← Back
Elevator cooperative
1485 EAST 16 STREET
BROOKLYN · Midwood · BIN 3181470
💬 Discuss this project
1938Year Built
6Stories
D4Building Class
R5BZoning
56,892 sfGross Floor Area
54Units
LL97 CoveredRent Stabilized4 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 1485 E 16TH OWNERS CORP · 12,150 sf lot · 4.68 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 317p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1485 EAST 16 STREET OWNERS803/21/2026
METROPOLITAN PROPERTY SERVICES603/21/2026
1485 E 16TH OWNERS CORP103/22/2026
1485 EAST 16TH STREET COMPANY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MDG DESIGN GROUP511/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABI RESTORATION CORPGeneral Contractor303/21/2026
MAREK SZLEZAKElectrical103/21/2026
MICHAEL THOMPSONElectrical103/21/2026
HERBERT RUDERMANElectrical103/21/2026
THOMPSON MICHAELElectrical103/21/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
SZLEZAK MAREKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEAD ENGINEERING PC2665511/29/2025
Building Lifecycle
All (101)Filed (5)Permit Issued (2)Signed Off (2)Violation (60)Inspection (3)Objection (4)Special Inspection (25)
05/04/2026
Violation issued (HPD, closed)
A
12/03/2025
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3D. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00898318-I1
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
INHWAN CHANG
12/02/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
12/02/2025
Special inspection requirement — Lighting in dwelling units
INHWAN CHANG
12/02/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
12/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
12/02/2025
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
12/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
12/01/2025
Signed off — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3D. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00898318-S2
11/29/2025
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3D. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00898318-P3
11/10/2025
Special inspection requirement — Lighting in dwelling units
INHWAN CHANG
11/10/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
INHWAN CHANG
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
11/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
11/10/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
10/18/2025
Violation issued (HPD, closed)
B
10/18/2025
Violation issued (HPD, closed)
C
10/18/2025
Violation issued (HPD, closed)
B
10/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
INHWAN CHANG
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
08/01/2025
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3D. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00898318-P2
08/01/2025
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3D. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00898318-P1
06/10/2025
Permit issued — Plumbing
B00898318-S2-PL
06/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
06/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/09/2025
Violation issued (HPD, closed)
A
03/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
INHWAN CHANG
03/19/2025
Special inspection requirement — Energy Code Compliance Inspections
INHWAN CHANG
03/19/2025
Special inspection requirement — Tenant Protection Plan Compliance
INHWAN CHANG
03/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
03/19/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
03/19/2025
Special inspection requirement — Lighting in dwelling units
INHWAN CHANG
03/19/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
03/04/2025
Violation issued (HPD, closed)
B
02/04/2025
Violation issued (HPD, closed)
A
02/04/2025
Violation issued (HPD, closed)
C
02/04/2025
Violation issued (HPD, closed)
A
02/04/2025
Violation issued (HPD, closed)
A
02/04/2025
Violation issued (HPD, closed)
A
02/04/2025
Violation issued (HPD, closed)
A
02/04/2025
Violation issued (HPD, closed)
A
07/22/2024
Permit issued — General Construction
B00898318-I1-GC
04/09/2024
Violation issued (HPD, closed)
A
01/08/2024
Violation issued (HPD, closed)
B
01/08/2024
Violation issued (HPD, closed)
B
01/08/2024
Violation issued (HPD, closed)
A
08/10/2023
Objection raised — Scope
08/10/2023
Objection resolved — Addressed
08/10/2023
Objection resolved — Addressed
08/09/2023
Objection raised — Cost
08/02/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3D. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00898318-I1
08/02/2023
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. APARTMENT UNIT #3D. WORK INCLUDES NEW NON-LOAD BEARING WALL, NEW PAINT, REFINISH FLOORING, REPLACE PLUMBING FIXTURES, AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00898318-S2
02/04/2023
Violation issued (HPD, closed)
B
02/04/2023
Violation issued (HPD, closed)
B
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG06/10/2025
DOB NOWGeneral ConstructionSigned-offABI RESTORATION CORP07/22/2024
BISPLISSUEDZONE PLUMBING & HEATING C10/30/2018
