/20/2026
Filed — New Building
Structural work in conjunction with NB # M01128646
M01128646-Z4
07/20/2026
Permit issued — Construction Fence
M01128646-S5-FN
07/16/2026
Filed — Alteration
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01431399-I1
07/16/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-P3
07/16/2026
Permit issued — Protection and Mechanical Methods
M01431399-I1-PMM
06/24/2026
Objection resolved — Addressed
06/12/2026
Permit issued — Standpipe
M01128646-S8-EW-SP
06/12/2026
Permit issued — Sprinklers
M01128646-S8-EW-SD
06/11/2026
Objection raised — Other
06/01/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-P1
06/01/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-P2
05/26/2026
Filed — New Building
Structural work in conjunction with NB # M01128646
M01128646-Z3
05/14/2026
Permit issued — Protection and Mechanical Methods
M01396260-S3-PMM
05/14/2026
Permit issued — Sidewalk Shed
M01396260-S2-SH
05/13/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-S2
05/13/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-S3
05/07/2026
Permit issued — Protection and Mechanical Methods
M01396260-S1-PMM
05/07/2026
Permit issued — Protection and Mechanical Methods
M01396260-I1-PMM
05/06/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-I1
05/06/2026
Filed — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP
M01396260-S1
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/12/2026
Permit issued — General Construction
M01128646-I1-GC
03/12/2026
Objection resolved — Addressed
03/12/2026
Objection resolved — Addressed
03/11/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
03/11/2026
Special inspection requirement — Concrete - Cast-In-Place
VLADIMIR SEIJAS
03/11/2026
Special inspection requirement — Final
VLADIMIR SEIJAS
03/11/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
02/11/2026
Objection resolved — Addressed
Latest 60 of 199 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedCma Plumbing & Heating10/06/2026
DOB NOWSprinklersPermit IssuedCma Plumbing & Heating10/06/2026
DOB NOWStandpipePermit IssuedCma Plumbing & Heating10/05/2026
DOB NOWMechanical SystemsPermit IssuedEastern Air10/05/2026
DOB NOWStandpipePermit IssuedMill Brook Fire Protection10/01/2026
DOB NOWStandpipePermit IssuedMill Brook Fire Protection10/01/2026
DOB NOWSprinklersPermit IssuedMill Brook Fire Protection09/30/2026
DOB NOWStructuralPermit IssuedMonadnock Construction09/30/2026
DOB NOWFoundationPermit IssuedMonadnock Construction09/29/2026
DOB NOWSupport of ExcavationPermit IssuedMonadnock Construction09/29/2026
DOB NOWSupported ScaffoldPermit IssuedHexagon Group09/25/2026
DOB NOWSuspended ScaffoldPermit IssuedHexagon Group09/25/2026
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold09/15/2026
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold08/06/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedR.C. Structures08/04/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMonadnock Construction07/28/2026
DOB NOWConstruction FencePermit IssuedMonadnock Construction07/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold07/16/2026
DOB NOWSprinklersPermit IssuedCma Plumbing & Heating06/12/2026
DOB NOWStandpipePermit IssuedCma Plumbing & Heating06/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold05/14/2026
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold05/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold05/07/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold05/07/2026
DOB NOWGeneral ConstructionPermit IssuedMonadnock Construction03/12/2026
DOB NOWFoundationPermit IssuedMonadnock Construction01/21/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing Group01/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedR.C. Structures01/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedR.C. Structures01/14/2026
DOB NOWPlumbingPermit IssuedDonato Plumbing Group11/24/2025
DOB NOWFoundationPermit IssuedMonadnock Construction11/18/2025
DOB NOWStandpipePermit IssuedCma Plumbing & Heating11/14/2025
DOB NOWFoundationPermit IssuedMonadnock Construction10/30/2025
DOB NOWStructuralPermit IssuedMonadnock Construction10/30/2025
DOB NOWSupport of ExcavationPermit IssuedMonadnock Construction10/29/2025
DOB NOWConstruction FencePermit IssuedMonadnock Construction08/18/2025
DOB NOWConstruction FencePermit IssuedMonadnock General Cont07/25/2025
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises03/04/2022
DOB NOWSupported ScaffoldPermit IssuedReliable Enterprises09/10/2021
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises03/17/2021
2 projects · most recent 08/19/2026
Sprinkler System
FiledStatusContractorScope
08/19/2026Permit IssuedCma Plumbing & HeatingSprinkler System
01/31/2025———
