← Back
Church, synagogue, chapel
1484 5 AVENUE
MANHATTAN · Harlem (South) · BIN 1053259
💬 Discuss this project
1915Year Built
2Stories
M1Building Class
R7-2Zoning
1,384 sfGross Floor Area
1Units
0 Open Violations
Church, synagogue, chapel · Owner of record: 1484 5TH AVE LLC · 798 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof1p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2021$905K—MOUNT PISGAH A.M.E. CHURCH, INC. → OMEGA CONSTRUCTIONS SOLUTIONS LLC$654/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.411/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROWN REMODELING INCGeneral Contractor203/21/2026
GAROFALO PLMBNG & HTG LTDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781411/21/2022
Building Lifecycle
All (47)Filed (4)Permit Issued (2)Signed Off (2)Violation (1)Inspection (6)Objection (2)Special Inspection (30)
12/12/2022
Signed off — Alteration
PROPOSED INT. RENO., TO RESTORE THE EXIST. MIXED USE 1 FAMILY AND COMMERCIAL 2-STORY BLDG W/CELLAR TO ITS PRIOR LEGAL CONDITION. RESTORATION OF EGRESS AT 001 FLOOR TO ORIGINAL STATE. GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGES IN BULK, USE OR CofO.
M00692298-I1
11/28/2022
Signed off — Alteration
PROPOSED INT. RENO., TO RESTORE THE EXIST. MIXED USE 1 FAMILY AND COMMERCIAL 2-STORY BLDG W/CELLAR TO ITS PRIOR LEGAL CONDITION. RESTORATION OF EGRESS AT 001 FLOOR TO ORIGINAL STATE. GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGES IN BULK, USE OR CofO.
M00692298-S1
11/28/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/28/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Heating Systems
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Chimneys and vents
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Shutoff dampers
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Fenestration areas
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Metering
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
11/21/2022
Filed — Alteration
PROPOSED INT. RENO., TO RESTORE THE EXIST. MIXED USE 1 FAMILY AND COMMERCIAL 2-STORY BLDG W/CELLAR TO ITS PRIOR LEGAL CONDITION. RESTORATION OF EGRESS AT 001 FLOOR TO ORIGINAL STATE. GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGES IN BULK, USE OR CofO.
M00692298-P3
11/17/2022
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — Air barrier - visual inspection
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — Lighting controls
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — Shutoff dampers
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — Fenestration air leakage
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — Chimneys and vents
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
11/17/2022
Special inspection requirement — Metering
CHRISTIAN LOZADA
11/03/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/31/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/03/2022
Permit issued — Plumbing
M00692298-S1-PL
05/19/2022
Filed — Alteration
PROPOSED INT. RENO., TO RESTORE THE EXIST. MIXED USE 1 FAMILY AND COMMERCIAL 2-STORY BLDG W/CELLAR TO ITS PRIOR LEGAL CONDITION. RESTORATION OF EGRESS AT 001 FLOOR TO ORIGINAL STATE. GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGES IN BULK, USE OR CofO.
M00692298-P1
04/13/2022
Permit issued — General Construction
M00692298-I1-GC-CX
03/29/2022
Filed — Alteration
PROPOSED INT. RENO., TO RESTORE THE EXIST. MIXED USE 1 FAMILY AND COMMERCIAL 2-STORY BLDG W/CELLAR TO ITS PRIOR LEGAL CONDITION. RESTORATION OF EGRESS AT 001 FLOOR TO ORIGINAL STATE. GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGES IN BULK, USE OR CofO.
M00692298-S1
03/24/2022
Objection raised — Accessibility
03/24/2022
Objection resolved — Addressed
03/15/2022
Filed — Alteration
PROPOSED INT. RENO., TO RESTORE THE EXIST. MIXED USE 1 FAMILY AND COMMERCIAL 2-STORY BLDG W/CELLAR TO ITS PRIOR LEGAL CONDITION. RESTORATION OF EGRESS AT 001 FLOOR TO ORIGINAL STATE. GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGES IN BULK, USE OR CofO.
M00692298-I1
01/26/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGAROFALO PLMBNG & HTG LTD06/03/2022
DOB NOWGeneral ConstructionSigned-offCROWN REMODELING04/13/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
11/28/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/03/2022Fail-Final General Construction Non-Directive 14FailView ↗
10/31/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
11/28/2022FinalCHRISTIAN LOZADAprogress
11/28/2022Mechanical SystemsCHRISTIAN LOZADAspecial
11/28/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/28/2022Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
11/28/2022Heating SystemsCHRISTIAN LOZADAspecial
11/28/2022Chimneys and ventsCHRISTIAN LOZADAspecial
11/28/2022Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
11/28/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
11/28/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
11/28/2022Maintenance informationCHRISTIAN LOZADAenergy_progress
11/28/2022Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
11/28/2022Shutoff dampersCHRISTIAN LOZADAenergy_progress
11/28/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
11/28/2022HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
11/28/2022Lighting controlsCHRISTIAN LOZADAenergy_progress
11/28/2022Fenestration areasCHRISTIAN LOZADAenergy_progress
11/28/2022Fenestration air leakageCHRISTIAN LOZADAenergy_progress
11/28/2022MeteringCHRISTIAN LOZADAenergy_progress
11/28/2022Fenestration and door U-factor and product ratingsCHRISTIAN LOZADAenergy_progress
11/28/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
11/28/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
11/17/2022Interior lighting powerCHRISTIAN LOZADAenergy_progress
11/17/2022HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
11/17/2022Air barrier - visual inspectionCHRISTIAN LOZADAenergy_progress
11/17/2022Lighting controlsCHRISTIAN LOZADAenergy_progress
Latest 25 of 48.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/02/2026M00692298-P1Request digital key ↗
09/02/2026M00692298-P3Request digital key ↗
09/02/2026M00692298-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026M00692298-P3Open ↗
08/29/2026M00692298-P3Open ↗
08/25/2026M00692298-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026M00692298-I1Open ↗
09/02/2026M00692298-S1Open ↗
08/13/2026M00692298-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026M00692298-P3Open ↗
08/25/2026M00692298-I1Open ↗
08/24/2026M00692298-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00692298-S1Open ↗
08/14/2026M00692298-I1Open ↗
08/13/2026M00692298-P3Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00692298-I1Open ↗
08/13/2026M00692298-S1Open ↗