BISOTISSUEDBIJOY CONSTRUCTION CORP08/15/2018
BISFBISSUEDAPPROVED OIL OF BKLYN,INC06/25/2014
BISPLISSUEDARCO PLBG AND HTG INC06/25/2014
BISOTISSUEDBIJOY CONSTRUCTION CORP08/24/2011
BISOTISSUEDBIJOY CONSTRUCTION CORP07/12/2011
BISOTISSUEDBIJOY CONSTRUCTION CORP07/12/2011
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM12/16/2005
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM07/28/2005
BISBLISSUEDBAYSIDE FUEL08/14/2003
BISEQISSUEDSPRING SCAFFOLDING07/23/2002
BISFSISSUEDMAXWHALE CORP.12/14/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
12/02/2025Tenant Protection Plan ComplianceINHWAN CHANGspecial
12/02/2025Interior lighting powerINHWAN CHANGenergy_progress
12/02/2025Lighting in dwelling unitsINHWAN CHANGenergy_progress
12/02/2025Lighting controlsINHWAN CHANGenergy_progress
12/02/2025Fire-Resistance Rated ConstructionINHWAN CHANGprogress
12/02/2025Energy Code Compliance InspectionsINHWAN CHANGprogress
12/02/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
11/10/2025Lighting in dwelling unitsINHWAN CHANGenergy_progress
11/10/2025Interior lighting powerINHWAN CHANGenergy_progress
11/10/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
11/10/2025Tenant Protection Plan ComplianceINHWAN CHANGspecial
11/10/2025Energy Code Compliance InspectionsINHWAN CHANGprogress
11/10/2025Fire-Resistance Rated ConstructionINHWAN CHANGprogress
11/10/2025Lighting controlsINHWAN CHANGenergy_progress
08/14/2025Tenant Protection Plan ComplianceINHWAN CHANGspecial
08/14/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
06/10/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
06/10/2025Tenant Protection Plan Compliance—special
03/19/2025Fire-Resistance Rated ConstructionINHWAN CHANGprogress
03/19/2025Energy Code Compliance InspectionsINHWAN CHANGprogress
03/19/2025Tenant Protection Plan ComplianceINHWAN CHANGspecial
03/19/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
03/19/2025Interior lighting powerINHWAN CHANGenergy_progress
03/19/2025Lighting in dwelling unitsINHWAN CHANGenergy_progress
03/19/2025Lighting controlsINHWAN CHANGenergy_progress
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026B00898318-I1Request digital key ↗
08/27/2026B00898318-P3Request digital key ↗
08/27/2026B00898318-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION7
11/01/2018321772667Open ↗
08/16/2018321772667Open ↗
07/18/2014321057324Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
06/12/2018321772667Open ↗
09/09/2011320350160Open ↗
06/07/2011320316564Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature15
09/17/2026B00898318-P1Open ↗
09/17/2026B00898318-P1Open ↗
09/17/2026B00898318-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/02/2026B00898318-P2Open ↗
09/17/2026B00898318-P1Open ↗
09/17/2026B00898318-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
06/07/2019321772667Open ↗
06/12/2018321772667Open ↗
03/02/2017321057324Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00898318-I1Open ↗
08/27/2026B00898318-P1Open ↗
08/13/2026B00898318-P3Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/18/2014321057324Open ↗
09/09/2011320350160Open ↗
06/07/2011320316564Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/09/2011320350160Open ↗
06/07/2011320316564Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/18/2014321057324Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/12/2018321772667Open ↗
07/18/2014321057324Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
04/29/2015321057324Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/18/2014321057324Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026B00898318-I1Open ↗
08/27/2026B00898318-P1Open ↗
08/27/2026B00898318-S2Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
09/09/2011320350160Open ↗
06/07/2011320316564Open ↗
05/31/2011320314067Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/12/2018321772667Open ↗
07/18/2014321057324Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/07/2019321772667Open ↗
06/12/2018321772667Open ↗
07/18/2014321057324Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/03/2019321772667Open ↗
03/02/2017321057324Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
04/30/2015321057324Open ↗
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS4
07/18/2014321057324Open ↗
09/09/2011320350160Open ↗
06/07/2011320316564Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/07/2019321772667Open ↗
07/18/2014321057324Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
07/03/2019321772667Open ↗
03/02/2017321057324Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
06/07/2019321772667Open ↗
06/12/2018321772667Open ↗
03/02/2017321057324Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
06/12/2018321772667Open ↗
07/18/2014321057324Open ↗
09/09/2011320350160Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
07/03/2019321772667Open ↗
06/07/2019321772667Open ↗
▸BISADDITIONAL INFORMATION1
01/09/2017321057324Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/02/2017321057324Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
07/26/2018321772667Open ↗