1 project · most recent 08/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2026Permit IssuedDonato Plumbing GroupGas, Storm, Water/Sanitary
6 projects · most recent 10/12/2026
General Wiring Lighting HVAC Wiring Boiler Controls
FiledStatusContractorScope
10/12/2026Permit IssuedJam ElectricalGeneral Wiring
05/13/2026Permit IssuedNash Electric Services—
05/07/2026Permit IssuedAmber Lite Electric1 meters, 1 new_meters
05/06/2026Permit IssuedNash Electric Services—
12/17/2025Permit IssuedGlo ElectricGeneral Wiring, Lighting, HVAC Wiring, Boiler Controls
03/15/2021Permit IssuedRichard Neu—
1 project · most recent 08/19/2026
Concrete Masonry
FiledStatusContractorScope
08/19/2026Permit IssuedNuline McHncl ServicesConcrete, Masonry
5 projects · most recent 09/25/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
09/25/2026Permit IssuedHexagon GroupScaffold
09/22/2026Permit IssuedS&E Bridge & ScaffoldSidewalk Shed
08/19/2026Permit IssuedNuline McHncl ServicesFence
09/08/2021Permit IssuedReliable EnterprisesScaffold
03/15/2021Permit IssuedReliable EnterprisesSidewalk Shed
1 project · most recent 08/19/2026
Earthwork
FiledStatusContractorScope
08/19/2026Permit IssuedNuline McHncl ServicesEarthwork
1 project · most recent 09/25/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/25/2026Permit IssuedHexagon GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 88
DateRequirementInspectorRole
09/15/2026Post-installed AnchorsLeo Leespecial
09/15/2026Post-installed AnchorsLeo Leespecial
07/31/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/31/2026Post-installed AnchorsJOHN MCMONAGLEspecial
07/31/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
07/31/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
07/31/2026Maintenance informationJOHN MCMONAGLEenergy_progress
07/31/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
07/31/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJOHN MCMONAGLEspecial
03/11/2026Concrete - Cast-In-PlaceVLADIMIR SEIJASspecial
03/11/2026FinalVLADIMIR SEIJASprogress
03/11/2026Post-installed AnchorsJOHN MCMONAGLEspecial
03/11/2026MasonryJOHN MCMONAGLEspecial
02/05/2026Concrete - Cast-In-PlaceVLADIMIR SEIJASspecial
02/05/2026MasonryJOHN MCMONAGLEspecial
02/05/2026Post-installed AnchorsJOHN MCMONAGLEspecial
02/05/2026FinalVLADIMIR SEIJASprogress
01/13/2026UnderpinningJan Cermakspecial
01/13/2026Structural Stability – Alterations of existing buildingsJan Cermakspecial
01/13/2026Footing and FoundationJan Cermakprogress
01/13/2026FinalJOHN MCMONAGLEprogress
01/08/2026FinalJOHN MCMONAGLEprogress
01/08/2026Structural Stability – Alterations of existing buildingsJan Cermakspecial
01/08/2026Footing and FoundationJan Cermakprogress
01/08/2026UnderpinningJan Cermakspecial
Latest 25 of 88.
▾Documents — 207 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
09/04/2026M00486196-I1Request digital key ↗
09/03/2026M00590177-I1Request digital key ↗
08/25/2026M01128646-P8Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits1
▸DOB NOWHPD - Permit Notice1
08/13/2026M01128646-I1Open ↗
▸Zoning, Tax Lot & Property Records41
▸DOB NOWRestrictive Declaration/Easement 219
08/25/2026M01128646-S3Open ↗
08/25/2026M01128646-S1Open ↗
08/25/2026M01128646-S2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWRestrictive Declaration/Easement 119
08/25/2026M01128646-S1Open ↗
08/25/2026M01128646-S3Open ↗
08/25/2026M01128646-S2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M01128646-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01128646-I1Open ↗
▸Seals & Professional Certifications116
▸DOB NOWSpecial Inspector Seal & Signature41
09/23/2026M01128646-S8Open ↗
09/23/2026M01128646-S8Open ↗
09/23/2026M01128646-S8Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
09/12/2026M01128646-I1Open ↗
09/12/2026M01128646-I1Open ↗
09/12/2026M01128646-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
10/05/2026M01396260-P5Open ↗
09/03/2026M00590177-I1Open ↗
08/25/2026M01128646-P6Open ↗
Showing 3 of 36 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026M01128646-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/25/2026M01128646-I1—
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026M01128646-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/25/2026M01170382-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/25/2026M01128646-S1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M01128646-S1Open ↗
▸Other Documents6
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)3
08/25/2026M01128646-S4Open ↗
08/25/2026M01128646-P6Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProperty Ownership Certification1
08/13/2026M01128646-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M01128646-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M01128646-S3Open ↗